Legrand Raised Floor Rack Brace, Floor to floor range of 4 to 10" for 16.25" channel depth, OR-604045719 Instruction Sheet
PDF
Belge
Reklam
Reklam
& ORTRONICS @ 125 EUGENE O'NEILL DRIVE NEW LONDON, CT 06320 TEL: 860—445—3800 FAX: 860—405—2990 TITLE RAISED FLOOR BRACKET KIT ASSEMBLY INSTRUCTIONS 16.25” RACKS < се ес ее © RAISED FLOOR SEISMIC INSTALLATION REQUIRMENTS SHOULD BE APPROVED BY A LICENSED STRUCTURAL ENGINEER. COMPLIANCE WITH ALL STATE AND LOCAL BUILDING CODES ARE THE RESPONSIBILITY OF THE INSTALLER. о оо 00 о oO | o © I o 00 SEE NOTE 9 4 3—— 5 3 4 4 3 6 6 3 4 7 4 4 7 3 3 1 [ZZ | 1 hm 4 ri SUB FLOOR à 4 IM a 4 | ИН || 4 J || - TEM | QUAN DESCRIPTION 1 | 4 | ANCHOR BOLTS 1. PLACE ASSEMBLED EQUIPMENT RACK WHERE IT WILL BE PERMANENTLY LOCATED 2| 4 | 5/811 THREADED ROD 2. MARK THE RAISED FLOOR THROUGH THE BASE ANGLE MOUNTING HOLES. 3 | 20 | 5/8" SPLIT LOCK WASHERS 3. DRILL 2%,” DIA. HOLES THROUGH THE RAISED FLOOR. 4 | 20 | 5/8-11 HEX NUTS 4. MARK THE SUB—FLOOR DIRECTLY BELOW THE CENTER OF THE DRILLED HOLES. 5 | 4 | 5/8 FLAT WASHERS 5. DRILL 2%,” DIA. HOLES A MINIMUM OF 2 %s” DEEP IN THE SUB—FLOOR. 6. CLEAN HOLE AND INSTALL ANCHOR USING PROPER SETTING TOOL(HILTI P/N 00032981) 6 | 2 | BRACKET, SIDE TO SIDE OR EQUIVILENT. TOOL NOT SUPPLIED. 7 | 2 | BRACKET, FRONT TO REAR 7. SCREW THREADED RODS INTO THE ANCHORS TO A DEPTH OF APROX. 7”. 8. FOLLOW THE ABOVE VIEWS FOR ASSEMBLY ORDER. 9. SAW OR CUT OFF EXCESS ROD, 3%” TO %” ABOVE THE TOP NUT, AS SHOWN. INSTRUCTION SHEET NUMBER | REV | ECN SHEET DWN.BY: DATE CHK-BY: DATE APP.BY: DATE OR-71601381 00 1 of 1 D. Bogue 04/01/03 ">
/
İndir
Sadece dostça bir hatırlatma. Belgeyi buradan görüntüleyebilirsiniz. Ancak en önemlisi, yapay zekamız zaten okudu. Karmaşık şeyleri basit terimlerle açıklayabilir, sorularınızı herhangi bir dilde yanıtlayabilir ve en uzun veya en karmaşık belgelerde bile hızlıca gezinmenize yardımcı olabilir.
Reklam