CB 140 Manual


Add to my manuals
114 Pages

advertisement

CB 140 Manual | Manualzz

Operator's Manual: Model CB-140

SECTION 5: METERING PUMP PRIMING

Understanding Metering Pump Priming

Preparing your Clean Burn furnace for operation begins with priming the metering pump. The procedures in this section must be performed in sequence without interruption to properly prime the pump.

Required Tools and Materials

The following tools and materials are required for oil pump priming and should be gathered before starting any procedures:

• 3/8" open-end wrench

• 5/8" open-end wrench

• Rags

• Two containers (minimum one-gallon)

• Permatex #2 non-hardening gasket sealer

• Adjustable Wrench

• Pipe Wrench

5-1

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

advertisement

Table of contents