Percussion Play Hexad Ensemble Installation Instructions

Add to My manuals
13 Pages

advertisement

Percussion Play Hexad Ensemble Installation Instructions | Manualzz

Ground Fixed

Babel Drum

Page 1 of 3

Instrument

Components: x3

M8x25mm Pin Torx

Metric Conversion:

200mm/ 8”

400mm/ 16”

530mm/ 20

55/64 ”

680mm/ 26

49/64 ”

700mm/ 27 9/16”

850mm/ 33

15/32

980mm/ 38 37/64”

1.5m/ 59”

BS EN 1176

Installation Instructions

1. Unpack ground fixing legs

3no.

2. Lay packaging out on floor or assemble on non-abrasive surface to prevent marking of polished stainless steel.

3. Align holes on legs

(opposite end to polished domes) and secure in place using 3no. M10 x 200mm threaded bar and 6no. M10 nuts provided

Tools required 2no. 17mm metric spanner/wrench ( 11 inch or alternatively using adjustable wrench)

/

16

8. Align holes in side of babel drum with bolts on legs.

9. Using 8mm Hex Key screw bolts into drum to secure in place.

Use thread locking solution

All hole locations are laser cut for accuracy to ensure holes in drum align perfectly with legs.

10. Using TX40 driver provided secure M8 x 25mm security bolts into external holes in legs 3no. Use thread lock solution

4. Invert assembled frame so domed ends face upwards.

x2 x2 x2 x3

Weight of heaviest part 17.5kg

(Large Babel Drum)

Weight of heaviest part 13.4kg

(Small Babel Drum)

5. Place 8mm Hex Key supplied into hole in leg and lock into internal bolt.

6. Remove Black caps opposite side of leg and keeping Hex Key in place, slide black polyurethane damper over bolt until flush with end of bolt. Repeat for other 2 legs

7. Unpack babel drum leaving black film in place to protect.

Heights:

KS1 – (L)700-(S)705mm

KS2 – (L)850-(S)855mm

Adult- (L)980-(S)985mm

Ground Surface

Adult 400mm

KS2 530mm

KS1 680mm

Large 8 note

Played with hands

Ground Fix

Components: x3

M10x200 Threaded bar x6

M10 BZP Nut

1.5m

1.5m

Install

Instrument with 1.5m free space (from widest point) around it.

CAUTION: Drum surface can get hot in direct sunlight, if possible install in shaded areas.

Adult 400mm

KS2 530mm

KS1 680mm

Small 6 note

Spares available from percussionplay.com or from your local distributor

22 Kg

13.4 Kg

Ground Fixed

Babel Drum

Page 2 of 3

Assembly Guide PPBDL-S

Thread Lock Solution

Required

Instrument

Components: x3

M8x25mm Pin Torx

1 2

Thread Lock Solution

Required

BS EN 1176

Played with hands

Ground Fix

Components: x3

M10x200 Threaded bar x6

M10 BZP Nut

3

Tools:

Hex T Key x1 x1

TX 40 Driver Bit

Spares available from percussionplay.com or from your local distributor

22 Kg

13.4 Kg

Ground Fixed

Babel Drum

Page 3 of 3

Ground Fix Installation

1 Insert M10x 200 Threaded bar into pre drilled holes in Frame of Babel Drum using M10 BZP Nuts

2 Excavate a holes with a

250mm diameter tapering down to 350mm diameter and 450mm depth

3 Compact base of hole with

50mm of aggregate.

Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)

(1.1)

Components: x3

M10x200 Threaded Bar x6

M10 BZP Nut

Metric Conversion:

50mm/ 2”

250mm/ 10”

350mm/ 14”

400mm/ 16”

450mm/ 18”

250

If Drum needs to be positioned lower a deeper hole can be excavated.

350

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176.

BS EN 1176

4 Fill hole with fast drying concrete to manufacturers specifications.

Ground Fixed

Handpipes

Page 1 of 3

Instrument

Components:

Instrument assembled

Metric

Conversion:

250mm/ 10”

400mm/ 16”

905mm/ 35”

1.5m/ 59”

Installation Instructions

(1.1)

1. Handpipes will arrive on site assembled, Ground

Fixings will need to be installed (1.1) (See Assembly

Guide)

2. Attach Ground Fixing posts to legs (See Ground Fix Post

Installation Sheet)

3.Excavate 2 holes for the

Steel legs 250mm diameter by 400mm deep in desired location upon decision from customer.

4. Locate (lower) legs into holes making sure they are vertical and level prior to concreting in place.

5. Once happy with location of the Instrument, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

1.5m

905m m

Ground Surface

Weight of heaviest part 20kg (Handpipes)

Played with hands

400mm

Ground Fix

Components: x4

M10x200 Bolt M10 Nut x8 x2

M10x60 Security Screw x2

M10 Barrel Nut

Spares available from percussionplay.com or from your local distributor

25 Kg

BS EN 1176

1.5m

Install Instrument with 1.5m free space

(from widest point) around it.

Ground Fixed

Handpipes

Page 2 of 3

Instrument

Components:

Instrument assembled

Assembly Guide PPHAND

498

(1.1)

COMPONENTS LIST:

M10 Nut X8

M10x200 Threaded Bar X4

M10x60mm Security Screw X2

M10 Barrel Nut X2

Thread Lock Solution

Required (Not Supplied)

BS EN 1176

Played with hands

Ground Fix

Components: x4

M10x200 Bolt M10 Nut x8 x2

M10x60 Security Screw x2

M10 Barrel Nut

Spares available from percussionplay.com or from your local distributor

COMPONENTS LIST:

25 Kg

M10x60mm Security Screw X2

M10 Barrel Nut X2

Ground Fixed

Handpipes

Page 3 of 3

Ground Fix Post Installation

1

Insert M10x 200 Threaded bar into pre drilled holes in Ground Fixing Post

Tools: x2

TX 45 Driver Bit

2 3 4 Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of

BS EN 1176.

Fix M10x 200 Threaded bar in place using M10

Nuts

Locate the Ground fix Post into the leg of the instrument.

Fix instrument to Ground fix post using M10 bolt and Barrel Nut and use thread locking solution to prevent fixings working loose.

Components: x4

M10x200 Bolt x8

M10 Nut x2

M10 Barrel Nut x2

M10x60 Security Screw

Metric

Conversion:

50mm/ 2”

250mm/ 10”

350mm/ 14”

400mm/ 16”

450mm/ 18”

5 6 7

250

Concrete

Excavate 6 holes with a

250mm diameter tapering down to 350mm diameter and 450mm depth

400mm min depth

Compact base of hole with

50mm of aggregate.

Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)

Fill hole with fast drying concrete to manufacturers specifications.

Aggregate

Repeat points 1-7. Handpipes requires 2

Ground Fix Posts

350

BS EN 1176

Ground Fixed

Tubular Bells

Page 1 of 2

Instrument

Components:

Tubular Bells are preassembled

Metric Conversion:

250mm/ 10”

400mm/ 16”

600mm/ 24”

1.5m/ 59”

2207mm/ 98”

BS EN 1176

Installation Instructions

1. Using M10 nuts and

150mm bolts supplied locate through pre drilled holes and secure bolts in place to support in ground pole in concrete. 2 bolts per leg at 90 degree angles

1.5m

In ground fixing always 600mm for each chime and

400mm for beater poles

1.5m

Install Instrument with 1.5m free space

(from widest point) around it.

2207

1.5m

2.Excavate 7 holes for

Tubular Bells 250mm diameter by 600mm deep. 2 further holes will be needed for the beater poles according to layout of Bells at

250mm diameter and

400mm deep.

3. Locate (lower) legs into holes making sure they are vertical and level prior to concreting in place

4. Once happy with location of the Tubular Bells, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines

Ground

Surface

600mm

Weight of heaviest part 10kg (XXL Bell)

Pair Large Red

Beaters X1

Ground Fix

Components: x14

M10x150 Bolt M10 Nut x28

Spares available from percussionplay.com or from your local distributor

59 Kg

Ground Fixed

Tubular Bells

Page 2 of 2

Ground Fix Post Installation

1 2

Components: x14

M10x200 Threaded Bar x28

M10 BZP Nut

Metric Conversion:

50mm/ 2”

250mm/ 10”

350mm/ 14”

400mm/ 16”

450mm/ 18”

600mm/ 24”

650mm/ 26”

3

Insert M10x 150 Threaded bar into pre drilled holes in Ground Fixing Post

(1.1)

Fix M10x 150 Threaded bar in place using M10

Nuts

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176.

Excavate 7 holes with a

250mm diameter tapering down to 350mm diameter and 650mm depth

5 6

250

Compact base of hole with

50mm of aggregate.

Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)

Fix hole with fast drying concrete to manufacturers specifications.

600mm max depth 7x Tubular Bells

400mm max depth 2X Beater Poles

Concrete

Aggregate

350

BS EN 1176

Ground Fixed

Flat Pack Harmony

Page 1 of 3

Instrument

Components:

M10 Nut x6

M6x20 Security Screw x3

M6 Saddle Strap

Metric Conversion:

250mm/ 10”

400mm/ 16”

1385mm/ 55”

1.5m/ 59”

BS EN 1176

Installation Instructions

1. Unpack frame 3no.

2. Lay packaging out on floor or assemble on non-abrasive surface to prevent marking of polished stainless steel.

3. Align holes on legs

(opposite end to polished domes) and secure in place using 3no. M10 x 200mm threaded bar and 6no. M10 nuts provided

Tools required 2no. 17mm metric spanner/wrench ( 11 inch or alternatively using adjustable wrench)

/

16

8. Locate (lower) legs into hole making sure they are vertical and level prior to concreting in place.

5. Once happy with location of the Instrument, fill hole using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

1.5m

1385mm

4. Invert assembled frame so domed ends face upwards.

x2

5. Insert M8x60mm Security screws into pre drilled holes in frame using TX40 bit.

x2 x2

Weight of heaviest part 16kg (Harmony Frame) x3

6. Attach Notes to Harmony

Frame. (See Assembly Guide

Sheet)

3.Excavate 1 hole for the

Steel leg 250mm diameter by minimum 400mm deep, in desired location upon decision from customer.

400mm

Pair Small Red

Beaters X1

Ground Fix

Components: x3

M10x200 Bolt M10 Nut x6 x2

M8x60 Security Screw

1.5m

Install Instrument with 1.5m free space

(from widest point) around it.

CAUTION:

Harmony surface can get hot in direct sunlight, if possible install in shaded areas.

Ground Surface

Can be installed deeper if required

Spares available from percussionplay.com or from your local distributor

20 Kg

Ground Fixed

Harmony Flat Pack

Page 2 of 3

Assembly Guide PPHARM

Thread Lock Solution

Required

Tools: x1

TX 30 Driver Bit x1

TX 40 Driver Bit

Instrument

Components: x6

M6x20 Security Screw x3

M6 Saddle Strap

Thread Lock Solution

Required

BS EN 1176

Thread Lock Solution

Required

Pair Small Red

Beaters X1

Ground Fix

Components: x3

M10x200 Bolt M10 Nut x6 x2

M8x60 Security Screw

COMPONENTS LIST:

M10 Nut X6

M10x200 Threaded Bar X3

Saddle Strap X3

M6x20 Pin torx X6

M8x60 Pin torx X2

CAUTION:

Harmony surface can get hot in direct sunlight, if possible install in shaded areas.

Spares available from percussionplay.com or from your local distributor

20 Kg

Ground Fixed

Harmony Flat Pack

Page 3 of 3

Ground Fix Post Installation

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN

1176.

Tools: x1

TX 40 Driver Bit

Metric Conversion:

50mm/ 2”

250mm/ 10”

350mm/ 14”

400mm/ 16”

450mm/ 18”

(1.1)

Components: x3

M10x200 Threaded Bar x6

M10 BZP Nut x2

M8x60 Security Screw

Thread Lock Solution

Required

250

1

If Harmony needs to be positioned lower a deeper hole can be excavated.

400mm min depth

350

Excavate a holes with a

250mm diameter tapering down to 350mm diameter and 450mm depth

2

BS EN 1176

3

Compact base of hole with

50mm of aggregate. Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)

Fill hole with fast drying concrete to manufacturers specifications.

Installation Instructions

1. Attach Ground Fixing posts to legs(1.2) (See Ground Fix

Post Installation Sheet)

1.5m

1.5m

Install Instrument with 1m free space

(from widest point) around it.

Ground Fixed

Bell Lyre

Page 1 of 2 2.Excavate1 hole for the

Steel leg 250mm diameter by

600mm deep, in desired location upon decision from customer.

1840mm

3. Locate (lower) legs into hole making sure they are vertical and level prior to concreting in place.

Instrument

Components: x4

M6x20 Security Screw x2

M6 Saddle Strap

Metric Conversion:

250mm/ 10”

600mm/ 24”

1.5m/ 59”

1525mm/ 60”

BS EN 1176

Weight of heaviest part 14.4kg

(Bell Lyre)

Pair Small Red

Beaters X1

Ground Fix

Components:

4. Once happy with location of the Instrument, fill hole using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

600mm

Ground Surface

CAUTION: Bell

Lyre surface can get hot in direct sunlight, if possible install in shaded areas.

x2

M10x200 Bolt M10 Nut x4 x1

M10x70 Security Screw x1

M10 Barrel Nut

Spares available from percussionplay.com or from your local distributor

23.5 Kg

Ground Fixed

Bell Lyre

Page 2 of 2

Components: x2

M10x200 Threaded Bar x4

M10 BZP Nut x1

M10 Barrel Nut x1

M10x70 Security Screw

Thread Lock Solution

Required (Not Supplied)

Ground Fix Post Installation

1 2 3 4

Thread Lock Solution

Required (Not Supplied)

Tools: x2

TX 45 Driver Bit

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part

7 of BS EN 1176.

5

Insert M10x 200 Threaded bar into pre drilled holes in Ground Fixing Post

Fix M10x 200 Threaded Locate the Ground fix Post into the leg of the instrument.

Fix instrument to Ground fix post using M10 bolt and Barrel Nut and use thread locking solution to prevent fixings working loose.

6 7

250

Metric Conversion:

50mm/ 2”

100mm/ 4”

250mm/ 10”

350mm/ 14”

600mm/ 24”

650mm/ 26”

Excavate 1 hole with a

250mm diameter tapering down to 350mm diameter and 650mm depth

600mm min depth

Can be buried deeper if required

Compact base of hole with

50mm of aggregate.

Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)

Fix hole with fast drying concrete to manufacturers specifications.

Concrete

Aggregate

350

BS EN 1176

advertisement

Related manuals

Download PDF

advertisement