Exaco RIGA XL Kit Use and Care Manual
Below you will find brief information for greenhouse Riga XL Type IV, greenhouse Riga XL Type V, greenhouse Riga XL Type VI. The Riga XL series of greenhouses are great for any gardener looking to get a head start on the growing season. These greenhouses are easy to assemble and come with all the necessary parts and instructions. They are made of high-quality materials and are built to last, ensuring years of enjoyment for any hobby gardener.
PDF
Download
Document
Advertisement
Advertisement
ALUMINIUM Greenhouse Riga XL As at 10/2009 Assembly Instructions Type IV Type V Type VI Dear Garding Friend, thank you for buying a top quality greenhouse from HOKLARTHERM in Germany. Please read these Assembly Instructions and helpful suggestions carefully. If you follow them step by step you should not have any difficulty assembling your EXTRA LARGE RIGA Greenhouse. Good Luck! What to do First: Check all the boxes you have received. Make sure you have received the correct number as shown on the Bill of Lading from the freight carrier. If you are missing a box or if any of the boxes are damage please write this down on the Bill of Lading, before the driver leaves. Note: Please do not refuse any of the boxes or the whole shipment, because of any damage. We will gladly replace any damaged items. Sending replacement parts is much simpler, quicker and less costly for all involded. In the case of damage: Please, if possible, make digital pictures and contact our USA distributor ASAP: Excaco Trading, Austin, TX: Customer Service: 877-760-8500 or by email at: [email protected]. Placing your greenhouse: When possible place your greenhouse in a location with as much sun as possible. We do not recommend putting it directly under trees since branches might damage the glazing. Protection from heavy winds: If your area is subject to very strong wind gusts we strongly recommend against putting your greenhouse up without some kind of protection: a row of small trees, large shrubs of a wooden fence. Please contact our distributor to discuss additional anchoring options. Direction: If you intend to primarily grow vegetables: north-south; for flowers: east-west. Warning: Do not try to assemble this greenhouse in windy conditions, as your glazing panels might blow away and become damaged. Damages during assembly process, due to bad weather, are not covered by our warrantly. 2 What you will need: - Patience - do not rush - 2 people (3 will make it easier - when inserting the glazing panels) - Gloves - the ends of the aluminium profiles can be „sharp“ - Measuring tape - 2 A-frame step ladders (10‘ and 8‘ preferable) - 2 Rubber mallet - Adjustable wrench - 10 mm socket wrench - 10 mm wrench - Philips head screwdriver (manual and electric) - Level - Permanent Marker (to mark glazing panels) Depending on the greenhouse you have received 9 to 10 boxes: Quantity Content table 1x Basic constructions Gables Page 5 1x Basic constructions Long parts (with floor profile - gable) Page 5 1x Roof window/door 1x Accessories 2x bundles Page 7 und 8 Seals, automatic window opener, etc. Page 6 - 8 Curved center profiles Page 5 2x Glazing Page 1x Foundation frame Special accessories: (special accessories) Table-shelf, Shelf for pots 3 Page 8 ever a box extra Contents of main box - basic construction Please check out the tables, the completeness of the components. Profiles for both gables: Profile design Pos. Description Quantity Length [mm] 4145 1 Front/Back floor profiles 2 2 Edge stay bar - curved - right side 2 3 Edge stay bar - curved - left side 2 4 Vertical profile - middle - left - with 50° angle at top 2 1929 5 Vertical profile - middle - right - with 50° angle at top 2 1929 6 Vertical door profile - left - with 30° angle at top 2 2641 7 Vertical door profile - right - with 30° angle attop 2 2641 8 Crossbar 10 952 Profiles for side walls: Pos. Type Profile design IV V Quantity/Length [mm] Description VI 16 17 18 Floor profile - side 19 Curved center profiles 20 21 22 Lateral supports (wind braces) 25 Cross bar - under window 26 27 28 Roof beam 29 30 31 Re-enforcement bar roof beam 4 Type IV Type V Type VI 2 3914 2 4909 2 5903 6 8 10 4 3970 4 4965 4 5960 2 952 4 952 4 952 1 4013 1 5008 1 6002 1 3971 1 4966 1 5960 Accessories bag basic construction Part design Pos. Description Quantity 100 Plastic corner connector 101 Straight connector plate 102 T-connector slanted 103 T-connector 104 T-connector slanted 105 Floor profile connectors 107 Hexagon head screw M6 x 16 + nuts M6 108 Washers (f. pos. 8) 110 Insulation seal 6 - 8 thick 111 Phillips head screws 4,2 x 13 142 Phillips head screws 4,2 x 50 113 Phillips head screws 4,8 x 16 114 Roof beam - end cap/cover plate 115 Connector plate 116 Floor profile corner connector covers 117 Self drilling screws 3,5 x 13 4 for cross bars above doors 4 for door upright and edge clamp 4 door profiles to cross bars 8 vertical profile middle/cross bar/ edge clamp 4 inside 4 screws for feeding 160* to be used in the later support connections 28 used on the inside See table below. for cross bar/roof beam- end cap/ cover plate 12 for cross bars in front and back walls 4 for floor profile corner connectors 16 2 for cross bars under windows 4/8/8 depends on type 4 t-connector 102 + 104 32 *plus substitute screws Heavy insulation seal 6- 8 mm in pre cut section Length Type Riga XL IV Riga XL V Riga XL VI 952 mm 571 mm 12 pc 14 pc 16 pc 4 pc 4 pc 4 pc 5 Profiles for each roof window Profile design Pos. Description Quantity Length [mm] 34 Window profile - roof 2 865 35 Window profile - roof 2 993 Quantity Length [mm] Profiles for each divided revolving door - at the bottom Profile design Pos. Description 44 Door profile - left with borings for Sash lock 1 887 45 Door profile - right with hinge borings 1 887 46 Door profile - top 1 864 48 Door profile - bottom 1 864 47 Rectangular tube 1 933 Quantity Length [mm] 1 949 1 949 1 864 1 864 Quantity 1 2 2x left 2x right Length [mm] 974 1027 with cross holes Profiles for each divided revolving door - top Profile design Pos. Description 41 Door profile - left 42 Door profile - right 48 Door profile - top 43 Door profile - bottom with hinge borings with large hole for door handle Accessories and hardware for each roof window Part design Pos. Description * 126 T-seal 127 Plastic corner connector 112 Phillips head screws 4,2 x 60 8 107 Hexagon head screws M6 x 16 + nut M6 3 143 Glazing block 30 x 16 x 4 2 * Note: The rubber seal is bundled in one hank for all doors and windows. Cut accordingly please. 6 Accessories bag for divided revolving door - at the bottom Part Design Quantity Pos. Description * 135 Hinge 2 136 Sash lock 1 137 End cap for rectangular tube 2 138 T-seal 2 2 139 Phillips head screw 4,8 x 25 (for hinges) 4 140 Phillips head screw 4,8 x 16 (for hinges) 4 112 Phillips head screw 4,2 x 60 (for doors) 8 141 Phillips head screw 3,5 x 22 (sash lock) 2 142 Phillips head screw 4,2 x 50 (to attach square tube) 2 143 Glazing block 30 x 16 x 4 2 127 Plastic corner connector 2x left 2x right Length [mm] 936 973 Accessories bag for divided revolving door - top Part design see page 19/20 * Quantity Pos. Description 150 Door sets, 8-piece (Assembly see page 18.) 1 112 8 Phillips head screws 4,2 x 60 (door) 143 Little white spacers 30 x 16 x 4 2 153 T-seal 2 2 135 Hinge 2 139 Phillips head screws 4,8 x 25 (hinges) 4 140 Phillips head screws 4,8 x 16 (hinges) 4 136 Sash Lock 1 141 Phillips head screws 3,5 x 22 (Sash Lock) 2 158 Door holder - black - 2 parts 1 159 Phillips head screws 3,5 x 16 (door holder) 4 127 Plastic corner connectors 1x left 1x right * Note: The rubber seal is bundled in one hank for all doors and windows. Cut accordingly please. 7 Length inches 966 973 Attaching the foundation frame (special accessories) Profile and accessoiries for foundation frame: Profile/part design Pos. 6.1 6.2 6.3 117 118 Description Foundation frame profile for gable Foundation frame profile for sides Foundation corner connectors 40/40/2 Hexagon head screw M6 x 12 + nut M6 Self drilling screw 3,5 x 13 Quantity/Length inches Type IV Type V Type VI 2 2 2 4100 4100 4100 2 2 2 3869 4864 5858 4 4 4 135 135 135 36 40 44 8 8 8 Assembly of foundation frame 1. 2. 3. 1. The foundation frame individually in the floor profiles rotate and align the center. Note: Foundation frame profiles are shorter than the floor profiles. 2. For each profile 2 self drilling screws 3,5 x 13 (pos. 118) fixation. 3. Both sides fill up with soil! Already assembled compensation profile! Note: Foundation frame profiles are shorter than the floor profiles. For stabilization purposes of the house some plates (pos. 6.4) will be screwed on the foundation frame and lateral stay bars or door profiles by means of pulled in screws M6. Insert one screw M6 x 12 into each of the corners of the foundation frame profile, detach angles and screw down with nut M6. 8 Establishment greenhouse Mounting brackets for the basis profile to doweling on customer requires a foundation. Part design Pos. Quantity/Length in mm Type IV Type V Type VI Description 6.7 Mounting brackets XL 14 16 18 107 Hexagon head screw M6 x 12 + nut M6 56 64 72 Note: In the floor profiles (gable/side) each with 2 screws M6 x 12 per rung by means of mounting brackets XL. Lateral stay bar (pos. 4/5/6/7/19) Mounting bracket XL Hexagon head screw M6 x 12 + nut M6 (pos. 107) We recommend to use hexagon head cap wood screws and pegs included for pegging. These are not within the scope of delivery! 9 Foundation plan Riga XL (All the dimensions in [mm]) Establishment of your greenhouse with „stripe-foudation“ If you did not buy a foundation frame, the greenhouse has to be erected safely by means of a stripe-foundation. Please arrange then such a foundation according to the dimension presets given below. You also have the possibility to found your greenhouse on flash kerb edge beams. (for ex.: 50 x 25 x 8 cm or better 50 x 30 x 10 cm) Please pay attention to the foundation being even and horizontal. Then fasten the greenhouse by the supplied angles with dowels 8/10 mm (2 pc.) per side minimum) into the concrete. top edge of earth Screws and dowels is not a part of the delivery. to found free of frost 10 outer edge of foundation outer edge of greenhouse foundation greenhouse Assembly course gable Warning: If you have bought the foundation frame, it has to be attached to the base profiles FIRST! (Page 8) vertical profile middle, left (pos. 6) vertical profile middle, right (pos. 7) Step 1 inside 1x Attention: Before assembly inserting required M6 x 16 (pos. 107) in groove. In addition, per vertical profile pushing 2 screws M6 x 12 (pos. 117) for mounting brackets XL (pos. 6.7) . Step 2 Riga XL 980 x 944 az Gl inside 1x ing az Gl ing floor profile (pos. 1) Phillip head screw 4,2 x 13 (pos. 111) After the insertion of the screws, the plastic corner connectors (pos. 100) are laterally placed. Step 3 Attention: Introduce necessary screws M6 x 16 (pos. 107) in profile groove before assembly. Step 4 View from inside 4x 4x Riga XL 980 x 944 Crossbar (pos. 8) in az Gl Crossbar (pos. 8) az Gl g ing T-connector (pos. 103) 4x 4x With inserted screw m6 x 16 and nut M6 the t-connector (pos. 103) assembled. Step 5 View from inside Attention: Introduce necessary screws (pos. 107) View from inside in profile groove before assembly. Step 6 Attention: Introduce necessary screws M6 x 16 (pos. 107) in profile groove before assembly. crossbar (pos. 8) 4x 1x 1x crossbar (pos. 8) 4x 4x verticale profile - middle (pos. 4 ) verticale profile - middle (pos. 5) 4x t-connector (pos. 103) crossbar (pos. 8) crossbar (pos. 8) screwed with Phillips head screw 4,2 x 50 (pos. 142). 4x Crossbar with t-connector (pos. 103) and inserted screw M6 x 16 and nut M6 (pos. 107) connectect. 11 Step 7 View from inside ing az Gl Crossbar (pos. 8) with straight connector plate (pos. 101)and screws inserted M6 x 16 (pos. 107) and Nut M6 connect. Gl az g in laz ing G Straight connector plate (pos. 101) Gl az ing az Gl ing Step 8 View from inside s. po Attention: Introduce necessary screws M6 x 16 (pos. 107) in profile groove before assembly. e e dg * y sta rba d( rve cu 2) ed ge sta yb 2x 2x # ar -c urv ed # (po s. 3) * * 2x in vertical profile - middle (pos. 4 + 5) # 2x in crossbar (pos. 8) Step 9 Here are connected with self drilling screws 3,5 x 13 (pos. 117). View from inside T-connector - slanted (pos. 102) t-connector - slanted (pos. 104) Edge stay bar (pos. 2 + 3) with t-connectors - slanted (pos. 102) und 4 (pos. 104) and screws M6 x 16 inserted screwed with nut M6 (pos. 107) on the crossbar. The t-connectors are connected with self drilling screws (pos. 117) on the edge stay bar. 12 Assembly course gable Warning: If you have bought the foundation frame, it has to be attached to the base profiles FIRST! (Page 8) Attention: Introduce necessary screws M6 x 16 (pos. 107) in profile groove before assembly. * . 16 pos pos. 2 Step 10 Step 11 Attach roof beam to back gable with endcap/cover plate (pos. 114) with Philips head screws 4,2 x 13 (pos. 111) po floor profile connector (pos. 105) + screw M6 x 16 + nut M6 (pos. 107) s. 1 1x m ea s. po 26 fb roo inside 1x s. Move into each vertical profile (po or. s file ect - middle - 2 hexagon head pro conn r o screws (pos. 107) for the flo ner mounting brackets (pos. 6.7). the cor n he ti Pu on t ) 16 support ends or left hold up Step 12 Front gable to assemble the same way later! Step 13 Curved center profiles (pos. 19) enlarged! Insert the glazing panel on each side - they will bend. Insert first into the floor profile, then into roof beam. Usually, this will take 3 people. Insert curved center profiles (pos. 19) top into roof beam and below into floor profile. Push straight on up to glazing and „thread“ pane. Step 14 Step 15 Push in further lateral glazing and curved center profiles. Roof window position important! 1x Screw down connector plate (pos. 115) from inside with screw M6 x 12 and nuts. 1x Attention: Introduce necessary screws M6 x 16 (pos. 107) in profile groove before assembly. In cross bar (under window) (pos. 25) 3x M6 x 16. 13 Attention: Introduce necessary screws M6 x 16 (pos. 107) in profile groove before assembly. Glazing of eaves and roof window and curved center profiles to push in completely. Roof window position important! Step 16 Step 17 floor profile connector (pos. 105) + screw M6 x 16 + nut M6 (pos. 107) Build in doors and windows. Place door gable in front and screw down. mounting roof window false!!! right! Screw floor profile corner connector (pos. 116) in with screw 4,8 x 16 (pos. 113). Then you should look for: Step 18 Press sealing 6 - 8 mm in front between floor profile and glazing; between floor profile and lateral glazing (all inside of greenhouse). Attention: Please compress the seals, because it contracts in cold weather. Hexangon bolts can be inserted later into most of profiles through a special „hole“ in the channel. If there is no hole you can drill one yourself. For a better detail the panes are shown being cut. T-sealings (pos. 126, 138, 153) for all doors and windows (altogether ca. 26 m). Die Stabilisierungs-/Bortenwinkel (Pos. 20/21/22) werden beidseitig innen an Mittelsprossen mit Schraube M6 x 16 und Mutter M6 (Pos. 107) und Unterlegscheibe (Pos. 108) angeschraubt. Die Winkel sind auch rückwärtige Profile für Tische und Regale. (Siehe separate Montageanleitung!) Attention: The t-seal goes only on 3 sides of the roof window - not the top bar profile. pos. 3 s. 2 s. po 4 .3 35 s po Attention: The t-seal must be inserted first in the top profile of the bottom door before assemble the rectangular tube. po 6 .2 s po pos. 2 pos. 6 s. 8 po po s. s. 1 8 pos. 5 pos. 7 pos. 4 . 19 po . 19 .8 8 pos po s . 19 s. 5 .2 s po pos po pos 8 3 s. s. po po 8) ,1 s. po 17 6( 1 14 Assembly roof window plastic corner connector (pos. 127) window profile (pos. 34) (No sealing to insert in this profile! Recommendation! It is useful to seal the panes all around and the corner connectors to avoid any penetration of humidity. Attention: Insert 2 screws in the cross-section at the bottom - for window opener! window profile (pos. 35) window profile (pos. 35) Screw down three profiles first with screw 4,2 x 60 (pos. 112), insert glazing and fix fourth profile. Phillips head screw 4,2 x 60 (pos. 112) window profile (pos. 34) Automatic window opener mounting roof window false!!! right The roof window is to push from the lateral into the roof beam. Mounting of the automatic window opener. 15 Components window openers 1 2 3 4 5 window opener pressure cylinder splint pin mounting plate window profile mounting plate cross bar 3 1 4 2 5 Operation of a window opener Assembling instructions: 1. Check, that the window of the greenhouse can open and close freely and without hindrance. For other brands please dismantle the existing handopener in advance. 2. At first you mount the window openers with the mounting plate (4) on the window profile (5). 3. Choose mounting plate (5) when you ask the average hole and attach it to the crossbar below window. 4. Please secure the pressure-cylinder in the threaded device at the upper end with a splint pin in the t-coupling (upper hole). Justification: The window opener needed for the assembly approximately 3 to 4 hours to adapted the temperature in the greenhouse. The more you screw in the pressure-cylinder into the threaded device, the further open the roof window. Do you want earlier/higher opening, turn the pressure-cylinder clockwise. For later/lower opening counter-clockwise. One rotation corresponds to approximately 0,5°C. Please keep the mind that can vary the temperature in your greenhouse and different windows opener have small tolerances. Winter storage: If you are not the greenhouse „frost-free“ hold, we recommend the entire window opener or just the pressure cylinder dismantle. Please keep the window opener in a dry and frost-free place. Before remounting in the spring particularly, check the cylinder rod and the cylinder threads are greased. The cylinder rod please look for ease of movement. 16 Mounting divided revolving door - at the bottom View from outside Place the profiles according to the figure on a flat surface (possibly on a cardboard or similar). retangular tube and door-profile - top screwed with 4,2 x 50 (pos. 142) plastic corner connector (pos. 127) Attention Earlier move seal. (See scetch!) end cap for rectangular tube (pos. 137) rectangular tube (pos. 47) Attach the Sash Lock (pos. 136) with Phillips head screw 3,5 x 22 (pos. 141). door profil - left (pos. 44) glazing block (pos. 143) door profile - bottom (Pos. 48) Phillips head screw 4,2 x 60 (pos. 112) * Note: The rubber seal is bundled in one hank for all doors and windows. Cut accordingly please. 17 door profile - right (pos. 45) door profile - top (pos. 46) Mounting revolving divided door - top View from outside Place the profiles according to the figure on a flat surface (possibly on a cardboard or similar). plastic corner connector (pos. 127) phillips head screw 4,2 x 60 (pos. 112) door profile - top (pos. 48) door profile - left (pos. 41) door profile - right (pos. 42) glazing block (pos. 143) door profile - bottom (pos. 43) Attach the Sash Lock (pos. 136) with Phillips head screw 3,5 x 22 (pos. 141). * Note: The rubber seal ist bundled in one hank for all doors and windows. Cut accordingly please. 18 Assembly instructions for lockable handle 9 1 2 8 3 7 4 5 19 6 20 602 x 1922 980 x 727 980 x 944 980 x 1008 888 x 835 980 x 3893 888 x 943 980 x 2830 602 x 1922 980 x 727 980 x 944 980 x 1008 888 x 835 980 x 3893 888 x 943 980 x 2830 602 x 1922 980 x 727 980 x 944 980 x 1008 888 x 835 980 x 3893 888 x 943 980 x 2830 Good advice for a quick and perfect assembly of the greenhouse from HOKLAR-THERM Most of the assembly can be done by you alone. It is best if you have further two persons being able to hold it for approximately half an hour when putting the greenhouse upright. If you want to go on mounting it alone you have to look for a secure, suitable mounting course by means of stay bars, ladder or other fixings. Unlike the most usual greenhouses, the mounting of the aluminium profiles is done together with the glazing. This results into an absolutely secure glazing and the biggest possible stability of the greenhouse. You obtained 9 to 10 boxes depending on the greenhouse. 1x 1x 1x 1x basic construction basic construction roof window/door accessories gable long parts (with floor profile - gable) seals, automatic window opener, etc. page 4 page 4 page 6 and 7 page 5 - 7 2x bundles curved center profiles page 4 (pos. 2, 3 a. 19) 2x page 20 glazing Please stay all the boxes in a dry place and protected against sunlight (see note below). Please frist open und unpack only the main box with the basic construction to avoid a mixing of the many different parts. Assembly course gable Start with the assembly of the greenhouse gables. Door wall gable and back wall gable are nearly the same. Push the profile of the vertical profile - middle - (pos. 6) left and (pos. 7) right - profile with 8 borings with a slope of 30° up to the smaller borings in the centre of the floor profile. The slopes there have to point to the outside direction. Then detach the plastic corner connector. Attention: Move in both ends of the floor profile 1 each screw. Already now you need the lateral glazing. (Measurement: 980 x 944 mm). Push it with the web direction - vertical - into the floor profile and push laterally into the verticale profiles. Important note: The ISO-celluar sheets, that is the glazing, are always to build in with the UV-coated side to the outside. On the protection foil you find a corresponding note or a blue foil. Loosen the protection foils only at the edge and the complete rest of the foil only after the finish assembly. With some days of isolation the foil can burn „tight“ on the plates and is to stripe off with difficulty. Do not stripe it completely off when unpacking the goods because then you cannot see the side with the UV-protection. Now detach the crossbar (pos. 8) from the top of the glazing. Then the beveled glazing is to put in the same way. Joint the vertical profiles with the t-connector (pos. 103). 21 Attention: In advance 4 screws have to be screwed in both vertical profiles and 4 screws into the crossbar. Push the glazing (Measurement: 980 x 944 mm) into the crossbar (pos. 8) and vertical profile (pos. 6 + 7). Push the verticale-profile - middle - left (pos. 4) and right (pos. 5) from a page in the floor-profile up to the glass side. The slope have to show to the outside. Then attach the corner connector (pos. 100). Attention: In advance 4 screws have to put in both verticale profiles. Vertical profiles and crossbars with the t-connector 3 (pos. 103) and collected screws connect. The crossbars (pos. 8) put on the glazing. Attention: In all crossbars you put in 4 screws and in the verticale profile - left and right (pos. 4 and 5) each one screw. Connect the straight connector plate 1 (pos. 1), the crossbars in the verticale profile - left and right - with previously collected screws. The lower crossbar (already mounted in step 3) attached on the verticale profiles - left and right - with the t-connector 3 (pos. 103) and bolts. In addition, the crossbars are laterally screwed with Phillips head screw 4,2 x 50 (pos. 112) from the inside. Now the large, rounded glass sides merge into the floor profile. The small, rounded glazing have to be thread into the upper crossbar and verticale profile. A 5-angular slice centered to pushing up between the verticale profile direction crossbar. The edge stay bar must to connected on the corner connector. Attention: You have to put in the vertical profiles (pos. 6 and 7) and vertical profiles - middle - left and right (pos. 4 and 5) each 2 screws. The edge stay bar are screwed to the connecting plates 2 (pos. 102) and 4 (pos. 104) on the vertical profiles and the vertical profiles - middle. Note: Hexagon bolts can be inserted later into most profiles through a special „hole“ in the channel. Look page 14!) 22 Assembly of the lateral and roof segments Now you need some more assistance or corresponding aids! Set the gable upright, hold it or support it safely. Attention: You have to put in each one screw in the both sides of the floor profile. At first the lateral floor profile are to detach on the corner connector of the gable. The roof beam is now to introduce into the existing nuts/slots of the gable that the profile is flush in front. Now screw together with the roof beam-end cap by means self-drilling-screws 4,2 x 13 (pos. 111). A lateral glazing is to push into the floor profile and the edge profile. It is best, if at both sides. Thus the gable stad safely. The next to push in a pane of the roof glazing into the grooved profile and into the verge flashing profile. Introduce roof stay bars into the grooved profiles and eaves profile and push up until the glazing (thread-up glazing). The remaining pnes are to complete. Please determine the position of the window in time! Here put in the short pane of the roof glazing and close with the window crossbeam (pos. 25). The connection plates (pos. 115) have to be used to screw. Attention: You have to put in each one screw in the both sides of the floor profile. Push the grooved profile and roof beam into the nuts/slots of the gable profiles. Screw down as well with the grooved with roof beam-end caps. Now a small angle (pos. 105) can be screwed with bolts M6 x 16 with nuts to secure the floor profiles. The stabilizing/edge angles (pos. 20/21/22) are to fix at the edge stay bars and lateral stay bars by means of screws M6 x 16 and plain washers. These have a stabilihing effect and give a protection of the greenhouse against stormy weather. All the same time these angles are the back wall profiles for the tables and shelves (see separate mounting instruction). Now the skeletal structure is finished - topping-out ceremony is the order of the day! Please open now the accessories box. Here you find: 2 pc. roof window by type IV incl. automatic window opener 4 pc. roof window by type V/VI incl. automatic window opener 2 pc. divided revolving door These parts are to mount according to the instructions. The roof window is to push from the lateral into the roof beam. This system is generally very simple and explains itself. 23 Question: Is it necessary to „seal“ the greenhouse or greenhouse glazing respectively? Principally: not. However, we recommend to seal the horizontal transitions from the glazing to the profile (see sketch - broken lines ---) with neutrally linking, transparent silicon in order to have the most possible small amount of water and thus little dirt in the glazing reception. Advantage: In the long term the greenhouse has a better appearance The tendency to the algae formation just in this area decreases tremendously. Humidity/water can also appear within the glazing/celluar sheets according to the weather situation because te PVC-sheets are not „steam-diffusion-tight“, that means that humidity in the form of steam penetrates into the sheet. This is a purely optical disadvantage which cannot be avoided. The sheets cannot suffer any damage, even not with frosty days. Attention: Use ony „neutrally linking“ sllicon due to possible stress cracks in the PVC-glazing. This is most common silicon sealent being available with any DIY superstore or with your HOKLAR-THERM - expert dealer priced at 4 - 6 €/310 mm cartridge. Cleansing and maintenance: Clean the greenhouse with much water only (for ex.: with a car wash-brush or a HP-cleaning apparatus. You can additionally use any purifiers. We wish alle the buyers and users of this HOKLAR-THERM - greenhouse much fun with their hobby of gardening and have much success with growth! All our statements are based upon many years of experience and are drawn up to the best of our knowledge and belief and they do not cover any legal entitlements in case of any possibly arising events of claim. 24 ">
Advertisement
Key features
- Aluminum frame
- Easy to assemble
- Durable construction
- UV-coated glazing
- Multiple sizes available
Frequently asked questions
It is best to have two to three people to help assemble the greenhouse, but it can be done by one person if necessary using appropriate support aids.
The greenhouse can be erected on a stripe foundation or flash curb edge beams, ensuring the foundation is even and horizontal
While not strictly necessary, sealing the horizontal transitions from glazing to profile with transparent silicon is recommended to minimize water and dirt ingress, ensuring a better long-term appearance and reducing the risk of algae formation.