advertisement
Ground Fixed
Babel Drum
Page 1 of 3
Instrument
Components: x3
M8x25mm Pin Torx
Metric Conversion:
200mm/ 8”
400mm/ 16”
530mm/ 20
55/64 ”
680mm/ 26
49/64 ”
700mm/ 27 9/16”
850mm/ 33
15/32
”
980mm/ 38 37/64”
1.5m/ 59”
BS EN 1176
Installation Instructions
1. Unpack ground fixing legs
3no.
2. Lay packaging out on floor or assemble on non-abrasive surface to prevent marking of polished stainless steel.
3. Align holes on legs
(opposite end to polished domes) and secure in place using 3no. M10 x 200mm threaded bar and 6no. M10 nuts provided
Tools required 2no. 17mm metric spanner/wrench ( 11 inch or alternatively using adjustable wrench)
/
16
8. Align holes in side of babel drum with bolts on legs.
9. Using 8mm Hex Key screw bolts into drum to secure in place.
Use thread locking solution
All hole locations are laser cut for accuracy to ensure holes in drum align perfectly with legs.
10. Using TX40 driver provided secure M8 x 25mm security bolts into external holes in legs 3no. Use thread lock solution
4. Invert assembled frame so domed ends face upwards.
x2 x2 x2 x3
Weight of heaviest part 17.5kg
(Large Babel Drum)
Weight of heaviest part 13.4kg
(Small Babel Drum)
5. Place 8mm Hex Key supplied into hole in leg and lock into internal bolt.
6. Remove Black caps opposite side of leg and keeping Hex Key in place, slide black polyurethane damper over bolt until flush with end of bolt. Repeat for other 2 legs
7. Unpack babel drum leaving black film in place to protect.
Heights:
KS1 – (L)700-(S)705mm
KS2 – (L)850-(S)855mm
Adult- (L)980-(S)985mm
Ground Surface
Adult 400mm
KS2 530mm
KS1 680mm
Large 8 note
Played with hands
Ground Fix
Components: x3
M10x200 Threaded bar x6
M10 BZP Nut
1.5m
1.5m
Install
Instrument with 1.5m free space (from widest point) around it.
CAUTION: Drum surface can get hot in direct sunlight, if possible install in shaded areas.
Adult 400mm
KS2 530mm
KS1 680mm
Small 6 note
Spares available from percussionplay.com or from your local distributor
22 Kg
13.4 Kg
Ground Fixed
Babel Drum
Page 2 of 3
Assembly Guide PPBDL-S
Thread Lock Solution
Required
Instrument
Components: x3
M8x25mm Pin Torx
1 2
Thread Lock Solution
Required
BS EN 1176
Played with hands
Ground Fix
Components: x3
M10x200 Threaded bar x6
M10 BZP Nut
3
Tools:
Hex T Key x1 x1
TX 40 Driver Bit
Spares available from percussionplay.com or from your local distributor
22 Kg
13.4 Kg
Ground Fixed
Babel Drum
Page 3 of 3
Ground Fix Installation
1 Insert M10x 200 Threaded bar into pre drilled holes in Frame of Babel Drum using M10 BZP Nuts
2 Excavate a holes with a
250mm diameter tapering down to 350mm diameter and 450mm depth
3 Compact base of hole with
50mm of aggregate.
Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)
(1.1)
Components: x3
M10x200 Threaded Bar x6
M10 BZP Nut
Metric Conversion:
50mm/ 2”
250mm/ 10”
350mm/ 14”
400mm/ 16”
450mm/ 18”
250
If Drum needs to be positioned lower a deeper hole can be excavated.
350
Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176.
BS EN 1176
4 Fill hole with fast drying concrete to manufacturers specifications.
Ground Fixed
Handpipes
Page 1 of 3
Instrument
Components:
Instrument assembled
Metric
Conversion:
250mm/ 10”
400mm/ 16”
905mm/ 35”
1.5m/ 59”
Installation Instructions
(1.1)
1. Handpipes will arrive on site assembled, Ground
Fixings will need to be installed (1.1) (See Assembly
Guide)
2. Attach Ground Fixing posts to legs (See Ground Fix Post
Installation Sheet)
3.Excavate 2 holes for the
Steel legs 250mm diameter by 400mm deep in desired location upon decision from customer.
4. Locate (lower) legs into holes making sure they are vertical and level prior to concreting in place.
5. Once happy with location of the Instrument, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.
1.5m
905m m
Ground Surface
Weight of heaviest part 20kg (Handpipes)
Played with hands
400mm
Ground Fix
Components: x4
M10x200 Bolt M10 Nut x8 x2
M10x60 Security Screw x2
M10 Barrel Nut
Spares available from percussionplay.com or from your local distributor
25 Kg
BS EN 1176
1.5m
Install Instrument with 1.5m free space
(from widest point) around it.
Ground Fixed
Handpipes
Page 2 of 3
Instrument
Components:
Instrument assembled
Assembly Guide PPHAND
498
(1.1)
COMPONENTS LIST:
M10 Nut X8
M10x200 Threaded Bar X4
M10x60mm Security Screw X2
M10 Barrel Nut X2
Thread Lock Solution
Required (Not Supplied)
BS EN 1176
Played with hands
Ground Fix
Components: x4
M10x200 Bolt M10 Nut x8 x2
M10x60 Security Screw x2
M10 Barrel Nut
Spares available from percussionplay.com or from your local distributor
COMPONENTS LIST:
25 Kg
M10x60mm Security Screw X2
M10 Barrel Nut X2
Ground Fixed
Handpipes
Page 3 of 3
Ground Fix Post Installation
1
Insert M10x 200 Threaded bar into pre drilled holes in Ground Fixing Post
Tools: x2
TX 45 Driver Bit
2 3 4 Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of
BS EN 1176.
Fix M10x 200 Threaded bar in place using M10
Nuts
Locate the Ground fix Post into the leg of the instrument.
Fix instrument to Ground fix post using M10 bolt and Barrel Nut and use thread locking solution to prevent fixings working loose.
Components: x4
M10x200 Bolt x8
M10 Nut x2
M10 Barrel Nut x2
M10x60 Security Screw
Metric
Conversion:
50mm/ 2”
250mm/ 10”
350mm/ 14”
400mm/ 16”
450mm/ 18”
5 6 7
250
Concrete
Excavate 6 holes with a
250mm diameter tapering down to 350mm diameter and 450mm depth
400mm min depth
Compact base of hole with
50mm of aggregate.
Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)
Fill hole with fast drying concrete to manufacturers specifications.
Aggregate
Repeat points 1-7. Handpipes requires 2
Ground Fix Posts
350
BS EN 1176
Ground Fixed
Tubular Bells
Page 1 of 2
Instrument
Components:
Tubular Bells are preassembled
Metric Conversion:
250mm/ 10”
400mm/ 16”
600mm/ 24”
1.5m/ 59”
2207mm/ 98”
BS EN 1176
Installation Instructions
1. Using M10 nuts and
150mm bolts supplied locate through pre drilled holes and secure bolts in place to support in ground pole in concrete. 2 bolts per leg at 90 degree angles
1.5m
In ground fixing always 600mm for each chime and
400mm for beater poles
1.5m
Install Instrument with 1.5m free space
(from widest point) around it.
2207
1.5m
2.Excavate 7 holes for
Tubular Bells 250mm diameter by 600mm deep. 2 further holes will be needed for the beater poles according to layout of Bells at
250mm diameter and
400mm deep.
3. Locate (lower) legs into holes making sure they are vertical and level prior to concreting in place
4. Once happy with location of the Tubular Bells, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines
Ground
Surface
600mm
Weight of heaviest part 10kg (XXL Bell)
Pair Large Red
Beaters X1
Ground Fix
Components: x14
M10x150 Bolt M10 Nut x28
Spares available from percussionplay.com or from your local distributor
59 Kg
Ground Fixed
Tubular Bells
Page 2 of 2
Ground Fix Post Installation
1 2
Components: x14
M10x200 Threaded Bar x28
M10 BZP Nut
Metric Conversion:
50mm/ 2”
250mm/ 10”
350mm/ 14”
400mm/ 16”
450mm/ 18”
600mm/ 24”
650mm/ 26”
3
Insert M10x 150 Threaded bar into pre drilled holes in Ground Fixing Post
(1.1)
Fix M10x 150 Threaded bar in place using M10
Nuts
Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176.
Excavate 7 holes with a
250mm diameter tapering down to 350mm diameter and 650mm depth
5 6
250
Compact base of hole with
50mm of aggregate.
Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)
Fix hole with fast drying concrete to manufacturers specifications.
600mm max depth 7x Tubular Bells
400mm max depth 2X Beater Poles
Concrete
Aggregate
350
BS EN 1176
Ground Fixed
Flat Pack Harmony
Page 1 of 3
Instrument
Components:
M10 Nut x6
M6x20 Security Screw x3
M6 Saddle Strap
Metric Conversion:
250mm/ 10”
400mm/ 16”
1385mm/ 55”
1.5m/ 59”
BS EN 1176
Installation Instructions
1. Unpack frame 3no.
2. Lay packaging out on floor or assemble on non-abrasive surface to prevent marking of polished stainless steel.
3. Align holes on legs
(opposite end to polished domes) and secure in place using 3no. M10 x 200mm threaded bar and 6no. M10 nuts provided
Tools required 2no. 17mm metric spanner/wrench ( 11 inch or alternatively using adjustable wrench)
/
16
8. Locate (lower) legs into hole making sure they are vertical and level prior to concreting in place.
5. Once happy with location of the Instrument, fill hole using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.
1.5m
1385mm
4. Invert assembled frame so domed ends face upwards.
x2
5. Insert M8x60mm Security screws into pre drilled holes in frame using TX40 bit.
x2 x2
Weight of heaviest part 16kg (Harmony Frame) x3
6. Attach Notes to Harmony
Frame. (See Assembly Guide
Sheet)
3.Excavate 1 hole for the
Steel leg 250mm diameter by minimum 400mm deep, in desired location upon decision from customer.
400mm
Pair Small Red
Beaters X1
Ground Fix
Components: x3
M10x200 Bolt M10 Nut x6 x2
M8x60 Security Screw
1.5m
Install Instrument with 1.5m free space
(from widest point) around it.
CAUTION:
Harmony surface can get hot in direct sunlight, if possible install in shaded areas.
Ground Surface
Can be installed deeper if required
Spares available from percussionplay.com or from your local distributor
20 Kg
Ground Fixed
Harmony Flat Pack
Page 2 of 3
Assembly Guide PPHARM
Thread Lock Solution
Required
Tools: x1
TX 30 Driver Bit x1
TX 40 Driver Bit
Instrument
Components: x6
M6x20 Security Screw x3
M6 Saddle Strap
Thread Lock Solution
Required
BS EN 1176
Thread Lock Solution
Required
Pair Small Red
Beaters X1
Ground Fix
Components: x3
M10x200 Bolt M10 Nut x6 x2
M8x60 Security Screw
COMPONENTS LIST:
M10 Nut X6
M10x200 Threaded Bar X3
Saddle Strap X3
M6x20 Pin torx X6
M8x60 Pin torx X2
CAUTION:
Harmony surface can get hot in direct sunlight, if possible install in shaded areas.
Spares available from percussionplay.com or from your local distributor
20 Kg
Ground Fixed
Harmony Flat Pack
Page 3 of 3
Ground Fix Post Installation
Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN
1176.
Tools: x1
TX 40 Driver Bit
Metric Conversion:
50mm/ 2”
250mm/ 10”
350mm/ 14”
400mm/ 16”
450mm/ 18”
(1.1)
Components: x3
M10x200 Threaded Bar x6
M10 BZP Nut x2
M8x60 Security Screw
Thread Lock Solution
Required
250
1
If Harmony needs to be positioned lower a deeper hole can be excavated.
400mm min depth
350
Excavate a holes with a
250mm diameter tapering down to 350mm diameter and 450mm depth
2
BS EN 1176
3
Compact base of hole with
50mm of aggregate. Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)
Fill hole with fast drying concrete to manufacturers specifications.
Installation Instructions
1. Attach Ground Fixing posts to legs(1.2) (See Ground Fix
Post Installation Sheet)
1.5m
1.5m
Install Instrument with 1m free space
(from widest point) around it.
Ground Fixed
Bell Lyre
Page 1 of 2 2.Excavate1 hole for the
Steel leg 250mm diameter by
600mm deep, in desired location upon decision from customer.
1840mm
3. Locate (lower) legs into hole making sure they are vertical and level prior to concreting in place.
Instrument
Components: x4
M6x20 Security Screw x2
M6 Saddle Strap
Metric Conversion:
250mm/ 10”
600mm/ 24”
1.5m/ 59”
1525mm/ 60”
BS EN 1176
Weight of heaviest part 14.4kg
(Bell Lyre)
Pair Small Red
Beaters X1
Ground Fix
Components:
4. Once happy with location of the Instrument, fill hole using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.
600mm
Ground Surface
CAUTION: Bell
Lyre surface can get hot in direct sunlight, if possible install in shaded areas.
x2
M10x200 Bolt M10 Nut x4 x1
M10x70 Security Screw x1
M10 Barrel Nut
Spares available from percussionplay.com or from your local distributor
23.5 Kg
Ground Fixed
Bell Lyre
Page 2 of 2
Components: x2
M10x200 Threaded Bar x4
M10 BZP Nut x1
M10 Barrel Nut x1
M10x70 Security Screw
Thread Lock Solution
Required (Not Supplied)
Ground Fix Post Installation
1 2 3 4
Thread Lock Solution
Required (Not Supplied)
Tools: x2
TX 45 Driver Bit
Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part
7 of BS EN 1176.
5
Insert M10x 200 Threaded bar into pre drilled holes in Ground Fixing Post
Fix M10x 200 Threaded Locate the Ground fix Post into the leg of the instrument.
Fix instrument to Ground fix post using M10 bolt and Barrel Nut and use thread locking solution to prevent fixings working loose.
6 7
250
Metric Conversion:
50mm/ 2”
100mm/ 4”
250mm/ 10”
350mm/ 14”
600mm/ 24”
650mm/ 26”
Excavate 1 hole with a
250mm diameter tapering down to 350mm diameter and 650mm depth
600mm min depth
Can be buried deeper if required
Compact base of hole with
50mm of aggregate.
Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)
Fix hole with fast drying concrete to manufacturers specifications.
Concrete
Aggregate
350
BS EN 1176
advertisement