- No category
advertisement
▼
Scroll to page 2
of 80
Visit our website for the latest version of this document and more information:
http://www.gouldspumps.com
ITT - Goulds Pumps
240 Fall Street
Seneca Falls, NY 13148
USA
Tel. 1–800–446–8537
Fax (315) 568–2418
© 2015 ITT Corporation
The original instruction is in English. All non-English instructions are translations of the original instruction.
Form IOM.3408.EN-US.2015-11
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
Download PDF
advertisement
Table of contents
- 5 Introduction and Safety
- 5 Introduction
- 5 Safety
- 6 Safety terminology and symbols
- 7 Environmental safety
- 7 User safety
- 8 Safety regulations for Ex-approved products in potentially explosive atmospheres
- 9 Monitoring equipment
- 10 Product warranty
- 11 Transportation and Storage
- 11 Inspect the delivery
- 11 Inspect the package
- 11 Inspect the unit
- 11 Transportation guidelines
- 11 Lifting methods
- 13 Storage guidelines
- 13 Pump storage requirements
- 15 Product Description
- 15 General description
- 16 Nameplate information
- 19 Installation
- 19 Preinstallation
- 19 Pump location guidelines
- 20 Foundation requirements
- 21 Set the baseplate
- 21 Pump-to-driver alignment
- 22 Alignment checks
- 23 Align the pump using a straight edge
- 24 Align the pump using a dial indicator
- 25 Grout the baseplate
- 26 Piping checklists
- 26 General piping checklist
- 27 Suction piping checklist
- 29 Suction-piping valve considerations
- 30 Discharge piping considerations
- 30 Pressure gauges
- 31 Pump doweling
- 32 Commissioning, Startup, Operation, and Shutdown
- 32 Preparation for startup
- 33 Pump priming
- 33 Fill the system
- 34 Start the pump
- 34 Operational checklist
- 35 Shut down the pump
- 35 Freeze protection
- 36 Maintenance
- 36 Maintenance schedule
- 37 Flood-damaged pumps
- 37 Bearing maintenance
- 37 Regrease the grease-lubricated bearings
- 39 Lubricate the oil-lubricated bearings
- 41 Bearing temperatures
- 41 Coupling lubrication
- 41 Shaft-seal maintenance
- 41 Packed stuffing box maintenance
- 42 Mechanical seal maintenance
- 43 Disassembly
- 43 Disassembly precautions
- 43 Change the rotation
- 45 Remove the upper half of the casing
- 45 Remove the rotating element
- 45 Disassemble the pump with packing
- 48 Disassemble the pump with mechanical seals on the shaft
- 51 Disassemble the pump with mechanical seals on the shaft sleeve
- 53 Preassembly
- 53 Replace wear parts
- 53 Reassembly
- 53 Assemble the pump with packing
- 57 Assemble the pump with mechanical seals on the shaft
- 59 Assemble the pump with mechanical seals on the shaft sleeves
- 62 Install the bearings
- 63 Install the gaskets
- 64 Install the rotating element
- 65 Assemble the casing
- 65 Complete the assembly with packing
- 66 Install the packing (optional method)
- 66 Vertical units
- 66 Remove the upper half of the casing
- 69 Remove the rotating element
- 70 Assemble the rotating element
- 70 Assemble the casing
- 71 Remove the complete pump
- 71 Spare parts
- 73 Troubleshooting
- 73 Troubleshooting
- 76 Parts Listings and Cross-Sectionals
- 76 Exploded views
- 79 Parts list
- 80 Local ITT Contacts
- 80 Regional offices