Legrand Series II Patch Panel Kit for eight Series II modules, OR-401045283, Series II Patch Panel Kit User manual

Legrand Series II Patch Panel Kit for eight Series II modules, OR-401045283, Series II Patch Panel Kit User manual
 TITLE
MB e 125 EUGENE O'NEILL DRIVE
bam a NEW LONDON, CT 06320
TEL: 860—445—3800
6
FAX: 860—405—2990
BEZEL PATCH PANEL
INSTRUCTION SHEET
STEP #1
1. Pull wires through first bezel. OR
Place module with face down into 8 |
the second bezel and terminate per O
wiring and cabling instructions.
Snap module into first bezel. O
2. Repeat step 1 until all but the last
module is wired.
3. The last step is to pull the wires through STEP #2
the last bezel and place module as O8
shown. Terminate module and snap
into bezel. O О — ||
4. Follow up with proper wire management O > >
for back of panel. n
LAST STEP
= = |= = |
LIN
LPO q E
DCI
1
RIESE
x ALA
oN: LTT
РНК ЧИ
==
SIDE VIEW
5. After terminating cables to modules,
dress cables to shelf of panel.
7. Use slots in panel (for either Hook—Loop
or Tie Wraps) to secure cables to shelf.
8. Cables may be routed from both sides of
relay rack rather than from just one side.
HOOK—LOOP
Г SLOT
| —
9. Minimum cable bend radius is 4 times TOP VIEW
the outside cable diameter.
[
/
7 |
EEE |
и pera OF HOOK-LOOP SLOT
CAD: 716004301
у ]
< HOOK—LOOP or TIE WRAP
INSTRUCTION SHEET # REV. | ECN $ SHEET DWN.BY: DATE CHK.BY:
71600430 02 102142 | 1 of 1 | LEVESQUE | 06/13/02
DATE APP.BY: DATE
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement