advertisement
![4 The INTECRIO Components. ETAS INTECRIO | Manualzz 4 The INTECRIO Components. ETAS INTECRIO | Manualzz](http://s1.manualzz.com/store/data/068177093_1-3c2a2283062acc97ba02f5e7f9a9fcaa-360x466.png)
ETAS The INTECRIO Components
4 The INTECRIO Components
INTECRIO consists of a series of base components and connectivity packages.
INTECRIO Integration Platform
Integration
OS Configurator
Experiment
Environment
RTA-Trace
Connectivity
Hardware
Configurator
Project Integrator
INCA
M ATLAB
®
/Simulink
Connectivity
®
INCA-EIP
INTECRIO-RP
ES1000
Connectivity
ES900
Connectivity
RTPRO-PC
Connectivity
Target connectivity
INTECRIO-VP
VP-PC
Connectivity
INTECRIO-RLINK rapid/virt. prototyping in M ATLAB /Simulink
Further INTECRIO-related tools and products
ASCET
Connectivity
INCA Connector
M ATLAB /Simulink back animation in INCA
RTA-RTE required for
AUTOSAR
Fig. 4-1 INTECRIO – components
(black: INTECRIO, light grey: ETAS tools that can be used to experiment with INTECRIO, dark grey: INTECRIO-related ETAS tools)
The project configurator (section 4.8), OS configurator (section 4.9), hardware
configurator (section 4.3) and project integrator (section 4.10) are indispensable
for working with INTECRIO; they are part of the INTECRIO integration platform.
The documentor (section 4.12) is also part of the INTECRIO integration platform.
The ETAS Experiment Environment (section 4.11), which includes RTA-TRACE
connectivity (section 4.13), INCA and INCA-EIP are separate products. The ETAS
experiment is shipped with INTECRIO; INCA and INCA-EIP have to be purchased individually.
Target Connectivity: The INTECRIO-RP package provides connectivity to the
rapid prototyping hardware, i.e. ES1000 (section 4.4), ES900 (section 4.5) and
RTPRO-PC (section 4.6), and the INTECRIO-VP package provides connectivity to
the PC (section 4.7) and all prerequisites for virtual prototyping.
BMT Connectivity: Different behavioral modeling tools or BMTs allow users to model the functionality of the application software. The models are integrated in the system project. Checking or editing the models is not part of INTECRIO;
INTECRIO only serves as integration tool in this context.
INTECRIO V4.6 - User’s Guide 49
advertisement
Related manuals
advertisement
Table of contents
- 7 1 Introduction
- 7 Safety Advice
- 7 Correct Use
- 7 Labeling of Safety Instructions
- 8 Demands on the Technical State of the Product
- 9 2 Understanding INTECRIO
- 10 Challenges of the Electronic Control Unit Development
- 10 Complexity Through System Requirements
- 12 Complexity Through Distributed Development
- 13 Possible Steps
- 13 Description of Electronic Systems
- 14 Design and Operating Method of Electronic Systems
- 15 Architecture and Description of Electronic Systems
- 17 Application Software
- 20 Platform Software: Hardware Systems
- 20 Connecting Hardware and Software
- 21 Virtual Prototyping
- 22 Target-Close Prototyping
- 22 Advantages of Virtual Prototyping
- 23 Virtual Prototyping and Rapid Prototyping
- 24 INTECRIO in the Development Process
- 25 The INTECRIO Working Environment
- 29 Software Systems
- 29 Modules and AUTOSAR Software Components
- 31 Functions
- 32 Software Systems
- 32 Environment Systems
- 33 Hardware Systems
- 34 System Projects
- 36 Crossbar
- 38 Experimenting with INTECRIO
- 40 3 INTECRIO and AUTOSAR
- 40 Overview
- 41 RTA-RTE and RTA-OS
- 42 Creating AUTOSAR Software Components (outside INTECRIO)
- 42 Validating Software Components
- 44 What is a Runtime Environment?
- 45 AUTOSAR Elements in INTECRIO
- 45 AUTOSAR Software Components
- 46 Ports and Interfaces
- 46 Sender-Receiver Communication
- 47 Client-Server Communication
- 47 Calibration Parameter Interfaces
- 47 Runnable Entities and Tasks
- 48 Inter-Runnable Variables
- 48 Runtime Environment
- 49 4 The INTECRIO Components
- 50 Connectivity
- 52 Characteristics in the Creation of the Simulink Model
- 53 Contents of the Description File
- 54 ASCET Connectivity
- 55 Characteristics in the Creation of the ASCET Model
- 55 Contents of the Description File
- 56 The Hardware Configurator
- 57 HWX Import
- 57 Ethernet Controller and XCP on UDP
- 58 XXX to CAN Gateway
- 58 ES1000 Connectivity and Hardware Configurator
- 59 Configuring the ES1000 in the Hardware Configurator
- 62 Board Types and Supported Boards
- 67 ES900 Connectivity and Hardware Configurator
- 68 ES900 Configuration in the Hardware Configurator
- 71 Interface Types and Supported Interfaces
- 78 RTPRO-PC Connectivity and Hardware Configurator
- 78 RTPRO-PC Configuration in the Hardware Configurator
- 81 Interface Types and Supported Interfaces
- 84 PC Connectivity
- 86 The Project Configurator
- 86 Offline Mode
- 86 Modules and SWC
- 87 Functions
- 88 Software Systems and Environments
- 89 System Projects
- 90 Online Mode
- 90 The OS Configurator
- 91 Tasks of the Operating System
- 91 Scheduling
- 92 Tasks
- 93 Cooperative and Preemptive Scheduling
- 94 Data Consistency with Preemptive Scheduling
- 96 Application Modes
- 97 Design of the OS Configurator
- 98 The OSC Editor
- 99 Creating Tasks
- 101 Task Properties
- 104 Setting Up Timer and Software Tasks
- 105 RTA-OSEK/RTPRO-PC without SWC only)
- 107 4.10 The Project Integrator
- 108 The Build Process
- 108 Overview
- 109 Sequence
- 110 ASAM-MCD-2MC Generation
- 111 4.11 The ETAS Experiment Environment
- 112 Validation and Verification
- 112 Measuring and Calibrating
- 114 Experimenting with Different Targets
- 116 Environment
- 116 Bypass Experiment
- 117 Fullpass Experiment
- 119 X-Pass Experiment
- 119 Environment
- 119 4.12 The Documentor
- 120 4.13 RTA-TRACE Connectivity
- 121 5 SCOOP and SCOOP-IX
- 121 The SCOOP Concept
- 122 The SCOOP-IX Language
- 122 Modules and Interfaces
- 123 Description of the C Code Interface
- 124 Description of Semantic Information
- 124 Model Origin
- 126 Implementation
- 127 Module Data
- 128 Creation of SCOOP-IX and Example
- 138 6 Modeling Hints
- 138 Modeling for INTECRIO
- 138 Modeling with Simulink
- 140 Modeling with ASCET
- 140 Integration of User Code
- 140 Integrating GT-Power/GT-SUITE Models in INTECRIO
- 141 Copying Example Files
- 141 Handling Multiple GT-SUITE Installations
- 142 /Simulink Environment
- 143 Checking the Simulink/GT-SUITE Model
- 146 Building in INTECRIO
- 147 Preparation for Experiment with INCA or INTECRIO
- 149 7 Bypass Concept
- 149 ETK Bypass Concept Description
- 149 Bypass Input
- 150 Hook-Based Bypass
- 150 Classical
- 150 With Distab
- 151 Service-Based Bypass
- 153 Safety Considerations
- 153 Bypass Input Data
- 153 Bypass Calculation
- 153 Bypass Output Data
- 153 Message Copies
- 154 Service-Based Bypass Specifics
- 155 Functions
- 156 Controlling the ECU Behavior from INTECRIO
- 156 OS Configuration for Service-Based Bypass V
- 156 Restrictions
- 157 Classical ECU Function Bypass
- 158 Bypass of an Entire ECU Functionality
- 159 Rasters
- 161 ECU-Synchronous Write-Back
- 162 Summary
- 164 8 Glossary
- 164 Abbreviations
- 168 Terms
- 174 9 Appendix: The INCA Connector
- 174 System Requirements
- 174 Installation
- 175 Working with the INCA Connector
- 179 Index