advertisement
Table 8—Maximum Allowable Exposed Vent Pipe Length (ft) With and Without Insulation in Winter Design
Temperature Ambient*
UNIT
SIZE
060
080
100
120
WINTER DESIGN
TEMPERATURE
(°F)
20
0
-20
20
0
-20
20
0
-20
20
0
-20
20
0
-20
20
0
-20
20
0
-20
MAX PIPE
DIAMETER
(IN.)
2
2
2
2
2
2
2.5
2.5
2.5
2.5
2.5
2.5
3
3
3
3
3
3
4
4
4
WITHOUT
INSULATION
44
21
20
55
30
16
58
29
14
40
38
21
63
30
12
70
38
19
65
26
5
WITH 3/8–IN. OR
THICKER INSULATION†
70
70
57
55
55
55
70
70
67
40
40
40
70
70
70
70
70
70
70
70
65
* Pipe length (ft) specified for maximum pipe lengths located in unconditioned spaces. Pipes located in unconditioned space cannot exceed total allowable pipe length as specified in Table 7.
† Insulation thickness based on R value of 3.5 per in.
A
32oF MINIMUM INSTALLED
AMBIENT OR FREEZE
PROTECTION REQUIRED
A96128
Fig. 43—Rooftop Termination (Dimension “A” is
Touching or 2–in. Maximum Separation)
Fig. 42—Freeze Protection
A93058
An external trap is not required when connecting the field drain to this condensate trap.
The field drain connection (condensate trap or drain tube coupling) is sized for l/2-in. CPVC, 1/2-in. PVC, or 5/8-in. ID tube connection.
Drain pipe and fittings must conform to ANSI standards and
ASTM D1785, D2466 or D2846. CPVC or PVC cement must conform to ASTM D2564 or F493. Primer must conform to ASTM
F656. In Canada, use CSA or ULC listed schedule 40 CPVC or
PVC drain pipe, fittings, and cement.
33
When a condensate pump is required, select a pump which is approved for condensing furnace applications. To avoid condensate spillage, select a pump with an overflow switch.
Furnace condensate is mildly acidic, typically in the pH range of
3.2 to 4.5. Due to corrosive nature of this condensate, a condensate pH neutralizing filter may be desired. Check with local authorities to determine if a pH neutralizer is required.
APPLICATION
The furnace, A/C, and humidifier drains may be combined and drained together. The A/C drain must have an external, fieldsupplied trap prior to the furnace drain connection. All drain connections (furnace, A/C, or humidifier) must be terminated into an open or vented drain as close to the respective equipment as possible to prevent siphoning of the equipment’s drain.
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 2 Safety Considerations
- 2 Introduction
- 5 Codes and Standards
- 5 Safety
- 5 General Installation
- 5 Combustion and Ventilation Air
- 5 Duct Systems
- 5 Acoustical Lining and Fibrous Glass Duct
- 5 Gas Piping and Gas Pipe Pressure Testing
- 5 Electrical Connections
- 5 Electrostatic Discharge (ESD) Precautions Procedure
- 6 Applications
- 6 General
- 6 Upflow Applications
- 6 Orientation)
- 8 Condensate Trap Field Drain Attachment
- 8 Pressure Switch Tubing
- 8 Drain Connections
- 8 Condensate Trap Freeze Protection
- 8 Downflow Applications
- 8 Condensate Trap Location
- 9 Condensate Trap Tubing
- 9 Condensate Trap Field Drain Attachment
- 9 Pressure Switch Tubing
- 10 Condensate Trap Freeze Protection
- 10 Applications
- 10 Condensate Trap Location
- 10 Condensate Trap Tubing
- 11 Condensate Trap Field Drain Attachments
- 11 Pressure Switch Tubing
- 11 Condensate Trap Freeze Protection
- 11 Construct a Working Platform
- 12 Horizontal Right (Supply-Air Discharge) Applications
- 12 Condensate Trap Location
- 12 Condensate Trap Tubing
- 13 Condensate Trap Field Drain Attachment
- 13 Pressure Switch Tubing
- 13 Condensate Trap Freeze Protection
- 13 Construct a Working Platform
- 13 Location
- 13 General
- 14 Equipment
- 14 Hazardous Locations
- 14 Installation
- 14 Leveling Legs (If Desired)
- 15 Applications
- 16 Installation in Horizontal Applications
- 16 Air Ducts
- 16 General Requirements
- 17 Ductwork Acoustical Treatment
- 17 Supply Air Connections
- 18 Return Air Connections
- 18 Filter Arrangement
- 18 Bottom Closure Panel
- 19 Gas Piping
- 20 Electrical Connections
- 20 115-V Wiring
- 21 24-V Wiring
- 22 Accessories
- 22 Direct Venting
- 25 Systems
- 25 Combustion-Air and Vent Piping
- 28 Kit Installation
- 32 Multiventing and Vent Terminations
- 32 Condensate Drain
- 32 General
- 33 Application
- 34 Condensation Drain Protection
- 34 Start-Up Adjustment and Safety Check
- 34 General
- 35 Sequence of Operation
- 36 (Adaptive Mode)
- 36 (Non-Adaptive Heating Mode)
- 37 Cooling Mode
- 39 Continuous Blower Mode
- 39 Thermidistat Mode
- 39 Continuous Blower Mode
- 40 Heat Pump
- 40 Start-Up Procedures
- 40 Purge Gas Lines
- 42 Component Self-Test
- 44 Prime Condensate Trap With Water
- 44 Operate Furnace
- 44 Furnace Restart
- 44 Adjustments
- 44 Set Gas Input Rate
- 47 Set Temperature Rise
- 47 Adjust Blower Off Delay (Heat Mode)
- 47 Set Thermostat Heat Anticipator
- 48 Check Safety Controls
- 48 Checklist