Percussion Play Duo Installation Instructions
Add to My manuals3 Pages
Percussion Play Duo is a ground fixed musical instrument designed for outdoor use. It is easy to install and can be played by people of all ages and abilities. The Duo features two beaters that can be struck with hands, sticks, or mallets to create a variety of sounds. The instrument is made from durable materials and is weather resistant, making it ideal for use in parks, playgrounds, and other outdoor settings. The Duo can be used for a variety of musical activities, including rhythm games, improvisation, and composition. It is also a great way to get exercise and have fun.
advertisement
Instrument
Components: x8
M8 Nyloc Nut x4
M6x20 Security Screw x8
2 Part Cover
Cap x2
M6 Saddle Strap
Metric
Conversion:
250mm/ 10”
400mm/ 15 3/4”
550mm/ 21
21/32”
700mm/ 27 9/16”
850mm/ 33
15/32”
1.5m/ 59”
Ground Fixed
Duo
Page 1 of 3
Installation Instructions
(1.3)
(1.1)
(1.2)
1. Attach the steel legs to the base of the instrument with the M8 Nyloc Nuts and 2 part security caps. (1.1) (See
Assembly Guide)
2. Attach Ground Fixing posts to legs(1.2) (See Ground Fix
Post Installation Sheet)
3.Excavate 2 holes for the
Steel legs 250mm diameter by 400-550mm deep depending on Key stage, in desired location upon decision from customer.
4. Locate (lower) legs into holes making sure they are vertical and level prior to concreting in place.
5. Once happy with location of the Instrument, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.
1.5m
KS1,2
KS1 – 700mm
KS2 – 850mm
Ground Surface
1.5m
Install Instrument with 1.5m free space
(from widest point) around it.
Weight of heaviest part 14kg (Duo)
Pair Small Red
Beaters X2
Ground Fix
Components:
6. Attach the 1 pair of beater to the saddle strap on the leg.
(1.3)
KS2 - 400mm
KS1 - 550mm x4
M10x200 Bolt M10 Nut x8
Spares available from percussionplay.com or from your local distributor
28 Kg
BS EN 1176
Assembly Guide PPDUO
Ground Fixed
Duo
Page 2 of 3
Instrument
Components: x8
M8 Nyloc Nut x4
M6x20 Security Screw x8
2 Part Cover
Cap x2
M6 Saddle Strap
Thread Lock Solution
Required (Not Supplied)
BS EN 1176
(1.1)
Thread Lock Solution
Required (Not Supplied)
Tools: x1
TX 30 Driver Bit x1
TX 40 Driver Bit
COMPONENTS LIST:
2 Part Cover Cap X8
M8 Nyloc nut X8
M10 Nut X8
M10x200 Threaded Bar X4
Saddle Strap X2
M6x20 Pin torx X4
PPDUO FRONT
Pair Small Red
Beaters X2
Ground Fix
Components: x4
M10x200 Bolt M10 Nut x8
PPDUO SIDE
Spares available from percussionplay.com or from your local distributor
28 Kg
Ground Fixed
Duo
Page 3 of 3
Ground Fix Post Installation
1
Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN
1176.
2
Components: x4
M10x200 Bolt
M10 Nut x8
Metric
Conversion:
50mm/ 2”
250mm/ 10”
350mm/ 14”
400mm/ 16”
450mm/ 18”
(1.1)
Insert M10x 150 Threaded bar into pre drilled holes in Ground Fixing Post
Fix M10x 200 Threaded bar in place using M10 Nuts
3
4
5
250
Concrete
Excavate 6 holes with a
250mm diameter tapering down to 350mm diameter and 450mm depth
400mm min depth
Compact base of hole with
50mm of aggregate.
Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)
Fix hole with fast drying concrete to manufacturers specifications.
Aggregate
350
Duplicate points 1-5. Duo requires 2
Ground Fix Posts
BS EN 1176
advertisement