Legrand Raised Floor Rack Brace, floor to floor range of 4 to 10" for server rack, OR-604045755 Instruction Sheet
PDF
Document
Advertisement
Advertisement
Aad dies & ORTRONICS e 125 EUGENE O'NEILL DRIVE NEW LONDON, CT 06320 TEL: 860—445—3800 FAX: 860—405—2990 TITLE RAISED FLOOR BRACKET KIT ASSEMBLY INSTRUCTIONS 4—MATION RACKS VALES \ \ ge / M 7 SEISMIC INSTALLATION REQUIRMENTS SHOULD BE APPROVED BY A LICENSED STRUCTURAL ENGINEER. COMPLIANCE WITH ALL STATE AND LOCAL BUILDING CODES ARE THE RESPONSIBILITY OF THE INSTALLER. | 7 = = N. ° EQUIPMENT RACK— e © © ol ~ „” | o SEE NOTE 9 © | о — o O = == ст == —=Z === == O | 4 || — 3 ] О 5 2 3 6 ET Pre 7 10° A SUB FLOOR ¿ 4a TIT) p | Ш. | | ÍTEM | QUAN DESCRIPTION 1 | 4 | ANCHOR BOLTS 1. PLACE ASSEMBLED EQUIPMENT RACK WHERE IT WILL BE PERMANENTLY LOCATED 2 | 4 | 5/811 THREADED ROD 2. MARK THE RAISED FLOOR THROUGH THE BASE ANGLE MOUNTING HOLES. 3 | 20 | 5/8" SPLIT LOCK WASHERS 3. DRILL 2%," DIA. HOLES THROUGH THE RAISED FLOOR. 4 | 20 | 5/8-11 HEX NUTS 4. MARK THE SUB—FLOOR DIRECTLY BELOW THE CENTER OF THE DRILLED HOLES. 5 | 4 | 5/8" FLAT WASHERS 5. DRILL 2%," DIA. HOLES A MINIMUM OF 2 %e” DEEP IN THE SUB—FLOOR. = Bracke SIDE 10 SDE 6. CLEAN HOLE AND INSTALL ANCHOR USING PROPER SETTING TOOL(HILTI P/N 00032981) OR EQUIVILENT. TOOL NOT SUPPLIED. 7 | 2 | BRACKET, FRONT TO REAR 7. SCREW THREADED RODS INTO THE ANCHORS TO A DEPTH OF APROX. %4”. 8. FOLLOW THE ABOVE VIEWS FOR ASSEMBLY ORDER. 9. SAW OR CUT OFF EXCESS ROD, %” TO %” ABOVE THE TOP NUT, AS SHOWN. INSTRUCTION SHEET NUMBER | REV | ECN SHEET DWN.BY: DATE CHK.BY: DATE APP.BY: DATE OR-71601413 00 1 of 1 D. Bogue 12/15/03 JIM LUCY 12/29/03 MEM 12/29/03 ">
/
Download
Just a friendly reminder. You can view the document right here. But most importantly, our AI has already read it. It can explain complex things in simple terms, answer your questions in any language, and help you quickly navigate even the longest or most compilcated documents.
Advertisement