- Industrial & lab equipment
- Measuring, testing & control
- Mitsubishi Electric
- FR-F806-E-L2 (IP55/UL Type 12
- Instruction manual
advertisement
Communication connectors and terminals
Removal and reinstallation of the operation panel
• Loosen the four fixing screws on the operation panel and pull out the operation panel. (These screws cannot be removed.)
• To reinstall the operation panel, align its connector on the back with the PU connector of the inverter, and insert the operation panel. After confirming that the operation panel is fit securely, tighten the screws in the diagonal order.
(Tightening torque: 0.39 to 0.49 N·m)
2.8.2
Ethernet connector
Ethernet communication specifications
Item
Category
Data transmission speed
Transmission method
Maximum segment length
Number of cascade connection stages
Interface
Number of interfaces available
IP version
Description
100BASE-TX/10BASE-T
100 Mbps (100BASE-TX) / 10 Mbps (10BASE-T)
Baseband
100 m between the hub and the inverter
Up to 2 (100BASE-TX) / up to 4 (10BASE-T)
RJ-45
1
IPv4
Connection cable
Use Ethernet cables compliant with the following standards.
Communication speed
100 Mbps
Cable Connector
10 Mbps
Category 5 or higher, (shielded / STP) straight cable
Category 3 or higher, (shielded / STP) straight cable
Category 3 or higher, (UTP) straight cable
RJ-45 connector
Hub
Use a hub that supports transmission speed of the Ethernet.
Standard
100BASE-TX
10BASE-T
48
advertisement
Related manuals
advertisement
Table of contents
- 13 Inverter and peripheral devices
- 15 Peripheral devices
- 19 Inverter installation environment
- 21 Inverter installation
- 26 Details on the main circuit terminals
- 26 Terminal layout of the main circuit terminals, wiring of power supply and the motor
- 27 Wiring method
- 30 Applicable cables and the wiring length
- 32 Earthing (grounding) precautions
- 33 Details on the control circuit terminals
- 37 Control logic (sink/source) change
- 39 Wiring of control circuit
- 41 Wiring precautions
- 42 When supplying 24 V external power to the control circuit
- 43 Safety stop function
- 45 Components of the operation panel
- 46 Outline of the Main monitor indicator
- 47 Basic operation of the operation panel
- 48 PU connector
- 49 Ethernet connector
- 50 USB connector
- 52 Connection of the brake unit (FR-BU2)
- 54 Connection of the brake unit (FR-BU)
- 55 Connection of the brake unit (BU type)
- 56 Connection of the high power factor converter (FR-HC2)
- 57 Connection of the power regeneration common converter (FR-CV)
- 58 Connection of the power regeneration converter (MT-RC)
- 61 Leakage currents and countermeasures
- 63 Countermeasures against inverter-generated EMI
- 65 Built-in EMC filter
- 66 Power supply harmonics
- 67 Harmonic suppression guidelines in Japan
- 81 Daily inspection
- 81 Periodic inspection
- 82 Daily and periodic inspection
- 84 Checking the inverter and converter modules
- 84 Cleaning
- 85 Replacement of parts
- 104 Precautions for removal and reinstallation of the control circuit terminal block
- 107 Measurement of powers
- 107 Measurement of voltages and use of PT
- 108 Measurement of currents
- 108 Use of CT and transducer
- 108 Measurement of inverter input power factor
- 108 Measurement of converter output voltage (across terminals P and N)
- 109 Measurement of inverter output frequency
- 109 Insulation resistance test using megger
- 109 Pressure test
- 119 Appendix 1 Differences and compatibility with the FR-F
- 120 Appendix 2 Instructions for compliance with the EU Directives
- 123 Appendix 3 Instructions for UL and cUL
- 125 Appendix 4 Instructions for EAC
- 126 Appendix 5 Restricted Use of Hazardous Substances in Electronic and Electrical Products