Percussion Play Babel Drum Installation Instructions Manual

Add to My manuals
3 Pages

advertisement

Percussion Play Babel Drum Installation Instructions Manual | Manualzz

Ground Fixed

Babel Drum

Page 1 of 3

Instrument

Components:

Babel Drums are pre- assembled

Metric Conversion:

200mm/ 8”

400mm/ 16”

570mm/ 22”

600mm/ 24”

700mm/ 28”

770mm/ 30”

870mm/ 34”

1070mm/ 42”

1.5m/ 59”

BS EN 1176

Installation Instructions

x2

1 . Using M10 nuts and

150mm bolts supplied locate through pre drilled holes and secure bolts in place to support in ground pole in concrete . 3 bolts per leg at

120 degree angles. ( See

Assembly Guide)

2 .

Excavate a hole for the drum 200mm diameter by

KS2-400/KS1-570mm deep in desired location upon decision from customer.

KS1 – 700mm

KS2 – 870mm

Adult- 1070mm

3 . Locate (lower) legs into hole making sure they are vertical and level prior to concreting in place .

Drum should be

700,870 from ground surface to top of drum ( depending on

Key Stage).

1.5m

Adult

1.5m

KS2

Install Instrument with 1.5m free space

(from widest point) around it.

CAUTION: Drum surface can get hot in direct sunlight, if possible install in shaded areas. x2 x2 x3

Weight of heaviest part 17.5kg

(Large Babel Drum)

Weight of heaviest part 13.4kg

(Small Babel Drum)

4 . Once happy with location of the Drum, fill hole using rapid hardening concrete . Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

Ground Surface

Large 8 note Adult 400mm

KS2 600mm

KS1 770mm

Played with hands

Ground Fix

Components: x3

M10x200 Threaded bar x6

M10 BZP Nut

KS2 400mm

KS2 570mm

Small 6 note

Spares available form percussionplay.com or from your local distributor

22 Kg

13.4 Kg

Assembly Guide PPBDL-S

Ground Fixed

Babel Drum

Page 2 of 3

PPBDS PLAN

PPBDS PLAN

Instrument

Components:

Babel Drums are preassembled

CAUTION: Drum surface can get hot in direct sunlight, if possible install in shaded areas.

COMPONENTS LIST:

M10 Nut X6

M10x200 Threaded Bar X3

PPBDS FRONT

COMPONENTS LIST:

M10 Nut X6

M10x200 Threaded Bar X3

PPBDS FRONT

BS EN 1176

Played with hands

Ground Fix

Components: x3

M10x200 Threaded bar x6

M10 BZP Nut

PPBDL PLAN

COMPONENTS LIST:

M10 Nut X6

M10x200 Threaded Bar X3

PPBDL PLAN

PPBDL FRONT

PPBDL FRONT

Spares available form percussionplay.com or from your local distributor

22 Kg

13.4 Kg

COMPONENTS LIST:

M10 Nut X6

M10x200 Threaded Bar X3

Ground Fixed

Babel Drum

Page 3 of 3

Ground Fix Installation

1

Insert M10x 150 Threaded bar into pre drilled holes in Frame of Babel Drum using M10 BZP Nuts 2

Excavate a holes with a

250mm diameter tapering down to 350mm diameter and 450mm depth

3

Compact base of hole with

50mm of aggregate.

Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)

(1.1)

Components: x3

M10x200 Threaded Bar x6

M10 BZP Nut

Metric Conversion:

50mm/ 2”

250mm/ 10”

350mm/ 14”

400mm/ 16”

450mm/ 18”

250

If Drum needs to be positioned lower a deeper hole can be excavated.

350

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176.

BS EN 1176

4

Fill hole with fast drying concrete to manufacturers specifications.