Installation
1. Air pocket
Figure 19: Incorrect
1. No air pockets
2. Gradual rise
Figure 20: Correct
1. No air pockets
2. Eccentric reducer
3. Gradual rise
Figure 21: Gradual rise to the pump – correct
1. Distance plus eccentric reducer straightens the flow
Figure 22: Suction pipe above the pump – correct
1. Path of the water
Figure 23: Suction pipe above the pump – incorrect
Suction-piping valve considerations
Suction valves
CAUTION:
Never throttle the flow from the suction side. Only use suction valves to isolate the pump for maintenance, and install such valves in positions to avoid air pockets.
Before you install suction valves in the suction piping, review these considerations:
Model 3408 Installation, Operation, and Maintenance Manual 27
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 5 Introduction and Safety
- 5 Introduction
- 5 Safety
- 6 Safety terminology and symbols
- 7 Environmental safety
- 7 User safety
- 8 Safety regulations for Ex-approved products in potentially explosive atmospheres
- 9 Monitoring equipment
- 10 Product warranty
- 11 Transportation and Storage
- 11 Inspect the delivery
- 11 Inspect the package
- 11 Inspect the unit
- 11 Transportation guidelines
- 11 Lifting methods
- 13 Storage guidelines
- 13 Pump storage requirements
- 15 Product Description
- 15 General description
- 16 Nameplate information
- 19 Installation
- 19 Preinstallation
- 19 Pump location guidelines
- 20 Foundation requirements
- 21 Set the baseplate
- 21 Pump-to-driver alignment
- 22 Alignment checks
- 23 Align the pump using a straight edge
- 24 Align the pump using a dial indicator
- 25 Grout the baseplate
- 26 Piping checklists
- 26 General piping checklist
- 27 Suction piping checklist
- 29 Suction-piping valve considerations
- 30 Discharge piping considerations
- 30 Pressure gauges
- 31 Pump doweling
- 32 Commissioning, Startup, Operation, and Shutdown
- 32 Preparation for startup
- 33 Pump priming
- 33 Fill the system
- 34 Start the pump
- 34 Operational checklist
- 35 Shut down the pump
- 35 Freeze protection
- 36 Maintenance
- 36 Maintenance schedule
- 37 Flood-damaged pumps
- 37 Bearing maintenance
- 37 Regrease the grease-lubricated bearings
- 39 Lubricate the oil-lubricated bearings
- 41 Bearing temperatures
- 41 Coupling lubrication
- 41 Shaft-seal maintenance
- 41 Packed stuffing box maintenance
- 42 Mechanical seal maintenance
- 43 Disassembly
- 43 Disassembly precautions
- 43 Change the rotation
- 45 Remove the upper half of the casing
- 45 Remove the rotating element
- 45 Disassemble the pump with packing
- 48 Disassemble the pump with mechanical seals on the shaft
- 51 Disassemble the pump with mechanical seals on the shaft sleeve
- 53 Preassembly
- 53 Replace wear parts
- 53 Reassembly
- 53 Assemble the pump with packing
- 57 Assemble the pump with mechanical seals on the shaft
- 59 Assemble the pump with mechanical seals on the shaft sleeves
- 62 Install the bearings
- 63 Install the gaskets
- 64 Install the rotating element
- 65 Assemble the casing
- 65 Complete the assembly with packing
- 66 Install the packing (optional method)
- 66 Vertical units
- 66 Remove the upper half of the casing
- 69 Remove the rotating element
- 70 Assemble the rotating element
- 70 Assemble the casing
- 71 Remove the complete pump
- 71 Spare parts
- 73 Troubleshooting
- 73 Troubleshooting
- 76 Parts Listings and Cross-Sectionals
- 76 Exploded views
- 79 Parts list
- 80 Local ITT Contacts
- 80 Regional offices