advertisement
STEP 16. PRE-DELIVERY
INSPECTION
PRE-DELIVERY INSPECTION
B. WHEEL BOLT TORQUE
(TRANSPORT AND STABILIZER
WHEEL OPTIONS)
Check wheel bolt torque is 80 - 90 ft·lbf
(110 - 120 N·m).
IMPORTANT
To avoid machine damage, check that no shipping dunnage has fallen into machine.
Perform the final checks as listed on the "Pre-
Delivery Checklist" (yellow sheet attached to this instruction) to ensure the machine is field-ready.
Refer to the following pages for detailed instructions as indicated on the checklist.
IMPORTANT
The machine has been set at the factory, and should require no further adjustments.
However, perform the following checks to ensure your machine will provide maximum performance. Adjustments should be made only if absolutely
necessary, and in accordance with the instructions in this manual.
The completed checklist should be retained either by the Operator or the Dealer.
6
4
1
2
3
5
Refer to bolt tightening sequence illustration above.
BETWEEN LOWER HOLE
AND END OF DIPSTICK
A. TIRE PRESSURE (TRANSPORT AND
STABILIZER WHEEL OPTIONS)
Check tire inflation pressure.
If necessary, inflate as per following table.
A
B
2006 and
EARLIER
GOODYEAR
WRANGLER
RT/S
2007 and
LATER
CARLISLE and TITAN
205-75
R15
ST205/75
R15
40 psi
(276 kPa)
65 psi
(448 kPa)
IMPORTANT
Do not exceed maximum pressure specified on tire side wall.
CHECK OIL LEVEL WITH TOP OF
WOBBLE BOX HORIZONTAL
C. WOBBLE BOX
a. Position of plug (A) and breather (B) at wobble box must be as shown. b. Check oil level.
(continued next page)
Form 169007
32
Revision C
advertisement
Related manuals
advertisement
Table of contents
- 4 INTRODUCTION
- 4 GENERAL SAFETY
- 6 RECOMMENDED TORQUES
- 6 GENERAL
- 6 SAE BOLTS
- 6 METRIC BOLTS
- 7 HYDRAULIC FITTINGS
- 8 ENGLISH/METRIC EQUIVALENTS
- 9 STEP 1. UNLOAD HEADER
- 10 STEP 2. LOWER HEADER
- 10 SINGLE REEL HEADERS
- 11 DOUBLE REEL HEADERS - D60 ONLY
- 12 REMOVE SHIPPING SUPPORTS
- 14 ATTACH REEL LIFT CYLINDERS
- 17 ATTACH TO WINDROWER
- 19 CONNECT CENTER-LINK
- 21 CONNECT HYDRAULICS
- 23 CONNECT REEL TO FORE-AFT CYLINDERS
- 25 ATTACH CAM ARMS
- 26 INSTALL REEL ENDSHIELDS
- 27 INSTALL CROP DIVIDERS
- 29 INSTALL HEADER ENDSHIELDS
- 29 HINGED ENDSHIELD
- 31 NON-HINGED ENDSHIELD
- 32 ADJUST TRANSPORT LIGHTS
- 32 INSTALL OPTIONS
- 33 ADD BALLAST
- 34 PRE-DELIVERY INSPECTION
- 34 TIRE PRESSURE (Transport and Stabilizer Wheel Options)
- 34 WHEEL BOLT TORQUE (Transport and Stabilizer Wheel Options)
- 34 WOBBLE BOX
- 35 SICKLE DRIVE BELT TENSION
- 35 NON-TIMED DRIVE - SK and DK
- 35 TIMED DRIVE - DK
- 36 REEL CENTERING
- 37 DRAPER TENSION
- 38 SKID SHOE SETTINGS
- 38 HEADER LEVELLING
- 39 REEL TINE TO CUTTERBAR CLEARANCE
- 40 DRAPER SEAL
- 41 LUBRICATE HEADER
- 44 MANUALS
- 45 RUN-UP THE HEADER
- 46 POST RUN-UP CHECKS
- 46 KNIFE