advertisement
IMPORTANT SAFETY INSTRUCTIONS
Read these instructions in their entirety before installing or operating.
SAVE THESE INSTRUCTIONS. Enclosed are important instructions that must be followed during installation and maintenance.
Turn AIR “OFF” and contact Primus Wind Power Customer Service
Department if unusual noise or operation is observed.
Install AIR on a calm day - no wind at ground level.
Properly torque all fasteners.
Use grounding techniques as established by the NEC. Install turbine in accordance with this manual and local and national building codes. Failure to comply may affect and possibly void your warranty.
Properly complete the Warranty Registration Card or register your product online at www.primuswindpower.com/warranty.
Rotating blades are a serious mechanical hazard. Install AIR wind turbines so no one can come into contact with blades.
Observe wire size and fuse recommendations listed in the Wiring
Section of this manual.
In this manual
IMPORTANT: Please take note
TIP: Helpful information
WARNING: Risk of injury or death - proceed with extreme caution
MARINE: Information specific to corrosive environments
AIR 30: Information specific to AIR 30 only
4 AIR Owner’s Manual
Contents
IMPORTANT SAFETY INSTRUCTIONS ________________________ 4
TECHNICAL SPECIFICATIONS ______________________________ 7
SITING _______________________________________________ 9
TIPS FOR BATTERY BANK SIZING ____________________________ 11
INSTALLATION ___________________________________________ 12-16
Arrival Kit ____________________________________________ 12
Blade to Hub Assembly ________________________________ 13-14
Blade Hub to Turbine Assembly __________________________ 15-16
Turbine to Tower Assembly _____________________________ 16
TOWERS _______________________________________________ 17-19
Tower Options __________________________________________ 17
27 ft (8.3 m) Tower Kit _____________________________ 17
29 ft (8.8 m) Tower Kit _____________________________ 17
45 ft (13.7 m) Tower Kit ____________________________ 18
Marine Tower Kit _________________________________ 18
Roof Mounting Kit ________________________________ 19
WIRING OPTIONS ________________________________________ 20-28
Single Turbine Installation ____________________________ 20
Up-Tower Junction Box _______________________________ 21
Hybrid System ______________________________________ 22
Multiple Systems ____________________________________ 23
Wire Size __________________________________________ 24-25
Stop Switch _________________________________________ 26
Fuses, Circuit Breakers, Ammeter _______________________ 27
Turbine Grounding ___________________________________ 28
Electrodes Driven in Soil ________________________ 28
AIR WIND TURBINE OPERATION ____________________________ 30-32
Operational Summary ________________________________ 30
Operating Modes ____________________________________ 30
Voltage Regulation ___________________________________ 31
Adjusting Regulation Voltage _______________________ 31
Using an Alternate Charge Controller _________________ 31-32
MAINTENANCE __________________________________________ 32
TROUBLE SHOOTING _____________________________________ 33
EXPLODED VIEWS & PARTS LIST _____________________________ 34-37
WARRANTY _____________________________________________ 38-40
AIR Owner’s Manual 5
Notes
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
6 AIR Breeze Owner’s Manual
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 4 IMPORTANT SAFETY INSTRUCTIONS
- 7 TECHNICAL SPECIFICATIONS
- 9 SITING
- 11 TIPS FOR BATTERY BANK SIZING
- 12 INSTALLATION
- 12 Arrival Kit
- 13 Blade to Hub Assembly
- 15 Blade Hub to Turbine Assembly
- 16 Turbine to Tower Assembly
- 17 TOWERS
- 17 Tower Options
- 17 27 ft (8.3 m) Tower Kit
- 17 29 ft (8.8 m) Tower Kit
- 18 45 ft (13.7 m) Tower Kit
- 18 Marine Tower Kit
- 19 Roof Mounting Kit
- 20 WIRING OPTIONS
- 20 Single Turbine Installation
- 21 Up-Tower Junction Box
- 22 Hybrid System
- 23 Multiple Systems
- 24 Wire Size
- 26 Stop Switch
- 27 Fuses, Circuit Breakers, Ammeter
- 28 Turbine Grounding
- 30 AIR WIND TURBINE OPERATION
- 30 Operational Summary
- 30 Operating Modes
- 31 Voltage Regulation
- 31 Adjusting Regulation Voltage
- 32 MAINTENANCE
- 33 TROUBLE SHOOTING
- 34 EXPLODED VIEWS & PARTS LIST
- 38 WARRANTY