Percussion Play Duo Installation Instructions

Add to My manuals
3 Pages

advertisement

Percussion Play Duo Installation Instructions | Manualzz

Instrument

Components: x8

M8 Nyloc Nut x4

M6x20 Security Screw x8

2 Part Cover

Cap x2

M6 Saddle Strap

Metric

Conversion:

250mm/ 10”

400mm/ 15 3/4”

550mm/ 21

21/32”

700mm/ 27 9/16”

850mm/ 33

15/32”

1.5m/ 59”

Ground Fixed

Duo

Page 1 of 3

Installation Instructions

(1.3)

(1.1)

(1.2)

1. Attach the steel legs to the base of the instrument with the M8 Nyloc Nuts and 2 part security caps. (1.1) (See

Assembly Guide)

2. Attach Ground Fixing posts to legs(1.2) (See Ground Fix

Post Installation Sheet)

3.Excavate 2 holes for the

Steel legs 250mm diameter by 400-550mm deep depending on Key stage, in desired location upon decision from customer.

4. Locate (lower) legs into holes making sure they are vertical and level prior to concreting in place.

5. Once happy with location of the Instrument, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

1.5m

KS1,2

KS1 – 700mm

KS2 – 850mm

Ground Surface

1.5m

Install Instrument with 1.5m free space

(from widest point) around it.

Weight of heaviest part 14kg (Duo)

Pair Small Red

Beaters X2

Ground Fix

Components:

6. Attach the 1 pair of beater to the saddle strap on the leg.

(1.3)

KS2 - 400mm

KS1 - 550mm x4

M10x200 Bolt M10 Nut x8

Spares available from percussionplay.com or from your local distributor

28 Kg

BS EN 1176

Assembly Guide PPDUO

Ground Fixed

Duo

Page 2 of 3

Instrument

Components: x8

M8 Nyloc Nut x4

M6x20 Security Screw x8

2 Part Cover

Cap x2

M6 Saddle Strap

Thread Lock Solution

Required (Not Supplied)

BS EN 1176

(1.1)

Thread Lock Solution

Required (Not Supplied)

Tools: x1

TX 30 Driver Bit x1

TX 40 Driver Bit

COMPONENTS LIST:

2 Part Cover Cap X8

M8 Nyloc nut X8

M10 Nut X8

M10x200 Threaded Bar X4

Saddle Strap X2

M6x20 Pin torx X4

PPDUO FRONT

Pair Small Red

Beaters X2

Ground Fix

Components: x4

M10x200 Bolt M10 Nut x8

PPDUO SIDE

Spares available from percussionplay.com or from your local distributor

28 Kg

Ground Fixed

Duo

Page 3 of 3

Ground Fix Post Installation

1

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN

1176.

2

Components: x4

M10x200 Bolt

M10 Nut x8

Metric

Conversion:

50mm/ 2”

250mm/ 10”

350mm/ 14”

400mm/ 16”

450mm/ 18”

(1.1)

Insert M10x 150 Threaded bar into pre drilled holes in Ground Fixing Post

Fix M10x 200 Threaded bar in place using M10 Nuts

3

4

5

250

Concrete

Excavate 6 holes with a

250mm diameter tapering down to 350mm diameter and 450mm depth

400mm min depth

Compact base of hole with

50mm of aggregate.

Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)

Fix hole with fast drying concrete to manufacturers specifications.

Aggregate

350

Duplicate points 1-5. Duo requires 2

Ground Fix Posts

BS EN 1176

advertisement

Related manuals

Download PDF

advertisement