advertisement
▼
Scroll to page 2
of 4
Shower Pan Installation Instructions Tools you might need for proper installation • • • Screws Levels Shims Acrylic Shower Pan Installation Instructions • Tape Measure Tools you might need for proper installation • Screws • Level you •for Shims purchasing • Thank Praxis Bathware. For best results, please read and follow all directions carefully. Thank you for purchasing Praxis Bathware. For best PRE-INSTALLATION PLANNING results, please read and follow all directions carefully. 1. Review Figures 5 and 6. MakePLANNING sure alcove Pre-INSTALLATION is of proper size. Framing alcove mustKeep reflect Do not store units out of doors.out of interior dimensions on diagram to permit installation sunlight and exposure to weather. 1.Note Review Figures 5 6. Make sure alcove of unit. in diagram theand required opening in is oftoproper Framing must reflect the floor providesize. clearance for alcove the drain trap interior dimensions on diagram to permit installation and fitting connection. of unit. Note in diagram the required opening in the floor to provide clearance for the drain trap 2. Before installation, carefully inspect the shower and fitting connection. pan for damage or defects. If any are noted, 2. Before installation, carefully inspect the shower pleasepan contact the dealer where Ifyou for damage or defects. anypurchased are noted,the shower pan before proceeding with installation. please contact the dealer where you purchased the shower pan before proceeding with installation. 3. Wall water resistant finished 3.board Woodwith shims are provided with the material shower pan. These shimstile must be placed undertothe back such as ceramic must be installed complete edge ofenclosure. the shower to provide of the the shower Plan for use bottom of thesesupport materials. shower floor. 2-shims minimum required. Tape Measure (See Figure 4 for more details) INSTALLATION PROCEDURE 4. Wall board with water resistant finished material 1. Make certaintile your recessed framed pocket is square such as ceramic must be installed to complete and plumbenclosure. in accordance with the shower Plan for userough-in of these dimensions. materials. Dimensions shown Framing Diagram Figure 6 is 1/8” (See Figure 4 for moreindetails) wider than the unit to provide “Wiggle Room”. INSTALLATION PrOcedure 1.2.Make your recessed framed pocket is square Finish certain rough plumbing, but leave unstrapped at this and plumb accordance stage. Findindrain line andwith traprough-in locationsdimensions. as shown in Dimensions Figure 4. shown in Framing Diagram Figure 6 is 1/8” wider than the unit to provide “Wiggle Room”. 2. Finish rough plumbing, but leave unstrapped at this 3. Install on shower base. Pry the strainer stage. Finddrain drainfitting line and trap locations as shown in plate 4. off the drain body. Disassemble the locknut and Figure gaskets. thick beadbase. of 100% silicone caulking to 3.two Install drainApply fittingaon shower Pry the strainer the drain hole area in the shower and insert the drain body. plate off the drain body. Disassemble the locknut and Install the rubber washer and locknut that order. (See two gaskets. Apply a thick bead of 100%insilicone caulking to the drain hole area in the shower and insert Figure 2). the drain body. Install the rubber washer and locknut in that order. (See Figure 2). NO-CAULK SHOWER DRAIN ASSEMBLY Strainer Rubber Caulking Gasket Drain Body NEO CORNER SHOWER PAN Silicone Caulk Shower Base Rubber Washer Fiber Washer SQUARE OR RECTANGULAR SHOWER PANS Figure 1 Locknut Figure 2 Acrylic Shower PanShower Pan Instructions InstallationInstallation Instructions Tighten the locknut. Wipe Wipe away excess caulking from the Tighten the locknut. away excess caulking from the finished side that squeezed from the fitting beforebefore it finished sidehas that has squeezed from the fitting it cures.cures. Place Support Shims 4. Remove the rubber caulking gasket. This will permit the 2”the waste pipecaulking to slip into theThis drain 4. Remove rubber gasket. willassembly permit when the shower base is lowered into place. (If using a solvent the 2” waste pipe to slip into the drain assembly when the weld drain, this step). installing the shower base over a shower baseomit is lowered intoIfplace. (If using a solvent weld or crawl space, the the waste drain, basement omit this step). If installing showerpipe basemay overbea installed after or thecrawl shower is placed in the framed pocket. basement space, the waste pipe may be installed 5. Once the framing pocket is complete, after the shower is placed in the framed pocket.and drain fitting installed, the next step is to determine the location of the wood that must be placed under the back isedge of 5. Shims are shims recommended. Once the framing pocket the shower. complete, and drain fitting installed, the next step is to 6. Trial level the pan outside the framing pocket to determine the location of the wood shims that must be determine the location of the wood shims. On a flat placed under the back edge of the shower. surface, level the shower pan in two directions: Place the level on top of the threshold, and along the finished flat 6. Trialsides. level the panthe outside the wood framingshims pocket to the board Install provided under determine the location of the wood shims. On a flatshims along the back edge of the shower. Slide the surface, level shower two directions: until thethe shower panpan sitsinsolid, plumb andPlace level the in both level on top of the threshold, and along thethe finished flat of the directions. Draw a pencil line along front edge sides. threshold. Install the wood shimsthe under the board Then mark location of the along shims.the Setback the edge of theaside. shower. Slide the marks shims until the shower pan the pan Using these as reference, transfer location the level shimsintoboth the framing pocket. sits solid, plumbofand directions. DrawSecure a pencilthe shimsthe to front the sub floor fasteners Then or panel adhesive so line along edge of with the threshold. mark the they shift. location ofwill the not shims. Set the pan aside. Using these marks as 7. Now move shower pan Position the unit at reference, transfer the location ofinto the place. shims to the framing the open end of the framed pocket. Align the lower pocket. Secure the shims to the sub floor with fasteners oredge the apron in approximate panel of adhesive so they will not shift.position and tilt back into place. Carefully guide the drain pipe though the shower drain assembly. Lower until the shower pan contacts the 7. Now move shower pan into place. Position the unit at wood shims secured to the sub floor. (See Figure 3). the open end of the framed pocket. Align the lower edge 8. Repeat the leveling process as performed in the trial fit. of the apron in approximate position and tilt back into Place the level along the top of the threshold, and along place.the Carefully guide the drain pipeside. though theadjustments shower are finished surface on each If any drain required, assembly. Lower until the shower pan contacts the remove the pan and shift the shims accordingly. wood9. shims secured to the sub floor. (See Figure 3) When satisfied with the fit, pre-drill a 1/8” hole through the mounting flanges into each framing stud. 8. Repeat the leveling processthese as performed in the fit. pan Carefully counter-sink holes. Mount thetrial shower Place to thethe level along the top of the threshold, and along studs using galvanized screws. the finished surface on each side. any adjustments areshower 10. Finish installation of theIf drain pipe into the required, remove the pan and shift the accordingly. drain assembly. If necessary, trimshims the pipe length. Use soap to lubricate the rubber caulking gasket. Slip the gasket around pipe and pusha down until it seats in 9. When satisfied withthethe fit, pre-drill 1/8” hole the drain body. Snap on the strainer plate to complete the through the mounting flanges into each framing stud. installation. NOTE: Praxis Companies is not responsible Carefully counter-sink these holes. Mount the shower pan leaking connections. to thefor studs usingdrain galvanized screws. Proper installation of the Figure 3 Install Support Shims Stud Line Level The Pan Shims 2” Waste Pipe 6” TYPICAL CROSS SECTION Tile Tile Adhesive Caulk 1/8” Gap Wall Board Screw Stud Line Finishing Detail of Mounting Flange Screw or Nail Stud Line Shower Base Figure 4 Shower Pan Installation Instructions 10. Finish installation of the drain pipe into the shower drain assembly. If necessary, trim the pipe length. Use soap to lubricate the rubber caulking gasket. Slip the gasket around the pipe and push down until it seats in the drain body. Snap on the strainer plate to complete the installation. NOTE: Praxis Companies is not responsible for leaking drain connections. Proper installation of the drain assembly and pipe is installers responsibility. 11. Finish wall materials above the shower pan is of owners or installers preference. The diagram in Figure 4 details an example of a typical wall enclosure. In this example, a thin wood strip is attached to each framing stud above the shower mounting flange. This will allow the wall board to be installed plumb and slip down over to cover the mounting flange and mounting screws. (Using the wood strips is optional, however wall board should always cover the mounting flanges). Leave a 1/8” gap between the bottom edge of the wall board and the finished surface of the shower pan. Caulk this gap. CARE AND CLEANING DO NOT USE ABRASIVE CLEANERS. The most important caution is to avoid use of harsh abrasive cleaners or gritty scouring powders. To clean the unit, simply use a household liquid detergent with soft sponge cloth and warm water. More persistent stains, tar, or paint can be removed with naptha or mineral spirits. Remove excess plaster by scraping with a sharpened soft wood stick. Avoid wire brushes, metal scrapers or tools. Restore dull areas by rubbing with automotive type body cleaning compound. LIMITED WARRANTY Units manufactured of fiberglass reinforced polyester resin, that it will, free of charge, repair or exchange as its option, any Praxis Companies unit found to be defective in materials or workmanship upon inspection by an authorized representative of Praxis Companies for a period of three (3) years from date of purchase for Gelcoat faced units, Five (5) for Acrylic faced units and Ten (10) for Solid Surface units. The exchange of a unit is limited to supplying a replacement unit of comparable size and style and does not include any costs of removal or installation. This warranty shall be voided if the unit is moved from its place of initial installation or is not installed in accordance with the instructions supplied by the manufacturer of the unit. Further, this warranty does not apply if the unit has been subjected to accident, abuse, misuse, damage caused by flood, fire or act of God. Since local code requirements vary greatly throughout the country, distributors, dealers, installation contractors and users of plumbing products should determine whether there are any code restrictions on the use of a specific product. Praxis Companies makes no representation or warranty regarding and shall not be responsible for any code compliance. The owner agrees by use of this unit that the obligations of Praxis Companies shall not exceed to contingent or indirect damage or injury to the structure of its contents, that the obligations of Praxis Companies are limited to those set forth herin, and that no other obligations, expressed or implied, are assumed by Praxis Companies. Contact: Praxis Companies Warranty Department (800) 443-7269 Ext: 130 [email protected] 2015, The Praxis Companies, LLC 435 Industrial Rd., Savannah, TN 38372 Customer Service: 800.443.7269 www.praxiscompanies.com © or gritty scouring powders. To clean the unit, simply use a household liquid detergent with soft sponge cloth and warm water. More persistent stains, tar, or paint can be removed with naptha or mineral spirits. Remove excess plaster by scraping with a sharpened soft wood stick. Avoid wire brushes,Pan metal scrapers or Shower tools. Restore dull areas by rubbing with automotive Instructions type bodyInstallation cleaning compound. 4 details an example of a typical wall enclosure. In this example, a thin wood strip is attached to each framing stud above the shower mounting flange. This will allow the wall board to be installed plumb and slip down over to cover the mounting flange and mounting screws. (Using the wood strips is optional, however wall board should always cover the mounting flanges). Leave a 1/8” gap between the bottom edge of the wall board and the finished surface of the shower pan. Caulk this gap. FRAMING DIMENSIONS Wood Shims 81” 4 SB6032L (Shown) SB6032R Opposite C A 6” x 6” D 6” x 6” A B D C B Figure 5 A B C D AB3448 48 1/8” 34” 24” 16 1/4” AB3460 60 1/8” 34” 30” 16 1/4” AB3636 36 1/8” 36” 18” 17 1/4” AB4242 42 1/8” 42” 21” 20 3/8” AB6032 L-R 60 1/8” 32” 8 1/4” 15” 16” 16” MODEL NO. ABC3838 38 1/8” 38 1/8” ABC4242 42 1/8” 42 1/8” 20 1/4” Copyright 2015 20 1/4” PRANATPAN/0315
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project