Dixon Guard Bar Hinge Set Manual
Mainos
Mainos
MAINTENANCE & OPERATING
INSTRUCTIONS
090119 REV0
For DIXON “BAYCO”
LGH5000
Guard Bar Hinge
For Sales & Service Contact
USA:
Dixon Bayco USA
Chestertown, Maryland
Phone: 410-778-2000
Fax: 410-778-4702
Toll Free: 800-355-1991
E-mail: [email protected]
www.dixonbayco.com
Mexico:
Dixva, S. de R.L. de C.V.
Monterrey, N.L
Phone: 01-800-00-DIXON (34966)
Fax: 01-81-8354-8197
E-mail: [email protected]
www.dixonvalve.com
Asia Pacific:
Dixon (Asia Pacific) Pty Ltd
Wingfield, South Australia
Phone: +61 8 8202 6000
Fax: +61 8 8202 6099
E-mail: [email protected]
www.dixonvalve.com.au
1
Canada:
Dixon Group Canada Limited
Innisfil (Barrie), Ontario
Phone: 705-436-1125
Fax: 705-436-6251
Toll Free: 877-963-4966
E-mail: [email protected]
www.dixongroupcanada.com
Europe:
Dixon Group Europe Ltd
Preston, England
Phone : +44 (0)1772 323529
Fax: +44 (0)1772 314664
E-mail: [email protected]
www.dixoneurope.co.uk
090119 REV0
Item #
10
11
12
13
14
7
8
9
5
5.1
5.2
6
3
4
1
2
15
16
17
18
19
20
21
22
Repair Kits
Part #
LGH5000K1
LGH5000K2
LGH5000K3
LGH5000K4
Part #
341830
341828
341831
341829
400694
112272
391853
112273
112274
112275
391851
112277
112276
112278
110717
391852
112279
242047
112250
112251
112252
111557
111561
110697
LGH5000 Guard Bar Hinge
Description Material left bracket left arm right bracket right arm locking subassembly locking rod button locking spring washer slotted pin shaft washer tension spring hitch pin clip coil pin roller
Nylon locknut elbow shoulder bolt wave washer washer bearing grease fitting o-ring
AL356.1 T6
AL356.1 T6
AL356.1 T6
AL356.1 T6 stainless steel stainless steel stainless steel stainless steel stainless steel stainless steel stainless steel stainless steel stainless steel stainless steel stainless steel stainless steel/Nylon locknut
AL356.1 T6 alloy steel plated carbon steel stainless steel
Delrin 500 plated yellow zinc chromate
Buna-N
Description bearing set roller set left arm set right arm set
Includes item #
20,21, 22
14, 15, 17,18, 19
2, 14, 15, 16, 17, 18, 19,
20, 21, 22
4, 16, 20, 21, 22
Quantity
4
4
4
2
1
1
1
2
1
1
1
1
1
1
1
1
1
4
4
1
1
1
2
4
2 090119 REV0
RIGHT
SUBASSEMBLY
LEFT
SUBASSEMBLY
LGH5000 GUARD BAR HINGE – COMPLETE SET
(The 5000AIHD valve and fasteners must be ordered separately.)
3 090119 Rev 0
LEFT SUBASSEMBLY WITH ELBOW (16), GREASE FITTINGS (21) AND COIL PIN (13)
4 090119 Rev 0
RIGHT SUBASSEMBLY WITH ELBOW (16), GREASE FITTINGS (21) AND COIL PIN (13)
5 090119 Rev 0
These instructions and recommendations are provided to ensure proper operation and long service life of the Dixon “Bayco” guard bar hinge. Parts are identified by the item numbers on the assembly drawings and parts list.
The Dixon “Bayco” guard bar hinge set includes a left subassembly and a right subassembly, which are pre-assembled in the factory. The guard bar hinge also includes two elbows (16) that can be welded onto the guard bars or tubes. The guard bars or tubes are supplied and welded on site by the customer. The guard bar hinge also includes two coil pins (13) and four grease fittings
(21) that will be installed onto the guard bar hinge after the welding work is finished on site.
The Dixon “Bayco” 5000AIHD is a high flow air interlock valve. It is to be used with the Dixon
“Bayco” guard bar hinge to provide a pneumatic control signal when the guard bar is raised. The
5000AIHD valve is to be mounted underneath the left bracket (1). The plunger of the 5000AIHD is horizontal and slightly downward to prevent the water and debris from getting into the valve. The
5000AIHD and mounting fasteners are sold separately.
Please check all parts before installation. Contact Dixon Sales & Service if there are any missing or damaged parts.
Installation:
1. Remove the tension springs (11) from the left assembly and right subassembly. Remove the hitch pin clips (12) from the shafts (9). Remove the shafts (9) with the coil pins (13) from the left bracket (1) and the right bracket (3). Remove the arms (2 and 4) from the brackets (1 and 3). Push and hold the locking button (5.1) to unlock the left arm (2) when removing the left arm (2). Remove the O-rings (22) and the bearings (20) from the arms (2 and 4). For the left arm (2), remove the Nylon locknut (15), the shoulder bolt (17), the roller (14), the wave washer (18) and the flat washer (19). Collect all loose parts for re-installation.
2. Mount the brackets (1 and 3) onto the tanker structure. Weld the guard bars or tubes onto the arms (2 and 4). The customer is responsible for selecting and installing the proper guard bar tube size, and hinge alignment during drilling, welding and installation.
3. For the left arm (2), install the roller (14), the shoulder bolt (17), the wave washer (18), the flat washer (19) and the Nylon locknut (15). Apply grease to the roller (14) and the shoulder bolt (17). Tighten the Nylon locknut (15) by wrenches. Install and tighten the grease fittings
(21) onto both arms (2 and 4) by a wrench. Install the bearings (20) and the O-rings (22) back into the arms (2 and 4). Install the arms (2 and 4) back onto the brackets (1 and 3) through the shafts (9) with the washers (10) and the hitch clip pins (12). Charge the arms (2 and 4) with bearing grease through the 4 grease fittings (21) . A 3/8” OD charging fitting should be used.
4. Install the tensions springs (11) to link the arms (2 and 4) to the brackets (1 and 3). Check the swing action to make sure there are no obstructions. Check and operate the locking subassembly (5) to make sure that it can properly lock and unlock the left arm (2), when the guard bar is up and down.
5. Install the 5000AIHD (purchased separately) horizontally onto the bottom of the left bracket
(1) through the threaded holes on the left brackets (1). The button of the 5000AIHD should face the roller (14) on the left arm (1). Lift the guard bar to check the 5000AIHD button action.
6 090119 Rev 0
6. After testing that all the operations are satisfactory, install the coil pins (13) into the left holes on the shafts (9) using a hammer.
Step 6: Install the coil pins (13)
OPERATION:
To open the guard bar for hose connection, push and hold the button (5.2) to move the locking rod
(5.1) out of the locking hole on the left arm (2) and lift the guard bar. Release the button (5.2). The locking rod (5.2) will retract into the other hole on the left arm (2). The guard bar will be locked in place.
After the hoses are disconnected, hold the guard bar, push and hold the button (5.2) to move the lock rod (5.1) out of the locking hole on the left arm (2). Swing the guard bar back so the arms (2 and 4) rest on the brackets (1 and 3). Release the button (5.2). The locking rod (5.1) will retract into the other hole on the left arm (2). The guard bar will be locked in place.
7 090119 Rev 0
MAINTENANCE:
Examine the threaded connections regularly to make sure all fasteners are tight. Visually check the parts, for signs of wear and tear. Using a grease gun, apply grease on regular basis to the grease fittings (21) on both hinges. If the guard bar does not swing smoothly, remove the coil pins (13) and disassemble the hinges to check the condition of the bearings (20) and o-rings (22). Replace any worn or damaged parts.
DIXON WARRANTY
:
For Warranty Information, please refer to the inside back cover of the latest Dixon
Catalogue.
8 090119 Rev 0
Entretien & mode d’emploi
Pour DIXON “BAYCO”
090119 REV0 (FR)
LGH5000
Charnière Barre de Garde
Pour vente & service contactez
É-U:
Dixon Bayco USA
Chestertown, Maryland
Téléphone: 410-778-2000
Fax: 410-778-4702
Sans frais: 800-355-1991
E-mail: [email protected]
www.dixonbayco.com
Mexique:
Dixva, S. de R.L. de C.V.
Monterrey, N.L
Téléphone: 01-800-00-DIXON (34966)
Fax: 01-81-8354-8197
E-mail: [email protected]
www.dixonvalve.com
Canada:
Dixon Group Canada Limited
Innisfil (Barrie), Ontario
Téléphone: 705-436-1125
Fax: 705-436-6251
Sans frais: 877-963-4966
E-mail: [email protected]
www.dixongroupcanada.com
Europe:
Dixon Group Europe Ltd
Preston, England
Téléphone : +44 (0)1772 323529
Fax: +44 (0)1772 314664
E-mail: [email protected]
www.dixoneurope.co.uk
Asie et Pacifique:
Dixon (Asia Pacific) Pty Ltd
Wingfield, South Australia
Téléphone: +61 8 8202 6000
Fax: +61 8 8202 6099
E-mail: [email protected]
1 www.dixonvalve.com.au
090119 REV0 (FR)
5.1
5.2
6
7
8
9
10
11
12
13
14
Pièce
1
2
3
4
5
15
16
17
18
19
20
21
LGH5000 Charnière Barre de Garde
Description Matériel Partie
341830
341828
341831
341829
400694
112272
391853
112273
Support gauche
Bras gauche
Support droit bras droit
Sous-ensemble de verouillage
Barre de verouillage bouton
Resort de verrouillage
112274
112275 rondelle
Goupille fendue
391851 Arbre
112277 Rondelle
112276 Resort de tension
112278 Goupille de pin d’attelage
110717
391852
Goupille de bobine rouleau
112279
242047
112250
112251
Écrou de blocage en
Nylon coude boulon à épaulement rondelle ondulée
112252
111557 rondelle roulement
AL356.1 T6
AL356.1 T6
AL356.1 T6
AL356.1 T6
111561 Graisseur acier inoxidable acier inoxidable acier inoxidable acier inoxidable acier inoxidable acier inoxidable acier inoxidable acier inoxidable acier inoxidable acier inoxidable acier inoxidable acier inoxidable/ Écrou de blocage en Nylon
AL356.1 T6
Acier allié acier au carbone galvanisé acier inoxidable
Delrin 500 plaqué chromate de zinc jaune
Buna-N 22 110697 Joint torique
Trousse de réparation
Partie #
LGH5000K1
LGH5000K2
Description
Ensemble de roulement
Ensemble de rouleau
LGH5000K3
LGH5000K4
Ensemble du bras gauche
Ensemble du bras droit
Comprend les pieces #
20,21, 22
14, 15, 17,18, 19
2, 14, 15, 16, 17, 18, 19,
20, 21, 22
4, 16, 20, 21, 22
Quantité
1
1
1
1
1
1
2
1
1
1
4
4
4
2
4
1
1
1
1
1
4
1
2
4
2 090119 REV0 (FR)
Sous-ensemble droit
Sous-ensemble gauche
LGH5000 Charnière barre de garde
– Ensemble complet
(La valve et attaches 5000AIHD doivent être commandés séparément.)
3 090119 Rev 0 (FR)
Sous-ensemble gauche avec coude (16), Graisseurs (21) et Goupille de bobine (13)
4 090119 Rev 0 (FR)
Sous-ensemble droit avec coude (16), Graisseurs (21) et Goupille de bobine (13)
5 090119 Rev 0 (FR)
Ces instructions et ces recommandations sont fournies pour assurer un bon fonctionnement et longévité de service Dixon « Bayco » pour charnière barre de garde. Les pièces sont identifiées par numéro d’article sur le diagramme et la liste des pièces.
La charnière barre de garde Dixon « Bayco » comprend un sous-ensemble à gauche et à droit, qui sont préassemblés en usine. La charnière barre de garde comprend également deux coudes (16) qui peuvent être soudés sur les barres de garde ou les tubes. Les barres de garde ou les tubes sont fournis et soudés sur place par le client. La charnière barre de garde comprends aussi deux goupilles de bobine (13) et quatre raccords de graissage (21) qui seront installés sur la charnière barre de garde après les travaux de soudage est terminé sur le site.
Le 5000AIHD de Dixon « Bayco » est une valve de verrouillage à débit élevé. Il doit être utilisé avec la charnière barre de garde Dixon "Bayco" pour fournir un signal de commande pneumatique lorsque la barre de garde est soulevé. La valve 5000AIHD doit être montée audessous du support à gauche (1). Le piston du 5000AIHD est horizontale et légèrement vers le bas pour empêcher l'eau et les débris de pénétrer dans la valve. Les fixations 5000AIHD et montage sont vendus séparément .
S'il vous plaît vérifier toutes les pièces avant le montage. Contactez le service à la clientèle et ventes de Dixon s'il y a des pièces manquantes ou endommagées.
Installation:
1. Retirer le ressort de tension (11) de l'ensemble gauche et sous-ensemble à droite. Retirer les clips de goupilles fendues (12) de l'arbre (9). Enlever les arbres (9) avec les goupilles de bobines (13) du support gauche (1) et le support droit (3). Retirer les bras (2 et 4) des supports (1 et 3). Appuyez et maintenez enfoncé le bouton de verrouillage (5,1) pour dégager le bras gauche (2) en retirant le bras gauche (2). Retirer le joint torique (22) et les roulements (20) des bras (2 et 4). Pour le bras gauche (2), enlever l'écrou de blocage en nylon (15), le boulon à épaulement (17), le rouleau (14), la rondelle ondulée (18) et la rondelle plate (19). Collecter toutes les pièces détachées pour réinstallation.
2. Monter les supports (1 et 3) sur la structure de citerne du pétrolier. Souder les barres de garde ou des tubes sur les bras (2 et 4). Le client est responsable du choix et de l'installation de la bonne taille de barre garde tube, et l'alignement de charnière au cours du forage, de soudage et d'installation.
3. Pour le bras gauche (2), installer le rouleau (14), le boulon à épaulement (17), la rondelle ondulée (18)
, la rondelle plate (19) et l’écrou de blocage en nylon (15). Appliquer de la graisse sur le rouleau (14) et le boulon à épaulement (17). Serrer l’écrou de blocage en nylon (15) par une clé. Installer et serrer les raccords de graissage (21) sur les deux bras (2 et 4) par une clé. Poser les roulements (20) et les joints toriques (22) de retour dans les bras (2 et 4). Installer les bras (2 et 4) sur les supports (1 et 3) à travers les arbres (9) avec les rondelles (10) et les clips pour goupilles fendues (12). Chargez les bras (2 et 4) avec de la graisse à roulement à travers les 4 graisseurs (21). Un raccord de charge 3/8 "OD doit
être utilisé.
4. Installer des ressorts tensions (11) pour relier les bras (2 et 4) sur les supports (1 et 3).
Vérifiez l'action de balancement pour s'assurer qu'il n'y aucune obstruction. Vérifier et fonctionner le sous-ensemble de verrouillage (5) pour s'assurer qu'il peut correctement verrouiller et déverrouiller le bras gauche (2), lorsque la barre de garde est haute et basse.
6 090119 Rev 0 (FR)
5. Installez le 5000AIHD (vendu séparément) horizontalement sur le bas du support gauche
(1) à travers les trous filetés sur les supports gauche (1). Le bouton du 5000AIHD doit faire face au rouleau (14) sur le bras gauche (1). Soulevez la barre de garde pour vérifier l'action du bouton 5000AIHD.
6. Après avoir testé que toutes les opérations sont satisfaisantes, installer les goupilles de bobine (13) dans les trous à gauche sur les arbres (9) à l'aide d'un marteau.
Étape 6: Installez les goupilles de bobine (13)
OPÉRATION:
Pour ouvrir la barre de garde pour raccord de tuyau, appuyez et tenir le bouton (5,2) pour déplacer la tige de verrouillage (5,1) hors du trou de verrouillage sur le bras gauche (2) et soulevez la barre de garde. Relâchez le bouton (5,2). La tige de verrouillage (5,2) se rétractera dans l'autre trou du bras gauche (2). La barre de garde se verrouillera en place.
Après que les tuyaux sont débranchés, tenez la barre de garde, appuyez et maintenez le bouton
(5,2) pour déplacer la tige de verrouillage (5,1) hors du trou de verrouillage sur le bras gauche (2).
Pivoter la barre de garde en arrière de sorte que les bras (2 et 4) se reposent sur les supports (1 et
3). Relâchez le bouton (5,2). La tige de verrouillage (5,1) se rétractera dans l'autre trou du bras gauche (2). La barre de garde se verrouillera en place.
7 090119 Rev 0 (FR)
ANGLE D’OPÉRATION
ENTRETIEN:
Examinez les raccords filetés régulièrement pour s'assurer que toutes les attaches sont bien serrées. Vérifier visuellement les pièces, pour des signes d'usure. En utilisant un pistolet à graisse, appliquez de la graisse régulièrement aux graisseurs (21) sur les deux charnières. Si la barre de garde se balance pas doucement, retirer les goupilles de bobines (13) et désassembler les charnières pour vérifier l'état des roulements (20) et les joints toriques (22). Remplacer les pièces usées ou endommagées.
GARANTIE DIXON:
Pour plus d’informations complètes sur la garantie, s’il vous plait se référer à la couverture intérieure de la dernière page du dernier catalogue Dixon.
8 090119 Rev 0 (FR)
Lataa
Mainos