V1.0 2025-07-15
Copyright Statement
Copyright©GoodWe Technologies Co., Ltd. 2025. All rights reserved.
No part of this manual can be reproduced or transmitted to the public platform in any form or by any
means without the prior written authorization of GoodWe Technologies Co., Ltd.
Trademarks
GOODWE and other GOODWE trademarks are trademarks of GoodWe Technologies Co.,Ltd. All other
trademarks or registered trademarks mentioned in this brochure are the property of their respective
owners.
NOTICE
The information in this document is subject to change due to product updates or other reasons. This
document cannot replace the product labels or the safety precautions unless otherwise specified. All
descriptions in the manual are for guidance only.
1
Table of Contents
1 About This Manual
13
1.1 Overview
13
1.2 Applicable Model
13
1.3 Symbol Definition
14
2 Safety Precautions
15
2.1 General Safety
15
2.2 Personal Requirements
15
2.3 System Safety
16
2.3.1 PV String Safety
17
2.3.2 Inverter Safety
17
2.3.3 Battery Safety
18
2.3.4 Smart Meter Safety
20
2.4 Safety Symbols and Certification Marks
20
2.5 EU Declaration of Conformity
22
2.5.1 Equipment with Wireless Communication Modules
22
2.5.2 Equipment without Wireless Communication Modules (Except Battery) 22
2.5.3 Battery
22
3 System Introduction
24
3.1 System Overview
24
3.2 Product Overview
32
3.2.1 Inverter
32
2
3.2.2 Battery
35
3.2.2.1 LX A5.0-30
35
3.2.2.2 GW14.3-BAT-LV-G10
36
3.2.3 Smart Meter
36
3.2.4 Smart Dongle
38
3.3 Supported Grid Types
38
3.4 System Working Mode
38
3.5 Features
49
4 Check and Storage
54
4.1 Check Before Receiving
54
4.2 Deliverables
54
4.2.1 Inverter Deliverables
54
4.2.2 Battery Deliverables
56
4.2.2.1 Battery Deliverables (LX A5.0-30)
56
4.2.2.2 Battery Deliverables (GW14.3- BAT-LV-G10)
58
4.2.3 Busbar Deliverables
59
4.2.3.1 BCB-22-WW-0
59
4.2.3.2 BCB-32-WW-0
59
4.2.4 Smart Meter Deliverables (GM330)
59
4.3 Storage
60
5 Installation
63
5.1 System Installation and Commissioning Procedure
3
63
5.2 Installation Requirements
63
5.2.1 Installation Environment Requirements
63
5.2.2 Installation Space Requirements
65
5.2.3 Tool Requirements
66
5.3 Equipment Handling
68
5.4 Installing the Inverter
69
5.5 Installing the Battery System
71
5.5.1 LX A5.0-30
71
5.5.2 GW14.3-BAT-LV-G10
74
5.6 Installing the Smart Meter
75
6 System Wirings
77
6.1 System Wiring Electrical Block Diagram
77
6.2 Preparing Materials
80
6.2.1 Preparing Breakers
81
6.2.2 Preparing Cables
83
6.3 Removing Inverter Box Bottom Cover
87
6.4 Detailed System Wiring Diagram
87
6.5 Connecting the PE Cable
91
6.6 Connecting the AC Cable
92
6.7 Connecting the PV Cable
94
6.8 Connecting the Battery Cable
96
6.8.1 Connecting the Power Cable between the Inverter and Battery
4
115
6.8.2 Connecting the Communication Cable between the Inverter and
Battery
118
6.9 Connecting the Meter Cable
121
6.10 Connecting the Inverter Communication Cable
123
6.11 Installing Inverter Box Bottom Cover
127
6.12 Installing the Battery Cover
128
6.12.1 LX A5.0-30
128
6.12.2 GW14.3-BAT-LV-G10
128
7 System Commissioning
130
7.1 Check Before Power ON
130
7.2 Power ON
130
7.3 Indicators
132
7.3.1 Inverter Indicators
132
7.3.2 Battery Indicators
133
7.3.2.1 LX A5.0-30
133
7.3.2.2 GW14.3-BAT-LV-G10
133
7.3.3 Smart Meter Indicator
136
7.3.4 Smart Dongle Indicator
136
8 Rapid System Configuration
138
8.1 Downloading the App
138
8.1.1 Downloading SolarGo App
138
8.1.2 Downloading SEMS+ APP
138
5
8.2 Connecting the Energy Storage Inverter
139
8.3 Setting Communication Parameters
142
8.3.1 Setting Privacy and Security Parameters
143
8.3.2 Setting WLAN/ LAN Parameters
146
8.3.3 Setting RS485 Communication Parameters
148
8.4 Quick System Setup
149
8.4.1 Quick System Setup (Type II)
150
8.5 Power Plant Creation
156
9 System Commissioning
158
9.1 Commissioning Method Overview
158
9.2 Configuration via LCD
158
9.2.1 LCD Overview
158
9.2.2 Quick Settings
161
9.2.3 Setting Advanced Parameters
169
9.2.4 Setting Immediate Charging
170
9.2.5 Setting the Basic Information
171
9.2.6 Viewing Device Information
171
9.2.7 Setting Port Connection
171
9.3 SolarGo APP
176
9.3.1 APP Introduction
176
9.3.1.1 Downloading and Installing the App
176
9.3.1.2 Connection Method
177
6
9.3.1.3 Introduction of Interface
178
9.3.2 Connecting the Energy Storage Inverter
180
9.3.3 Introduction of the Energy Storage Inverter Interface
183
9.3.4 Setting Communication Parameters
185
9.3.4.1 Setting Privacy and Security Parameters
185
9.3.4.2 Setting WLAN/ LAN Parameters
188
9.3.4.3 Setting RS485 Communication Parameters
190
9.3.4.4 WLAN Detection
191
9.3.5 Quick System Setup
192
9.3.5.1 Quick System Setup (Type II)
9.3.6 Setting the Basic Information
193
199
9.3.6.1 Setting up Lightning Protection Alarm Function
199
9.3.6.2 Setting Backup Power Parameters
200
9.3.6.3 Setting up Shadow Scanning Function
202
9.3.6.4 Setting Power Adjustment Parameters
202
9.3.7 Setting Advanced Parameters
204
9.3.7.1 Setting Three-phase Unbalanced Output
204
9.3.7.2 Backup N and PE Relay Switch
205
9.3.7.3 Setting DRED/Remote Shutdown/RCR/EnWG 14a Function
206
9.3.7.4 Setting the On-Grid Power Limit
207
9.3.7.4.1 Setting the On-Grid Power Limit(General)
9.3.7.5 Setting the Arc Detection Function
7
208
208
9.3.7.6 Set Battery Function
209
9.3.7.6.1 Set Parameters for Lithium Battery
209
9.3.7.6.2 Setting Lead-acid Battery Parameter
213
9.3.7.7 Setting Power Adjustment Response Parameters
217
9.3.7.8 Setting Customized Safety Parameters
219
9.3.7.8.1 Setting Reactive Curve
219
9.3.7.8.2 Setting Active Curve
224
9.3.7.8.3 Setting Grid Protection Parameters
229
9.3.7.8.4 Setting Grid Connection Parameters
230
9.3.7.8.5 Setting Voltage Fault Ride through Parameters
232
9.3.7.8.6 Setting Frequency Fault Ride through Parameters
234
9.3.7.9 Setting PV Connect Mode
234
9.3.7.10 Setting Unbalanced Voltage Output Function
235
9.3.7.11 Restore Factory Settings
236
9.3.7.12 Exporting Parameters
237
9.3.7.12.1 Exporting Safety Parameters
237
9.3.7.12.2 Exporting Log Parameters
238
9.3.8 Setting Smart Meter Parameters
9.3.8.1 Meter/CT Assisted Test
239
239
9.3.9 Setting Generator/Load Control Parameters
240
9.3.9.1 Setting Load Control Parameters
240
9.3.9.2 Setting Generator Parameters
242
8
9.3.9.3 Setting Microgrid Parameters
9.3.10 Equipment Maintenance
246
247
9.3.10.1 View Firmware Information/Firmware Upgrade
247
9.3.10.1.1 Regular Firmware Upgrades
248
9.3.10.1.2 One-click Firmware Upgrade
249
9.3.10.1.3 Automatic Firmware Upgrade
250
9.3.10.2 Changing Login Password
250
10 Power Plant Monitoring
253
10.1 APP Introduction
253
10.1.1 Complementary Products
253
10.1.2 Downloading and Installing the App
253
10.1.3 Connection Method
254
10.1.4 Setting Language and Server
254
10.2 Managing the Account
255
10.2.1 Registering
255
10.2.2 Account Login
256
10.2.3 Switch
257
10.2.4 Canceling
257
10.2.5 Account Permissions
258
10.3 Setting Communication Parameters
262
10.3.1 Setting Communication Parameters via Bluetooth
263
10.3.2 Setting Communication Parameters via WiFi
265
9
10.4 Power Plant Monitoring
267
10.4.1 Viewing Power Plant Information
267
10.4.1.1 View All Power Plant Overview Information
267
10.4.1.2 Viewing Monopower Plant Details
269
10.4.1.2.1 Viewing Power Plant Details (Traditional Mode)
10.4.1.3 Viewing Alarm Information
270
272
10.4.1.3.1 Viewing Alarm Information for All Power Plants
272
10.4.1.3.2 Viewing Alarm Information for the Current Power Plant
(Traditional Mode)
273
10.4.1.3.3 Viewing the Current Device’s Alarm Information
273
10.4.1.4 Viewing Power Plant Report Information
274
10.4.2 Power Plant Management
276
10.4.2.1 Power Plant Creation
276
10.4.2.2 Configuring Power Plant Information
277
10.4.2.3 Power Plant Visitors Management
278
10.4.2.4 Power Plant Photos Management
279
10.4.2.5 Adjusting the Information Displayed on the Power Station
Details Page
280
10.4.2.6 Setting PV Component Layout
281
10.4.2.7 Deleting Power Plant
282
10.4.2.8 Collecting Power Plant
283
10.4.3 Managing the Equipment in the Power Plant
283
10.4.3.1 Additional Equipment
283
10.4.3.2 Editing Device Information
285
10
10.4.3.3 Deleting Device
286
10.4.3.4 Upgrading Device Firmware Version
287
10.4.4 Remote Management Device
10.4.4.1 Setting Energy Storage Inverter Parameters
11 Maintenance
288
289
296
11.1 Power Off the System
296
11.2 Removing the Equipment
298
11.3 Disposing of the Equipment
298
11.4 Routine Maintenance
298
11.5 Fault
300
11.5.1 Viewing Fault/Alarms Information
300
11.5.2 Fault Information and Troubleshooting
300
11.5.2.1 System Failure
301
11.5.2.2 Inverter Troubleshooting
302
11.5.2.3 Battery Fault (LX A5.0-30)
347
11.5.2.4 Battery Fault (GW14.3-BAT-LV-G10)
350
11.5.3 Operation After Fault Clearance
11.5.3.1 Clear AFCI Alarm
353
353
12 Technical Parameters
355
12.1 Inverter Parameters
355
12.2 Battery Technical Data
372
12.2.1 LX A5.0-30
372
11
12.2.2 GW14.3-BAT-LV-G10
374
12.3 Smart Meter Technical Data
375
12.3.1 GM330
375
12.4 Smart Dongle Technical Data
376
12.4.1 WiFi/LAN Kit-20
376
13 Appendix
378
13.1 FAQ
378
13.1.1 How to conduct auxiliary detection for smart meters/CT?
378
13.1.2 How to Upgrade the Device Version
378
13.2 Abbreviations
379
13.3 Explanation of Terms
382
13.4 Battery SN Code Meaning
383
12
1 About This Manual
1.1 Overview
The energy storage system consists of inverter, battery system, and smart meter.
This manual describes the product information, installation, electrical connection,
commissioning, troubleshooting and maintenance of the system. Read through this
manual before installing and operating the products to understand product safety
information and familiarize yourself with functions and features of the product. This
manual is subject to update without notice. For more product details and latest
documents, visit https://en.goodwe.com/.
1.2 Applicable Model
The energy storage system consists the following products:
Product type
Product information
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
Inverter
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
LX A5.0-30
Battery System
GW14.3-BAT-LV-G10
13
Description
Nominal output power:
6.0kW
Nominal output power:
8.0kW
Nominal output power:
10kW
Nominal output power:
12kW
Nominal output power:
15kW
Nominal output power:
20kW
Rated energy 5.12kWh,
supports a maximum of
30 batteries connected in
parallel.
Rated energy of 14.3Wh,
supports a maximum of
16 batteries connected in
parallel.
Product type
Product information
Smart Meter
GM330
Smart Dongle
WiFi/LAN Kit-20
Description
It is a monitoring module
in the energy storage
system which can detect
information such as
operating voltage,
current, and other data in
the system.
In the single inverter
scenario, the system
operation information can
be uploaded to a
monitoring platform
through WiFi or LAN
signals.
1.3 Symbol Definition
DANGER
Indicates a high-level hazard that, if not avoided, will result in death or serious
injury.
WARNING
Indicates a medium-level hazard that, if not avoided, could result in death or
serious injury.
CAUTION
Indicates a low-level hazard that, if not avoided, could result in minor or moderate
injury.
NOTICE
Highlights key information and supplements the texts. Or some skills and methods
to solve product-related problems to save time.
14
2 Safety Precautions
Please strictly follow these safety instructions in the user manual during the
operation.
WARNING
The products are designed and tested strictly to comply with related safety rules.
Follow all the safety instructions and cautions before any operations. Improper
operation might cause personal injury or property damage as the products are
electrical equipment.
2.1 General Safety
NOTICE
• The information in this document is subject to change due to product updates or
other reasons. This document cannot replace the product labels or the safety
precautions unless otherwise specified. All descriptions in the manual are for
guidance only.
• Before installations, read through the user manual to learn about the product
and the precautions.
• All operations should be performed by trained and knowledgeable technicians
who are familiar with local standards and safety regulations.
• Use insulating tools and wear personal protective equipment when operating the
equipment to ensure personal safety. Wear anti-static gloves, wrist strips, and
cloths when touching electronic devices to protect the equipment from damage.
• Unauthorized dismantling or modification may damage the equipment, and the
damage is not covered under the warranty.
• Strictly follow the installation, operation, and configuration instructions in this
manual or the user manual. The manufacturer shall not be liable for equipment
damage or personal injury if you do not follow the instructions. For more
warranty details, please visit https://www.goodwe.com/warrantyrelated.html.
2.2 Personal Requirements
NOTICE
15
• Personnel who install or maintain the equipment must be strictly trained, learn
about safety precautions and correct operations.
• Only qualified professionals or trained personnel are allowed to install, operate,
maintain, and replace the equipment or parts.
2.3 System Safety
DANGER
• Disconnect the upstream switches to power off the equipment before any
electrical connections. Do not work with power on. Otherwise, an electric shock
may occur.
• Install a breaker at the voltage input side of the equipment to prevent personal
injury or equipment damage caused by energized electrical work.
• All operations such as transportation, storage, installation, use and maintenance
shall comply with applicable laws, regulations, standards and specifications.
• Perform electrical connections in compliance with local laws, regulations,
standards and specifications, including cables and component specifications.
• Use the connectors included in the package to connect cables. The manufacturer
shall not be liable for the equipment damage if connectors of other models are
used.
• Ensure all cables are connected correctly, tightly, and securely. Inappropriate
wiring may cause poor connection and damage the equipment.
• The PE cables must be connected and secured properly.
• To protect the equipment and components from damage during transportation,
ensure that the transportation personnel are professionally trained. All
operations during the transportation have to be recorded. The equipment shall
be kept in balance to avoid falling down.
• The equipment is heavy. Please equip the corresponding personnel according to
its weight, so that the equipment does not exceed the maximum weight that the
personnel can carry to avoid personnel injuries.
• Keep the equipment stable to avoid dumping, which can result in equipment
damage and personal injuries.
WARNING
16
• Do not apply mechanical load to terminals, otherwise the terminals may be
damaged.
• If the cable bears too much tension, the connection may be poor. Reserve a
certain length of the cable before connecting it to corresponding ports.
• Tie the cables of the same type together, and place cables of different types at
least 30mm apart. Do not place the cables entangled or crossed.
• Place the cables at least 30mm away from the heating components or heat
sources, otherwise the insulation layer of the cables may be aging or broken due
to high temperature.
2.3.1 PV String Safety
WARNING
• Ensure the PV module frames and the bracket system are securely grounded.
• Ensure the DC cables are connected tightly, securely and correctly. Inappropriate
wiring may cause poor contacts or high impedances, and damage the inverter.
• Measure the positive and negative terminals of the DC cable using a multimeter
to avoid reverse polarity connection. Also, the voltage should be within the
permissible range.
• Measure the DC cable using the multimeter to avoid reverse polarity connection.
Also, the voltage should be under the max DC input voltage. The manufacturer
shall not be liable for the damage caused by reverse connection and extremely
high voltage.
• The PV strings cannot be grounded. Ensure the minimum insulation resistance of
PV string to the ground meets the minimum insulation resistance requirements
before connecting the PV string to the inverter (R=maximum input voltage (V)/
30mA).
• Do not connect the same PV string to multiple inverters at the same time.
Otherwise, the inverters may be damaged.
• PV modules used with inverters must comply with IEC 61730 Class A standard.
2.3.2 Inverter Safety
WARNING
17
• The voltage and frequency at the connecting point should meet the on-grid
requirements.
• Additional protective devices like circuit breakers or fuses are recommended on
the AC side. Specification of the protective device should be at least 1.25 times
the maximum AC output current.
• The arc fault alarms will be cleared automatically if the alarms are triggered less
than 5 times in 24 hours. The inverter will shutdown for protection after the 5th
electric arc fault. The inverter can operate normally after the fault is solved.
• BACK-UP is not recommended if the PV system is not configured with batteries.
Otherwise, there may be a risk of system power outage.
2.3.3 Battery Safety
DANGER
• Keep Power Off before any operations to avoid danger of electric shock.Strictly
follow all safety precautions outlined in this manual and safety labels on the
equipment during the operation.
• Do not disassemble, modify, or replace any part of the battery or the power
control unit without official authorization from the manufacturer.Otherwise, it
will cause electrical shock or damages to the equipment, which shall not be
borne by the manufacturer.
• Do not hit, pull, drag, squeeze or step on the equipment or put the battery into
fire.Otherwise, the battery may explode.
• Do not place the battery in a high temperature environment.Make sure that
there is no direct sunlight and no heat source near the battery.When the ambient
temperature exceeds 60 ℃, it will cause fire.
• Do not use the battery or the power control unit if it is defective, broken, or
damaged.Damaged battery may leak electrolyte.
• Do not move the battery system while it is working.Contact after-sales service if
the battery shall be replaced or added.
• A short circuit in the battery may cause personal injury.The instantaneous high
current caused by a short circuit can release a large amount of energy and may
cause a fire.
WARNING
18
• Factors such as temperature, humidity, weather conditions, etc. may limit the
battery's current and affect its load.
• Contact after-sale service immediately if the battery is not able to be
started.Otherwise, the battery might be damaged permanently.
• Inspect and maintain the battery regularly according to the maintenance
requirements of the battery.
Emergency Measures
• Battery Electrolyte Leakage
If the battery module leaks electrolyte, avoid contact with the leaking liquid or
gas.The electrolyte is corrosive.It will cause skin irritation or chemical burn to the
operator.Anyone contact the leaked substance accidentally has to act/respond as
following:
Breath in the leaked substance: Evacuate from the polluted area, and seek
immediate medical assistance.
Eye contact: Rinse your eyes for at least 15 minutes with clean water and seek
immediate medical assistance.
Skin contact: Thoroughly wash the touch area with soap and clean water, and
seek immediate medical assistance.
Ingestion: Induce vomiting, and seek immediate medical assistance.
○
○
○
○
• Fire
The battery may burn when the ambient temperature exceeds 150℃.Poisonous
and hazardous gas may be released if the battery is on fire.
In the event of a fire, please make sure that the carbon dioxide extinguisher,
Novec1230, or FM-200 is nearby.
The fire cannot be put out by ABC dry powder extinguisher.Firefighters are
required to wear full protective clothing and self-contained breathing apparatus.
• Battery Triggers Fire Protection
For batteries with fire protection functions, perform the following operations after
the fire protection function is triggered:
Immediately cut off the main power switch to ensure that no current passes
through the battery system.
Conduct a preliminary inspection of the appearance of the battery to determine
if there is any damage, deformation, leakage, or odor.Check the battery casing,
connectors, and cables.
Use temperature sensors to detect the temperature of the battery and its
○
○
○
○
○
○
19
○
environment, ensuring there is no risk of overheating.
Isolate and label damaged batteries, and handle them properly in accordance
with local regulations.
2.3.4 Smart Meter Safety
WARNING
If the voltage of the power grid fluctuates, resulting in the voltage over 265V. In
this case, long-term overvoltage operation may cause damage to the meter. It is
recommended to add a fuse with a rated current of 0.5A on the voltage input side
of the meter to protect it.
2.4 Safety Symbols and Certification Marks
DANGER
• All labels and warning marks should be visible after the installation. Do not cover,
scrawl, or damage any label on the equipment.
• The following descriptions are for reference only. Please refer to the actual
labeling of the equipment.
No. Symbol
Descriptions
1
Potential risks exist. Wear proper PPE before any
operations.
2
High voltage hazard. High voltage exists. Disconnect all
incoming power and turn off the product before working
on it.
3
High-temperature hazard. Do not touch the product under
operation to avoid being burnt.
4
Operate the equipment properly to avoid explosion.
20
No. Symbol
Descriptions
5
Batteries contain flammable materials, beware of fire.
6
The equipment contains corrosive electrolytes. In case of a
leak in the equipment, avoid contacting the leaked liquid or
gas.
7
Delayed discharge. Wait 5 minutes after power off until the
components are completely discharged.
8
Install the equipment away from fire sources.
9
Keep the equipment away from children.
10
Do not pour with water.
11
Read through the user manual before any operations.
12
Wear PPE during installation, operation and maintaining.
13
Do not dispose of the System as household waste. Deal
with it in compliance with local laws and regulations, or
send it back to the manufacturer.
14
Grounding point.
15
Recycle regeneration mark.
21
No. Symbol
Descriptions
16
CE Mark.
17
TUV mark.
18
RCM mark.
2.5 EU Declaration of Conformity
2.5.1 Equipment with Wireless Communication Modules
The equipment with wireless communication modules sold in the European market
meets the requirements of the following directives:
• Radio Equipment Directive 2014/53/EU (RED)
• Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863
(RoHS)
• Waste Electrical and Electronic Equipment 2012/19/EU
• Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No
1907/2006 (REACH)
2.5.2 Equipment without Wireless Communication Modules (Except
Battery)
The equipment without wireless communication modules sold in the European
market meets the requirements of the following directives:
• Electromagnetic compatibility Directive 2014/30/EU (EMC)
• Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
• Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863
(RoHS)
• Waste Electrical and Electronic Equipment 2012/19/EU
• Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No
1907/2006 (REACH)
22
2.5.3 Battery
The batteries sold in the European market meets the requirements of the following
directives:
• Electromagnetic compatibility Directive 2014/30/EU (EMC)
• Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
• Battery Directive 2006/66/EC and Amending Directive 2013/56/EU
• Waste Electrical and Electronic Equipment 2012/19/EU
• Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No
1907/2006 (REACH)
You can download the EU Declaration of Conformity from our official website at:
https://en.goodwe.com.
23
3 System Introduction
3.1 System Overview
The residential smart inverter solution consists of inverter, battery system, smart
meter, smart dongle, etc.In the PV system, solar energy can be converted to electric
energy for household needs.The IoT devices in the system manage the electrical
equipment and energy consumption in a smart way by recognizing the overall power
consumption and deciding whether the power is to be used by the loads, stored in
batteries, or exported to the grid.
WARNING
• Select the battery model according to the inverter model and the approved
battery list.For battery requirements used in the same system, such as whether
the models can be mixed and matched, and whether the capacities are
consistent, please refer to the corresponding model's battery user manual or
contact the battery manufacturer for relevant requirements.Compatibility
Overview:
https://en.goodwe.com/Ftp/EN/Downloads/User%20Manual/GW_Battery%20Co
mpatibility%20Overview-EN.pdf
• Due to product upgrades or other reasons, the document content may be
updated irregularly.The matching relationship between inverters and IoT
products can refer to:
https://en.goodwe.com/Ftp/EN/Downloads/User%20Manual/GW_Compatibilitylist-of-GoodWe-inverters-and-IoT-products-EN.pdf
Scenario
24
Produc
t Type
Model
Description
Inverter
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
• The inverter is supported to be connected to a
generator or large loads.
• GW6K-ET-L-G10, GW8K-ET-L-G10, GW10K-ET-LG10, GW12K-ET-L-G10, only supports singlechannel battery connection.
• GW15K-ET-L-G10 and GW20K-ET-L-G10 support
dual battery connections.
Battery
System
LX A5.0-30
A maximum of 30 batteries can be connected in
parallel in one system.
GW14.3-BAT-LV-G10
A maximum of 16 batteries can be connected in
parallel in one system.
25
Produc
t Type
Model
Description
Lead Acid Battery
• Supports connection to lead-acid batteries of
AGM, GEL, and Flooded types.
• The number of batteries that can be connected
in series is calculated based on the voltage of
lead-acid batteries, and the total voltage of
batteries connected in series is not allowed to
exceed 60V.
Please select the busbar according to the
charging/discharging capacity of the inverter, the
load size, and the charging/discharging capacity
of the battery in the system.
• BCB-22-WW-0:
used with LX A5.0-30, the battery system
supports a maximum working current of
720A, working power of 36kW, and can be
connected to 6 batteries.
• BCB-32-WW-0:
used with LX A5.0-30, the battery system
supports a maximum working current of
720A, working power of 36kW, and can be
connected to 15 batteries.
When used with GW14.3-BAT-LV-G10, the
battery system supports a maximum working
current of 720A, working power of 36kW, and
can be connected to 16 batteries.
• Others: Please prepare busbar based on actual
system power and current.
○
Busbar
BCB-22-WW-0
BCB-32-WW-0
(Purchase from
GoodWe)
○
○
26
Produc
t Type
Smart
Meter
Model
Description
• Built-in Smart
Meter (shipped
with inverter)
• GM330 (purchase
from GoodWe)
• Built-in electricity meter: Please use the CT
supplied with the box to connect to the
inverter.
CT ratio is 120A: 40mA.
• GM330: Supports purchasing from GOODWE or
third-party, CT ratio requirement: nA/5A
nA: CT primary input current, n ranges from
200 to -5000.
5A: CT secondary output current.
○
○
Smart
Dongle
WiFi/LAN Kit-20
Please use the WiFi/LAN Kit-20 Smart Dongle to
perform local testing of the equipment and
remote monitoring of system operation
information.
Supports SG Ready heat pump connection,
controlling the heat pump via dry contact signals.
Heavy
Load
-
Generat
or
-
1. Large load total power < GEN port maximum
output power
2. Large load power + BACK-UP power < AC
maximum input power (grid)
Generator rated voltage meets inverter GEN port
rated voltage.
27
WARNING
• In microgrid scenarios, the PV open-circuit voltage of the PV storage hybrid
inverter is recommended to be < 0.85*PV maximum input voltage to prevent the
system voltage from becoming too high and triggering overvoltage protection
under adverse conditions.
• If the system is in a high temperature or BMS current limiting situation, it may
cause the battery charging power to be limited, which may lead to high system
voltage triggering over-voltage protection.
• In microgrid scenarios, make sure that the overfrequency derating point of the
On-Grid inverter is the same as that of the hybrid inverter.
• If the On-Grid inverter needs to limit the output power, please connect a
separate meter or CT device.
• Make sure that the overfrequency derating curve of the on-grid inverter is set
according to the following via SolarGo:
End power set to 0% Pn
○
○
Silent time set to 0
○
Power response mode set to off
Microgrid Scenario
In the microgrid scenarios, the on-grid inverter is connected to the GEN port of the
hybrid inverter.
28
Produc
t Type
Hybrid
Inverter
Model
Description
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
• When a hybrid inverter is connected to the GEN
port of a hybrid inverter, the system operates in
microgrid mode.
• GW6K-ET-L-G10, GW8K-ET-L-G10, GW10K-ET-LG10, GW12K-ET-L-G10, only supports singlechannel battery connection.
• GW15K-ET-L-G10 and GW20K-ET-L-G10 support
dual battery connections.
• In the microgrid scenarios, connecting
generators is not supported.
LX A5.0-30
A maximum of 30 batteries can be connected in
parallel in one system.
29
Produc
t Type
Battery
System
Model
Description
GW14.3-BAT-LV-G10
A maximum of 16 batteries can be connected in
parallel in one system.
Lead Acid Battery
• Supports connection to lead-acid batteries of
AGM, GEL, and Flooded types.
• The number of batteries that can be connected
in series is calculated based on the voltage of
lead-acid batteries, and the total voltage of
batteries connected in series is not allowed to
exceed 60V.
Please select the busbar according to the
charging/discharging capacity of the inverter, the
load size, and the charging/discharging capacity
of the battery in the system.
• BCB-22-WW-0:
used with LX A5.0-30, the battery system
supports a maximum working current of
720A, working power of 36kW, and can be
connected to a maximum of 6 inverters, and 6
batteries.
• BCB-32-WW-0:
used with LX A5.0-30, the battery system
supports a maximum working current of
720A, working power of 36kW, and can be
connected to 15 batteries.
When used with GW14.3-BAT-LV-G10, the
battery system supports a maximum working
current of 720A, working power of 36kW, and
can be connected to 16 batteries.
• Others: Please prepare busbar based on actual
system power and current.
○
Busbar
BCB-22-WW-0
BCB-32-WW-0
(purchase from
GoodWe)
○
○
30
Produc
t Type
Smart
Meter
Model
Description
• Built-in Smart
Meter (shipped
with inverter)
• GM330 (purchase
from GoodWe)
• Built-in Smart Meter: Connect the inverter using
the delivered CV.
CT ratio is 120A: 40mA.
• GM330: Supports purchasing from GOODWE or
third-party, CT ratio requirement: nA/5A
nA: CT primary input current, n ranges from
200 to -5000.
5A: CT secondary output current.
○
○
Smart
Dongle
WiFi/LAN Kit-20
Please use the WiFi/LAN Kit-20 Smart Dongle to
perform local testing of the equipment and
remote monitoring of system operation
information.
• It’s recommended to use on-grid inverter sold in
GOODWE, and is supported to use the thirdparty on-grid inverter.
• In microgrid systems, make sure that the rated
output power of the On-Grid inverter ≤ the rated
output power of the hybrid inverter.
• When the microgrid system is in parallel, if
power limitation is required, make sure:
the hybrid inverter should be set in the ongrid power limitation interface of the SolarGo
APP; and the on-grid inverter should be set
according to the actual tools used.
In order to ensure that the on-grid inverters
can continue to generate power, the output
power of the hybrid inverters must be
adjusted in the microgrid mode interface of
the SolarGo APP.
○
On-Grid
Inverter
-
○
Note: The output power control precision of
different on-gird inverters varies.Please set the
on-grid power limit control parameter value
according to the actual situation.
31
3.2 Product Overview
3.2.1 Inverter
Inverters control and optimize the power in PV systems through an integrated
energy management system.The power generated in the PV system can be used by
loads, stored in the battery, output to the utility grid, etc
NOTICE
Inverters with different power ratings may vary in appearance.Please refer to the
actual product for details.
No.
Model
1
2
3
4
5
6
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
Rated Output
Power
6kW
8kW
10kW
12kW
15kW
20kW
32
Rated Output Voltage
400/380, 3L/N/PE
400/380, 3L/N/PE
400/380, 3L/N/PE
400/380, 3L/N/PE
400/380, 3L/N/PE
400/380, 3L/N/PE
Component Introduction
Components
No.
Silk
/
Screen
Description
Printing
1
Indicator
Indicates the operating status of the inverter.
2
LCD
Used to check the parameters of the inverter.
3
Button
Set up the inverter in conjunction with the display
screen.
4
Inverter Box
Bottom Cover
(Optional) Used to install lifting rod.
5
Inverter Lifting
Rod Mounting
Hole
• GW6K-ET-L-G10, GW8K-ET-L-G10, GW10K-ET-L-G10,
GW12K-ET-L-G10 x 3
• GW15K-ET-L-G10, GW20K-ET-L-G10 x 4
33
6
Security Lock
Installation
Hole
(Optional) Used for security locks between mounting
brackets and inverters.
7
Inverter
Mounting Slot
Used for mounting inverters.
8
Grounding
terminal
Used to connect the PE cable.
9
DC Switch
Start or stop DC input.
10
Pressure Relief
Valve
-
11, 22
BACK-UP Port
Connect the AC lines and connect important loads to
the inverter.
12, 17
Communicatio
n Terminal
Connected to communication lines such as load control,
CT, RS485, remote shutdown/emergency shutdown,
DRED (Australia) / RCR (Europe), etc.
Battery DC input cable can be connected..
• GW6K-ET-L-G10, GW8K-ET-L-G10, GW10K-ET-L-G10,
GW12K-ET-L-G10 x 1
• GW15K-ET-L-G10, GW20K-ET-L-G10 x 2
13, 18
Battery Input
Port
14, 19
GEN Port
Used to connect generators, large loads, or gridconnected inverters.
15, 23
ON-GRID Port
To connect the communication cable, which links the
inverter with the utility grid.
Used to connect the PV module DC input cables.
16
PV Input
Terminal
• GW6K-ET-L-G10, GW8K-ET-L-G10 x 2
• GW10K-ET-L-G10, GW12K-ET-L-G10 x 3
• GW15K-ET-L-G10, GW20K-ET-L-G10 x 4
34
• To connect the smart dongle such as WiFi/LAN.
20
Smart Dongle
Terminal
• To connect USB flash drive for local software
upgrading.
• To connect the USB-RS485 cable in Brazil.
21
Cooling Fan
Used to cool the inverter.
Size Information
3.2.2 Battery
The battery system stores and releases electricity based on the requirements of a PV
energy storage system. The input and output ports of the energy storage system are
both high-voltage direct current. The ET LV inverter supports connecting lead-acid
batteries, and the product material of the battery can be obtained from the battery
manufacturer.
3.2.2.1 LX A5.0-30
35
3.2.2.2 GW14.3-BAT-LV-G10
3.2.3 Smart Meter
The smart meter can measure and monitor the data in the photovoltaic energy
storage system, such as voltage, current, frequency, power factor, and power, etc.
36
No.
Model
Applicable scenarios
Order the CT for GM330 from GoodWe or other suppliers.CT
ratio: nA: 5A
1
GM330
• nA: For the primary input current of CT, n ranges from 200 to
5000.
• 5A: CT secondary output current.
37
3.2.4 Smart Dongle
The smart dongle can transmit various power generation data to the remote
monitoring platform, in real time, and can communicate with the SolarGo App to
complete the near-end equipment commissioning.
The WiFi/LAN Kit-20 supports Bluetooth, WiFi, and LAN signal types, and is suitable
for near-end device testing and transmission of device operation information to
remote monitoring systems.
3.3 Supported Grid Types
3.4 System Working Mode
Self-use Mode
38
• Self-use mode is the basic working mode of the system.
• The power generated by the PV system supply the loads in priority; the excess
power will charge the batteries, and then the remaining power will be sold to the
utility grid.When the power generated in the PV system is insufficient, the battery
will supply the loads in priority.If the battery power is insufficient, the load will be
powered by the utility grid.
BACK-UP Mode
• The BACK-UP mode is mainly applied to the scenario where the grid is unstable.
• When the grid is disconnected, the inverter turns to off-grid mode and the battery
will supply power to the BACK-UP loads; when the grid is restored, the inverter
switches to on-grid mode.
• To ensure that the battery SOC is sufficient to maintain normal operation of the
system when it is off grid, the battery will be charged to the backup power SOC
using PV or grid power during on-grid operation.If you need to purchase electricity
from the power grid to charge the battery, please confirm compliance with local
power grid laws and regulations.
39
40
TOU Mode
It is recommended to use TOU mode in scenarios when the peak-valley electricity
price varies a lot.Select TOU mode only when it meets the local laws and regulations.
For example, set the battery to charge mode during Valley period to charge battery
with grid power.And set the battery to discharge mode during Peak period to power
the load with the battery.
41
42
Delayed Charging Mode
• Suitable for areas with on-grid power output restrictions.
• Setting a peak power limit allows the PV power that exceeds the on-grid limit to be
used to charge the battery; or setting a PV charging time period, during which the
PV power is utilized to charge the battery.
43
44
45
Demand Management Model
• It is mainly applicable to industrial and commercial scenarios.
• When the total power consumption of the load exceeds the power quota within a
short period of time, battery discharge can be used to reduce the amount of power
consumption exceeding the quota.
• When the SOC of both battery strings in the inverter falls below the reserved SOC
for demand management, the system purchases electricity from the grid based on
the time period, load electricity consumption, and peak purchase limit.When the
SOC of only one battery string in the inverter falls below the reserved SOC for
demand management, the system purchases electricity from the grid based on
load electricity consumption and the peak purchase limit.
46
47
Off-grid Mode
NOTICE
Please do not operate the energy storage system in pure off-grid mode for long
periods of time, otherwise there is a risk of over-discharge when the battery cannot
be charged in low temperature or low light conditions.
When the power grid fails, the inverter switches to off-grid mode.
• During the day, PV power generation is prioritized for supplying power to loads,
and excess power is used to charge batteries.
• Nighttime battery discharge powers the load to ensure uninterrupted power
supply to the backup load.
48
• Off-grid SOC recovery: After the system goes offline, the battery gradually recovers
to the minimum SOC through photovoltaic power generation or other power
generation methods.
3.5 Features
AFCI
The inverter is equipped with an integrated AFCI circuit protection device for
detecting arc faults (arc fauIt) and quickly cutting off the circuit when detected, thus
preventing electrical fires.
Reasons for the occurrence of electric arcs:
• Damaged connectors in the PV system.
• Wrong connected or broken cables.
49
• Aging connectors and cables.
Troubleshooting:
1. When the inverter detects an arc, the type of barricade can be viewed through the
inverter display or the App.
2. If the inverter triggers a fault less than 5 times in 24 hours, wait 5 minutes and the
machine will automatically resume grid-tied machine protection.After the 5th
electric arc fault, the inverter can operate normally after the fault is solved.For
more details, refer to the SolarGo APP User Manual.
Model
GW6K-ET-L-G10
GW8K-ET-L-G10
Tag
Description
AFCI: F-I-AFPE-1-2-1
F (Full coverage): Full coverage
inverter PV input port
I (Integrated): Integrated into the
inverter
AFPE (arc fault protection equipment):
Combines two types of arc detection
functions, AFD and AFI.
1: A pair of PV input ports (PV+ and
PV-) are connected to a series of PV
input strings.
2: Number of PV input ports detected
by a pull-arc detection sensor
1: Number of AFCI
50
Model
GW10K-ET-L-G10
GW12K-ET-L-G10
Tag
Description
AFCI: F-I-AFPE-1-2/1-2
F (Full coverage): Full coverage
inverter PV input port
I (Integrated): Integrated into the
inverter
AFPE (arc fault protection equipment):
Combines two types of arc detection
functions, AFD and AFI.
1: A pair of PV input ports (PV+ and
PV-) are connected to a series of PV
input strings.
2/1: Number of PV input ports
detected by a pull-arc detection
sensor
2: Number of AFCI
GW15K-ET-L-G10
GW20K-ET-L-G10
F (Full coverage): Full coverage
inverter PV input port
I (Integrated): Integrated into the
inverter
AFPE (arc fault protection equipment):
Combines two types of arc detection
functions, AFD and AFI.
1: A pair of PV input ports (PV+ and
PV-) are connected to a series of PV
input strings.
2: Number of PV input ports detected
by a pull-arc detection sensor
2: Number of AFCI
AFCI: F-I-AFPE-1-2-2
Three-phase Unbalanced Output
Both the on-grid end and the BACK-UP end of the inverter support three-phase
unbalanced output, and each phase can be connected to loads of different power
ratings.The maximum output power per phase for different models is shown in the
table below:
51
No.
Model
Single-phase maximum output
power
1
GW6K-ET-L-G10
4kW
2
GW8K-ET-L-G10
4kW
3
GW10K-ET-L-G10
6kW
3
GW12K-ET-L-G10
6kW
5
GW15K-ET-L-G10
10kW
6
GW20K-ET-L-G10
10kW
Load Control
Inverter dry contact control port to support connection of additional contactors for
controlling loads on or off.Supports domestic loads, heat pumps, etc.
The load control methods are as follows:
• Time Control: Set the time to control the load to turn on or off, and the load will be
automatically turned on or off in the set time period.
• Switch Control: When the control mode is selected as ON, the load will be turned
on; when the control mode is set to OFF, the load will be turned off.
• BACK-UP LOAD CONTROL: The inverter has a built-in relay dry contact control port
to control whether the load is turned off or not via a relay.In off-grid mode, the
load connected to the relay port can be turned off if the overloaded battery SOC
value at the BACK-UP end is detected to be lower than the battery off-grid
protection setting.
Rapid Shutdown (RSD)
In the rapid shutdown system, the transmitter is used in conjunction with a receiver
to achieve the rapid shutdown of the system.The receiver maintains the component
output by receiving signals from the transmitter.The transmitter can be external or
built into the inverter.In the event of an emergency, the component can be shut
down by enabling an external trigger to stop the transmitter.
• External Transmitter
Transmitter Model: GTP-F2L-20, GTP-F2M-20
https://www.goodwe.com/Ftp/Installation-instructions/RSD2.0-transmitter.pdf
Receiver Model: GR-B1F-20, GR-B2F-20
https://en.goodwe.com/Ftp/EN/Downloads/User%20Manual/GW_RSD-20_Quick○
○
52
Installation-Guide-POLY.pdf
• Built-in Transmitter
External trigger device: AC side circuit breaker
○
○
Receiver Model: GR-B1F-20, GR-B2F-20
https://en.goodwe.com/Ftp/EN/Downloads/User%20Manual/GW_RSD-20_QuickInstallation-Guide-POLY.pdf
53
4 Check and Storage
4.1 Check Before Receiving
Check the following items before accept.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and
other signs of equipment damage. Do not unpack the package and contact the
supplier as soon as possible if any damage is found.
2. When removing the GW14.3-BAT-LV-G10 battery, make sure that the packaging
carton is intact. If the packaging is damaged and you need to return or exchange
the product due to quality issues, please contact GoodWe after-sales service or
your dealer to obtain a special packaging box.
3. Check the product model. If the product model is not what you requested, do not
unpack the product and contact the supplier.
4.2 Deliverables
WARNING
Check the deliverables for correct model, complete contents, and intact
appearance. Contact the supplier as soon as possible if any damage is found.
4.2.1 Inverter Deliverables
Component
Description
Component
Description
Inverter x 1
Mounting plate x 1
Expansion screws x 4
Grounding terminal x 4
54
Component
Description
Component
Description
BMS ethernet cable
• GW6K-ET-L-G10,
GW8K-ET-L-G10,
GW10K-ET-L-G10,
GW12K-ET-L-G10 x
1
• GW15K-ET-L-G10、
GW20K-ET-L-G10 x
2
Lead-acid battery
temperature sensor cable x 1
Battery power line tubular
terminal
Lead-acid battery
temperature sensor
cable fixing sticker x
2
• GW6K-ET-L-G10, GW8K-ETL-G10, GW10K-ET-L-G10,
GW12K-ET-L-G10 x 2
• GW15K-ET-L-G10, GW20KET-L-G10 x 4
6PIN communication
terminal x 4
Signal line tubular terminals x
28
GEN tubular terminal
x4
BACK-UP and ON-GRID
tubular terminals x 8
55
Component
Description
Component
Description
PV DC terminal
• GW6K-ET-L-G10, GW8K-ETL-G10 x 2
• GW10K-ET-L-G10, GW12KET-L-G10 x 3
• GW15K-ET-L-G10, GW20KET-L-G10 x 4
CT x 3
(Optional)
• Security lock
mounting bracket
x1
• M5 bolts x 1
M6 hexagon wrench x 1
If you need to install
a security lock,
please contact
GoodWe to purchase
security lock
mounting brackets.
Smart dongle x 1
Documents x 1
4.2.2 Batteries Deliverables
4.2.2.1 LX A5.0-30
56
Componen
t
Description
Component
Description
Battery module x1
Terminal resistor x 1
When connecting to a
third-party busbar, this
terminal resistor needs to
be installed.
• M5 OT terminal x 2:
Recommended for
2
connecting 10mm
cable
• M8 OT terminal x 4:
Recommended for
2
connecting 50mm
cable
• M10 OT terminal x 2:
Recommended for
2
connecting 70mm
cable
M5*12 grounding screw x
2
Bracket x 2
For wall-mounted
installation
M6* 70 Expansion bolts x
4
For wall-mounted
installation
M5*12 grounding screw
x2
For wall-mounted
installation
Line drawing template x 1
For wall-mounted
installation
Battery bracket x 2
(optional)
For floor-mounted
installation
M4*8 screw x 8
For floor-mounted
installation
57
Componen
t
Description
Component
Description
Documents x 1
Negative power line
(optional) x 1
Positive power line
(optional) x 1
Grounding cable (optional)
x1
Communication cable
(optional) x 1
Decorative cover (optional)
x1
4.2.2.2 Battery Deliverables (GW14.3- BAT-LV-G10)
Component
Description
Component
Description
Battery module
x1
Wire cover x 1
Terminal
resistor x 1
Documents x 1
Expansion bolt x
2
Wall locking anti-tip
bracket x 2
Grounding OT
terminal x 1
DC OT connector x 6
M5*16 Internal
cross external
hexagon screw
x7
M10 Expansion bolts
(optional) x 4
58
Wall mount
bracket
(optional) x 1
Hooks (optional) x 4
M5*16 internal
cross external
hexagon
(optional) x 12
4.2.3 Busbar Deliverables
4.2.3.1 BCB-22-WW-0 (Optional)
Component
Description
Component
360A Manifold box x 1
(25--8) OT terminal x 36
(70--10) OT terminal x 6
Description
M6 Expansion bolts x 4
-
-
4.2.3.2 BCB-32-WW-0 (Optional)
Component
Description
Component
360A Manifold box x 1
Description
M6 Expansion bolt x 4
(50--8) OT terminal x 30
(70--10) OT terminal x 6
-
4.2.4 GM330
59
-
Component
Description
Component
Description
Smart meter x1
2 PIN terminal
x1
PIN terminal x 6
7 PIN terminal
x1
Screw driver x 1
Documents x 1
4.3 Storage
NOTICE
[1] The storage time starts from the SN date on the outer packaging of the battery
and requires charging and discharging maintenance after the storage cycle is
exceeded. (Battery maintenance time = SN date + charge/discharge maintenance
cycle). For SN date, refer to SN Code Meaning.
[2] After passing the charging/discharging maintenance, if there is a Maintaining
Label attached to the outer box, then please update the maintenance information
on the Maintaining Label. if there is no Maintaining Label, please record the
maintenance time and SOC of the batteries by yourself and keep the data to
facilitate the keeping of maintenance records.
If the equipment is not to be installed or used immediately, please ensure that the
storage environment meets the following requirements: After the equipment is
stored for a long period of time, it is required to be checked and confirmed by a
professional before it can be used further.
1. If the inverter has been stored for more than two years or has not been in
operation for more than six months after installation, it is recommended to be
inspected and tested by professionals before being put into use.
2. To ensure good electrical performance of the internal electronic components of
the inverter, it is recommended to power it on every 6 months during storage. If it
has not been powered on for more than 6 months, it is recommended to be
inspected and tested by professionals before being put into use.
60
3. In order to protect the performance and service life of the battery, it is
recommended to avoid unused storage for a long period of time. Prolonged
storage may cause deep discharging of the battery, resulting in irreversible
chemical loss, leading to capacity degradation or even complete failure, timely use
is recommended. If the battery needs to be stored for a long period of time, please
maintain it according to the following requirements:
Battery Model
Initial SOC
Range for
Battery
Storage
Recom
mende
d
Storag
e
Tempe
rature
LX A5.0-30
30%~ 40%
0~35℃
GW14.3-BAT-LV-G10
30%~ 40%
0~35℃
Charge and
Discharge
Maintaining
[1]
Period
• -20~0℃, ≤1 month
• 0~35℃, ≤6 months
• -20~35℃, ≤12 months
• 35~45℃, ≤6 months
Battery
Maintenanc
[2]
e Method
Contact the
dealer or the
after-sales
service for
maintenance
mothod.
Packing requirements:
Do not unpack the outer package or throw the desiccant away.
Installation environment requirements:
1. Place the equipment in a cool place where is away from direct sunlight.
2. Store the equipment in a clean place. Make sure the temperature and humidity are
appropriate and there is no condensation. Do not install the equipment if the ports
or terminals are condensed.
3. Keep the equipment away from flammable, explosive, and corrosive matters.
Stacking requirements:
1. The height and direction of the stacking inverter should follow the instructions on
61
the packing box.
2. The inverter must be stacked with caution to prevent them from falling.
62
5 Installation
DANGER
Install and connect the equipment with the deliverables included in the package.
Otherwise, the manufacturer shall not be liable for the damage.
5.1 System Installation and Commissioning Procedure
5.2 Installation Requirements
5.2.1 Installation Environment Requirements
1. Do not install the equipment in a place near flammable, explosive, or corrosive
materials.
2. The temperature and humidity at the installation site should be kept within the
appropriate range.
3. Do not install the equipment in a place that is easy to touch, especially within
63
children’s reach.
4. When the equipment is working, its temperature may exceed 60 ℃. Do not touch
the surface to avoid burn.
5. Install the equipment in a sheltered place to avoid direct sunlight, rain, and snow.
Build a sunshade if it is needed.
6. Direct sunlight, high temperatures, and other adverse environmental conditions
may cause a reduction in the output power of the inverter.
7. The place to install the equipment shall be well-ventilated for heat radiation and
large enough for operations.
8. Check the protection rating of the equipment and ensure that the installation
environment meets the requirements. The inverter, battery system, and smart
dongle can be installed both indoors and outdoors, but the smart meter can only
be installed indoors.
9. Install the equipment at a height that is convenient for operation and
maintenance, electrical connections, and checking indicators and labels.
10. The altitude to install the inverter shall be lower than the maximum working
altitude of the system.
11. Consult the manufacturer before installing the equipment outdoors in salt affected
areas. A salt-affected area refers to the region within 500 meters offshore, and will
be related to the sea wind, precipitation and topography.
12. The length of the DC cable and communication cable between the battery and the
inverter must be less than 3m. Please ensure that the installation distance between
the inverter and the battery meets the cable length requirements.
13. Install the equipment away from electromagnetic interference. If there is any radio
or wireless communication equipment below 30MHz near the equipment, you have
to:
• Inverter: add a multi-turn winding ferrite core at the AC output cable of the
inverter, or add a low-pass EMI filter. Or the distance between the inverter and the
wireless EMI equipment should be more than 30m.
• Other equipment: the distance between the equipment and the wireless EMI
equipment should be more than 30m.
64
NOTICE
• If installed in an environment below 0°C, the battery will not be able to continue
charging to restore energy after being discharged, resulting in undervoltage
protection.
• LX A5.0-30, GW14.3-BAT-LV-G10: Charging temperature range: 0 < T ≤ 55°C;
Discharging temperature range: -20 < T ≤ 55°C
5.2.2 Installation Space Requirements
Reserve enough space for operations and heat dissipation when installing the
system.
65
• CAT5E or higher shielded network cables must be used to install CT, with a
maximum distance of 30 meters.
• RS485 twisted pair shielded cable for communication between the inverter and the
electricity meter, with a maximum distance of up to 100 meters.
5.2.3 Tool Requirements
66
NOTICE
The following tools are recommended when installing the equipment. Use other
auxiliary tools on site if necessary.
Installation Tools
Tool Types
Description
Tool Types
Description
Diagonal pliers
RJ45 crimping tool
Wire stripper
YQK-70 hydraulic
pliers
PV connector tool
Adjustable wrench
A-2546B
Impact drill (drill bits
Φ13mm)
Torque wrench
Rubber hammer
Socket wrench set
M4/M5/M6/M8
Multimeter
Marker
Range≤600V
Heat shrink tube
Heat gun
Cable tie
Vacuum cleaner
67
Tool Types
Description
Tool Types
Description
Lifting handles
PV unlocking tool
Screwdriver
Gland unlocking
tool
Inverter battery cable
crimping tool
HS-95WF
5/8-inch hexagon
wrench
Personal Protective Equipment
Tool Types
Description
Tool Types
Description
Insulating gloves and safety gloves
Dust mask
Goggles
Safety shoes
5.3 Equipment Handling
CAUTION
68
1. Operations such as transportation, turnover, installation and so on must meet
the requirements of the laws and regulations of the country or region where
inverters are installed.
2. Move the equipment to the site before installation. Follow the instructions below
to avoid personal injury or equipment damage.
3. Please equip the corresponding personnel according to its weight, so that the
equipment does not exceed the maximum weight that the personnel can carry to
avoid personnel injuries.
4. Wear safety gloves to avoid personal injury.
5. Keep balance to avoid falling down when moving the equipment.
6. The battery system can be removed from the packaging box using a crane or
hoist and transported to the installation site.
• Crane requirements (GW14.3-BAT-LV-G10): Load capacity ≥ 180 kg
7. When moving equipment using a hoisting method, please use flexible slings or
straps. The lifting rings and ropes for GW14.3-BAT-LV-G10 must meet the
following requirements:
• Suspension Ring: 4 M10 suspension rings, load capacity ≥ 260 kg
• Suspension Rope: 1 suspension rope, rope length ≥ 2.5 m, suspension rope load
capacity ≥ 600 kg
GW14.3-BAT-LV-G10:
69
5.4 Installing the Inverter
CAUTION
• Avoid the water pipes and cables buried in the wall when drilling holes.
• Wear goggles and a dust mask to prevent the dust from being inhaled or
contacting eyes when drilling holes.
• Make sure the inverter is firmly installed in case of falling down.
1. Put the mounting plate on the wall horizontally and mark positions for drilling
holes.
2. Drill holes with hammer drill.
3. Use expansion bolts to fix the mounting plate on the wall.
4. (Optional) Install the lifting handle on the inverter.
5. Install the inverter on the mounting plate. Tighten the nuts to secure the mounting
plate and the inverter.
6. (Optional) Install a security lock.
70
5.5 Installing the Battery System
5.5.1 LX A5.0-30
LX A5.0-30: Stacking installation
NOTICE
Up to 6 batteries can be stacked.
1. Place the battery vertically, and remove the battery handles.
2. Install brackets on the battery, and secure them with screws.
3. Place the battery flat and stack multiple batteries. Ensure that the locating pin is
inserted into the locating hole.
71
LX A5.0-30: Cabinet Installation
NOTICE
• It is recommended to install it in a 19-inch standard cabinet with a length * width
of 600*800mm and above, and the height should be determined based on the
thickness of the battery (133mm) and above.
• For cabinet installation, electrical labels and warning labels need to be attached
to any position of the front panel of the battery (these labels are shipped as
additional accessories).
1. Place the battery on the guide rail of the rack and secure the battery to the rack
with screws from the handle.
72
LX A5.0-30: Wall-mounted Installation
1. Determine the drilling position with installation positioning cardboard and marker
pen.
2. Use an impact drill to drill holes.
3. Install the battery brackets.
4. Install the battery on the brackets and use screws to secure the battery.
73
5.5.2 GW14.3-BAT-LV-G10
NOTICE
• Wall mounting requires two people.
GW14.3-BAT-LV-G10: Floor-mounted installation
74
GW14.3-BAT-LV-G10: Wall-mounted Installation
5.6 Installing the Smart Meter
75
WARNING
In areas at risk of lightning, if the meter cable exceeds 10m and the cables are not
wired with grounded metal conduits, you are recommended to use an external
lightning protection device.
GM330
76
6 System Wirings
DANGER
• The erection, routing, and connection of cables must be in compliance with local
laws and regulations.
• Perform electrical connections in compliance with local laws and regulations,
including operations, cables, and component specifications.
• Disconnect the DC switches and the AC output switches to power off the
equipment before any electrical connections.Do not work with power
on.Otherwise, an electric shock may occur.
• Tie the same type cables together, and place them separately from cables of
different types.Do not place the cables entangled or crossed.
• If the cable bears too much tension, the connection may be poor.Reserve a
certain length of the cable before connecting it to the inverter cable port.
• Make sure that the cable conductor is in full contact with the terminal and the
cable insulation part is not crimped with the terminal when crimping the
terminal.Otherwise, the device may not be able to work properly, or the
connection may be unreliable during working, which may cause terminal block
damage, etc.
NOTICE
• Wear personal protective equipment like safety shoes, safety gloves, and
insulating gloves during electrical connections.
• All electrical connections should be performed by qualified professionals.
• Cable colors in this document are for reference only.The cable specifications shall
meet local laws and regulations.
6.1 System Wiring Electrical Block Diagram
77
NOTICE
• N and PE wiring of ON-GRID and BACK-UP ports of the inverter are different
according to the regulation requirements of different regions.Refer to the
specific requirements of local regulations.
• The inverter has a built-in electric meter that can be directly connected to a CT
for use.The CT cable supplied with the box is 10 meters long.If a longer cable is
required, a shielded cable that complies with local regulations can be used to
extend the cable to 30 meters.
• When the length of the connection between the CT and the inverter exceeds 30
m, accuracy will decrease.If high accuracy is required, an external smart meter
can be connected.
• The ON-GRID and GEN AC ports of the inverter have built-in relays.When the
inverter is in off-grid mode, the built-in ON_GRID state relay is disconnected;
when the inverter is in on-grid operation mode, the built-in ON-GRID relay is
connected.
• When the inverter is powered on, the BACK-UP AC port is energized.Power off
the inverter first if maintenance is required on the BACK-UP loads.Otherwise, it
may cause electric shock.
N and PE cables are connected together in the Main Panel
NOTICE
• To maintain neutral integrity, the neutral lines on the grid-connected side and
the off-grid side must be connected together, otherwise the off-grid function will
not work properly.
• The figure below shows a schematic diagram of the power grid systems in
Australia, New Zealand, and other regions:
78
N and PE cables are separately wired in the Main Panel
NOTICE
• Ensure that the grounding of BACK-UP is correctly tightened.Otherwise, the
BACK-UP function may be abnormal in case of grid failure.
• The following diagram is applicable to areas except Australia or New Zealand:
79
6.2 Preparing Materials
WARNING
80
• Do not connect loads between the inverter and the AC switch that is directly
connected to the inverter.
• The inverter must be equipped with an AC output circuit breaker.
• An AC circuit breaker shall be installed on the AC side to make sure that the
inverter can be safely disconnected with the grid when an exception happens.
Select the appropriate AC circuit breaker in compliance with local laws and
regulations.
• When the inverter is powered on, the BACK-UP AC port is energized. Power off
the inverter first if maintenance is required on the BACK-UP loads. Otherwise, it
may cause electric shock.
• For cables used in the system, it is recommended that the conductor material,
cross sectional area, length, etc. of the cables should be consistent.
The power cable between inverter and battery
○
○
The power cable between batteries
○
The power cable between inverter and busbar
○
The power cable between battery and busbar
6.2.1 Preparing Breakers
No.
1
Circuit
breaker
• ON-GRID
circuit
breaker
• BACK-UP
load
breaker
Recommended specifications
Acquisit
ion
method
Some recommended backup
power scenarios are as follows:
Nominal Voltage≥230Vac
The rated current requirements
are as follows:
GW6K-ET-L-G10: 20A
GW8K-ET-L-G10: 20A
GW10K-ET-L-G10: 20A
GW12K-ET-L-G10: 32A
GW15K-ET-L-G10: 63A
GW20K-ET-L-G10: 63A
81
Prepare
d by
custome
rs.
Comment
No.
2
3
4
Circuit
breaker
• ON-GRID
circuit
breaker
• BACK-UP
load
breaker
Recommended specifications
The following are recommended
scenarios for whole-house
backup power supply:
Nominal Voltage≥230Vac
The rated current requirements
are as follows:
GW6K-ET-L-G10: 63A
GW8K-ET-L-G10: 63A
GW10K-ET-L-G10: 63A
GW12K-ET-L-G10: 63A
GW15K-ET-L-G10: 125A
GW20K-ET-L-G10: 125A
Acquisit
ion
method
When
selecting a
circuit breaker
, you can
also choose
Prepare
one that
d by
meets local
custome
installation
rs.
regulations
based on the
actual working
current.
GEN breaker
Nominal Voltage≥230Vac
The rated current requirements
are as follows: 63A for all power
segments.
Prepare
d by
custome
rs.
Battery
breaker
Optional in compliance with
local laws and regulations
Nominal Voltage≥60Vdc
The rated current requirements
are as follows:
GW6K-ET-L-G10: ≥200A
GW8K-ET-L-G10: ≥200A
GW10K-ET-L-G10: ≥250A
GW12K-ET-L-G10: ≥300A
GW15K-ET-L-G10: ≥200A× 2
GW20K-ET-L-G10: ≥300A× 2
Prepare
d by
custom
ers.
82
Comment
No.
Circuit
breaker
Recommended specifications
Select and configure in
accordance with local laws and
regulations.
5
RCD
• Type A
• ON-GRID RCD: 300mA
Acquisit
ion
method
Comment
Prepare
d by
custome
rs.
-
• BACK-UP RCD: 30mA
6.2.2 Preparing Cables
No.
1
2
Cable
Recommended
specifications
Acquisition
method
Comment
Inverter PE
cable
• Single-core outdoor
copper cable
• Conductor cross-sectional
area: 16mm2
• Outer diameter: 7.5mm-9.0mm
Prepared by
customers.
-
Prepared by
customers.
LX A5.0-30:
Supports
purchase
from GoodWe
-
Battery PE
cable
• Single-core outdoor
copper cable
• Conductor cross-sectional
area:
• LX A5.0-30: 10mm²
• GW14.3-BAT-LV-G10:
10mm²
83
No.
3
Cable
Recommended
specifications
Acquisition
method
Comment
PV DC cable
• Commonly used outdoor
photovoltaic cable
• Conductor cross-sectional
area: 4 -6mm²
• Outer diameter: 5.9mm-8.8mm
Prepared by
customers.
-
Battery DC
cable
• Single-core outdoor
copper cable
• Wiring requirements for
inverter battery ports:
Conductor crosssectional area: 70mm²
• Requirements for cables
between battery and
busbar:
LX A5.0-30, cross
sectional area of
conductor: 50mm2
GW14.3-BAT-LV-G10,
conductor crosssectional area: 70 mm²
• Requirements for cables
between batteries:
LX A5.0-30, cross
sectional area of
conductor: 50mm2
GW14.3-BAT-LV-G10,
conductor crosssectional area: 70 mm²
• Prepared by
customers.
• LX A5.0-30:
Supports
purchase
from
GoodWe
-
○
○
4
○
○
○
84
No.
Cable
Recommended
specifications
AC cable
• AC input and output
cables of inverter (BACKUP/ON-GRID):
Conductor crosssectional area: 16mm²
Outer diameter of
multi-core outdoor
copper cable: 25mm-32mm
• Generator power cable
(GEN):
Conductor crosssectional area: 10mm²
Multi-core outdoor
copper cable outer
diameter: 18mm-22mm
Acquisition
method
Comment
Prepared by
customers.
When
selecting
wire gauges,
you can also
choose wire
gauges that
comply with
local
installation
regulations
based on the
actual
working
current.
Prepared by
customers.
-
Shipped with
inverter.
If you need
to provide
your own
equipment,
we
recommend
using CAT 5E
or higher
standard
network
cables and
RJ45
connectors.
○
○
5
○
○
6
Smart meter
power cable
Battery BMS
communicatio
n cable
• Outdoor copper cable
• Conductor cross-sectional
area: 1mm²
Customized communication
cable, default length is 3m.
7
85
No.
Cable
Recommended
specifications
Communication between
the combiner box and the
battery, as well as between
batteries, requires the use
of CAT 5E or higher
specification standard
shielded Ethernet cables
and RJ45 shielded
connectors.
Acquisition
method
Comment
• Prepared by
customers.
• LX A5.0-30:
Supports
purchase
from
GoodWe
-
8
Battery
communicatio
n cable
9
WiFi/LAN Kit20
Communicatio
ns
CAT 5E and above standard
shielded network cable and
RJ45 shielded connector
Prepared by
customers.
-
10
CT
communicatio
n cable
• Shielded cable that meets
local standards
• Conductor cross-sectional
area: 0.2mm²--0.4mm²
• Outer diameter: 5mm-8mm
Prepared by
customers.
-
11
EMS RS485
communicatio
n cable
Prepared by
customers.
-
12
Smart meter
RS485
communicatio
n cable
• Shielded twisted pair
cable
• Conductor cross-sectional
area: 0.2mm²--0.4mm²
13
Load control
and generator
control
communicatio
n line
Prepared by
customers.
-
86
No.
Cable
14
Remote
shutdown
communicatio
n line
Rapid
shutdown
communicatio
n line
NS Protection
communicatio
n line
15
RCR/DRED
signal line
Recommended
specifications
Acquisition
method
• Shielded cable that meets
local standards
• Conductor cross-sectional
area: 0.2mm²--0.4mm²
• Outer diameter: 5mm-8mm
Comment
-
-
6.3 Removing Inverter Box Bottom Cover
6.4 Detailed System Wiring Diagram
When all loads in a photovoltaic system are unable to consume the electricity
generated by the system, the remaining electricity is fed into the grid.At this point,
you can use a smart meter or CT monitoring system to monitor power generation
and control the amount of power fed into the grid.
• Connecting to a smart meter enables the functions of output power limitation and
load monitoring.
87
• Please enable the "Grid-connected Power Limitation" function through the SolarGo
App.
The system wiring diagram only shows wiring diagrams for some models.Please
refer to the corresponding wiring instructions for the equipment you are actually
using.
NOTICE
• The GM330 smart meter is available as an option.Please contact GoodWe to
purchase if required.
• When using GM330 smart meter, do not connect the CT port of the inverter.
Scenario
With built-in smart meter
Use GM330 in the system
88
Microgrid Scenario
In microgrid scenario, If the grid-tied PV inverter needs to limit the output power,
please connect a separate meter or CT device.
With built-in smart meter
89
Use GM330 smart meter in the system
90
6.5 Connecting the PE cable
WARNING
• The PE cable connected to the enclosure of the inverter cannot replace the PE
cable connected to the AC output port. Make sure that both of the two PE cables
are securely connected.
• To improve the corrosion resistance of the terminal, you are recommended to
apply silica gel or paint on the ground terminal after installing the PE cable.
• Connect the PE cable first before installing the equipment. Disconnect the PE
cable before dismantling the equipment.
Inverter
91
Battery (GW14.3-BAT-LV-G10)
Battery (LX A5.0-30)
6.6 Connecting the AC Cable
WARNING
92
• The residual current monitoring unit (RCMU) is integrated into the inverter to
avoid that the residual current exceeds the limit. The inverter will disconnect with
the utility grid quickly once it found the residual current exceeds the limit.
• When connecting the wires, make sure that the AC wires are connected to the AC
terminals labeled “BACK-UP,” “ON-GRID,” “GEN,” and the ground port. Incorrect
cable connections will damage the equipment.
• Ensure that the whole cable cores are inserted into the terminal holes, and no
part of the cable core can be exposed.
• Ensure that the insulation board is inserted into the AC terminal tightly.
• Ensure that the cables are connected securely. Otherwise it will cause damage to
the inverter due to overheat during its operation.
93
6.7 Connecting the PV Cable
DANGER
94
• Do not connect the same PV string to multiple inverters at the same time.
Otherwise, the inverters may be damaged.
• Confirm the following information before connecting the PV string to the
inverter. Otherwise, the inverter may be damaged permanently or even cause
fire and cause personal and property losses.
1. Make sure that the max short circuit current and the maximum input voltage
per MPPT are within the permissible range.
2. Make sure that the positive pole of the PV string connects to the PV+ of the
inverter. And the negative pole of the PV string connects to the PV- of the
inverter.
WARNING
• The PV strings cannot be grounded. Ensure the minimum insulation resistance of
PV string to the ground meets the minimum insulation resistance requirements
before connecting the PV string to the inverter (R=maximum input voltage/
30mA).
• Ensure the DC cables are connected tightly, securely and correctly.
• Measure the positive and negative terminals of the DC cable using a multimeter
to avoid reverse polarity connection. Also, the voltage should be within the
permissible range.
NOTICE
The two input strings per MPPT should contain the same number of identical PV
modules with the same tilt and angle to ensure the best efficiency.
95
6.8 Connecting the Battery Cable
DANGER
• In a single inverter system, do not connect the same battery pack to multiple
inverters, which may cause inverter damage.
• It is forbidden to connect loads between the inverter and the battery.
• When connecting battery cables, use insulated tools to prevent accidental electric
shock or short circuit to the batteries.
• Ensure that the open circuit voltage of the battery is within the permissible range
of the inverter.
• Install a DC breaker between the inverter and the battery in compliance with
local laws and regulations.
• The battery supports connection to GoodWe busbars and third-party busbars. If
you need to use a third-party busbar, please replace the terminal resistor with
the black terminal resistor provided in the box.
96
NOTICE
The inverter supports a maximum of 15 batteries connected in parallel on a single
circuit. If you require more batteries to be connected in parallel, please contact the
GoodWe After-Sales Service Center.
97
Instructions for BMS communication connection between inverter and battery
Connected to
the battery
port
Inverter
port
BMS1/BMS2 COM1
Port
definition
Description
4: CAN_H
5: CAN_L
• The inverter communicates with the
battery through CAN.
• Connect the BMS port of the
inverter to the COM1 port of the
battery.
LX A5.0-30 Communication Port Definition
PIN
COM1
COM2
Description
1
-
-
2
-
-
3
Parallel OUT+
Parallel OUT+
Parallel operation communication port
4
CAN_1H
CAN_1H
5
CAN_1L
CAN_1L
Connect the inverter communication port
or battery parallel communication port
6
Parallel
OUT2+
Parallel OUT2+
7
-
-
8
Parallel OUT-
Parallel OUT-
Reserved
Parallel interlock communication port
Reserved
Parallel operation communication port
GW14.3-BAT-LV-G10 Communication Port Definition
PIN
COM1
COM2
Description
1
RS485A
RS485A
2
RS485B-
RS485B-
3
Parallel OUT+
Parallel OUT+
Parallel operation communication port
4
CAN_H
CAN_H
5
CAN_L
CAN_L
Connect the inverter communication
port or battery parallel communication
port
6
Parallel OUT2+
7
-
8
Parallel OUT-
Reserved
Parallel OUT2+ Parallel operation communication port
-
Reserved
Parallel OUT98
Parallel operation communication port
Battery system wiring diagram
99
100
LX A5.0-30: When connecting the battery to a single 1-way output inverter.
Type I:
101
Type II:
102
LX A5.0-30: When connecting the battery to a single 2-way output inverter.
103
LXA5.0-30: When connecting two output inverters using the BCB-22-WW-0 busbar
connection method.
104
LX A5.0-30: When connecting two output inverters using the BCB-32-WW-0 busbar
connection method.
105
LXA5.0-30: When connecting two output inverters using a third-party bus connection
method.
106
GW14.3-BAT-LV-G10: When connecting the battery to a single 1-way output inverter.
Type I:
107
Type II:
108
GW14.3-BAT-LV-G10: When connecting the battery to a single 2-way output inverter.
Type I:
109
Type II:
110
GW14.3-BAT-LV-G10: When connecting two batteries to a single 2-way output
inverter.
111
GW14.3-BAT-LV-G10: When connecting two output inverters using a busbar (BCB-32WW-0).
112
GW14.3-BAT-LV-G10: When connecting two output inverters using a third-party
busbar.
113
GW14.3-BAT-LV-G10, LXA5.0-30: Battery connected to a single 2-way output inverter.
114
6.8.1 Connecting the Power Cable between the Inverter and Battery
WARNING
115
• Measure the positive and negative terminals of the DC cable using a multimeter
to avoid reverse polarity connection. Also, the voltage should be within the
permissible range.
• Connect the battery cables to the corresponding terminals such BAT+, BAT- and
grounding ports correctly. Otherwise it will cause damage to the equipment.
• Ensure that the whole cable cores are inserted into the terminal holes, and no
part of the cable core can be exposed.
• Ensure that the cables are connected securely. Otherwise it will cause damage to
the inverter due to overheat during its operation.
• Do not connect one battery pack to more than one inverter at the same time.
Otherwise, it may cause damage to the inverter.
Overview of inverter and battery power cable
Making the inverter power cable
116
Method for manufacturing battery and combiner box end cables (LX A5.0-30)
Method for manufacturing battery and combiner box end cables (GW14.3-BATLV-G10)
117
6.8.2 Connecting the Communication Cable between the Inverter
and Battery
NOTICE
It is recommended to use the included BMS communication cable in the package of
the inverter. If the included communication cables do not meet the requirement,
prepare shielded network cables and RJ connectors by yourself to make the cable.
Only crimp PIN4 and PIN5 of the connector when making the cable, otherwise the
communication may fail.
Connection diagram for inverter BMS1 communication:
118
Inverters BMS1 and BMS2 are both connected for communication, as shown in the
diagram:
119
NOTICE
• When connecting the lead-acid battery temperature sensor cable, it is
recommended to connect the temperature sensor cable at a location with poor
heat dissipation. For example, when lead-acid batteries are placed side by side,
the sensor should be fixed on the lead-acid battery located in the middle.
• To better protect the battery cell, a temperature sampling cable must be
installed, and it is recommended to place the battery in a well-ventilated
environment.
Lead-acid battery communication diagram:
120
6.9 Connecting the Meter Cable
NOTICE
• Ensure that the CT is connected in the correct direction and phase sequences,
otherwise the monitoring data will be incorrect.
• Ensure all cables are connected correctly, tightly, and securely. Inappropriate
wiring may cause poor contacts and damage the equipment.
• In areas at risk of lightning, if the meter cable exceeds 10m and the cables are
not wired with grounded metal conduits, you are recommended to use an
external lightning protection device.
• Outer diameter of the AC cable should be smaller than the holes diameter of the
CT, so that the AC cable can be threaded through the CT.
• To ensure accurate current detection, the CT cable is recommended to be shorter
than 30m.
• Do not use network cable as the CT cable, otherwise the smart meter may be
damaged due to high current.
• The CTs vary slightly in dimensions and appearance among different models, but
they are installed and connected in the same way.
Wiring of GM330
121
Connection steps
Installing the CT (Type I)
Installing the CT (Type II)
122
6.10 Connecting the Inverter Communication Cable
123
NOTICE
• During initial installation, there is no need to pay attention to the direction of the
CT sampling current. When replacing or maintaining the CT later, please use the
meter/CT-assisted detection function on the SolarGo App to allow the inverter
to readjust to the direction of the CT sampling current.
• The communication functions are optional. Connect the cables based on actual
needs.
• When using the built-in smart meter, use the CT shipped with the box.
• The inverter supports parameter setting via Bluetooth nearby. It also supports
connecting to mobile phones or WEB interfaces through communication
modules such as WiFi and LAN to set device-related parameters, view device
operation information and error messages, and keep abreast of the system
status in a timely manner.
• If you need to use the DRED, RCR or remote shutdown function, turn it on in the
SolarGo App after wiring.
• Do not turn on the remote shutdown function in the SolarGo App if the inverter
is not connected to a remote shutdown device, otherwise the inverter will be
unable to operate in parallel.
• Do not turn on the remote shutdown function in the SolarGo App if the inverter
is not connected to the DRED device or a remote shutdown device, otherwise the
inverter will be unable to operate in parallel.
• To ensure the waterproof rating of the inverter, please do not remove the
waterproof plugs from unused communication ports on the inverter.
• The inverter parallel connection DIP switch is set to the ON position by default at
the factory.
• Inverter DO signal communication port, which can be connected to dry contact
signal specifications: Max ≤ 24 Vdc, 1A.
124
Communication Description
Port
Function
PAR1/PAR2
Parallel operation
communication
port 1/2
Reserved
Battery BMS
Communications
When connected to a lithium-ion battery, it is
used to connect the battery system BMS
communication line and supports the use of
CAN signal communication.
BMS 1
BMS 2
Description
125
Port
CT
DI
LOAD
Function
CT connection
port
When using only the inverter's built-in meter,
connect the CT communication cable.
Remote
shutdown/NS
protection/Fast
shutdown
• External remote shutdown or local NS
protection device, disabled by default.
• In the rapid shutdown system, the
transmitter is used in conjunction with a
receiver to achieve the rapid shutdown of
the system. The receiver maintains the
component output by receiving signals from
the transmitter. The transmitter can be
external or built into the inverter. In the
event of an emergency, the component can
be shut down by enabling an external
trigger to stop the transmitter.
Load control
• It supports connection with dry contact
signals to achieve functions such as load
control. The capacity of the DO contact is
12V DC@1A. NO/COM is a Normally Open
contact.
• It supports the connection of SG Ready heat
pumps and controls the heat pumps
through dry contact signals.
Generator control
port
GEN
EMS
METER
BAT-T
Description
EMS
Meter connection
port (Meter)
Lead-acid
temperature
sampling port
Supports connection to generator control
signals to control generator start-up and
shutdown.
Microgrids do not support connecting
generators.
Connect to external third-party devices for
energy control.
Connecting to external smart meters through
RS485 communication.
Used to connect temperature sensing wire to
lead-acid temperature measurement.
126
Port
DRM/RCR
Function
RCR or DRED
functional
connection port
Description
• RCR (Ripple Control Receiver): It provides an
RCR signal control port to meet the grid
dispatching requirements in Europe.
• DRED (Demand Response Enabling Device):
Provides a DRED signal control port that
meets DERD certification requirements in
Australia and other regions.
Connecting the communication cable
6.11 Installing Inverter Box Bottom Cover
127
6.12 Installing the Battery Cover
6.12.1 LX A5.0-30
6.12.2 GW14.3-BAT-LV-G10
128
129
7 System Commissioning
7.1 Check Before Power ON
No.
Check Item
1
The inverter is firmly installed in a clean place where is well-ventilated and
easy to operate.
2
Ensure that the ground wire, DC wire, AC wire, communication wire, and
terminal resistor are connected correctly and securely.
3
Cable ties are intact, routed properly and evenly.
4
Unused wire holes and ports should be sealed up.
5
The used cable holes are sealed.
6
The voltage and frequency at the connection point meet the inverter grid
connection requirements.
7.2 Power ON
WARNING
• Battery black start function: When there is no PV power generation in the
photovoltaic system and the grid is abnormal, if the inverter cannot operate
normally, the battery black start function can be used to force the battery to
discharge and start the inverter. The inverter can then enter off-grid mode and
operate, with the battery supplying power to the load.
• After the battery system is started, please ensure that the communication
between the inverter and the battery system is normal within 15 minutes. If the
inverter cannot communicate with the battery system, the battery system
breaker will be disconnected automatically, and the battery system will be
powered off.
• When multiple batteries are connected in parallel in the system, starting any one
battery will start all batteries. GW14.3-BAT-LV-G10: After the battery is powered
off and then powered on again, each battery must be restarted individually, or
any battery can be started after waiting 15 minutes, and all batteries will start.
Power on
130
1. Turn on the BACK-UP circuit breaker.
2. Turn on the BACK-UP circuit breaker.
3. (Optional) Turn on the GEN circuit breaker.
4. (Selected in accordance with local laws and regulations) Turn on the switch
between the inverter and the battery.
5. Start the battery system.
131
a. Only GW14.3-BAT-LV-G10: Turn on the battery system switch and press the
multifunction button for less than 1 second.
b. LX A5.0-30: Press the multifunction button for less than or equal to 2 seconds.
6. Turn on the DC switch of the inverter.
7.3 Indicators
7.3.1 Inverter Indicators
Indicat
or
Status
Description
The inverter is starting up and in the self-check mode.
The inverter is powered on and in the standby mode.
BACK-UP output overload.
System failure.
LCD ON: The inverter is powered on and in the standby
mode.
LCD OFF: The inverter is powered off.
The grid is abnormal, and the power supply to the BACK-UP
port of the inverter is normal.
The grid is normal, and the power supply to the BACK-UP
port of the inverter is normal.
The BACK-UP port has no power supply.
The monitoring module of the inverter is resetting.
The inverter fails to connect with the communication
termination.
Communication fault between the communication
termination and server.
132
Indicat
or
Status
Description
The monitoring of the inverter operates well.
The monitoring module of the inverter has not been started
yet.
7.3.2 Battery Indicators
7.3.2.1 LX A5.0-30
RUN light
Indicator
No SOC indicator
shows green.
The first SOC
indicator shows
green.
The first two SOC
indicators are
green.
The first three SOC
indicators are
green.
All SOC indicators
are green.
Green light is on.
Green light flashes 1
time/s.
Green light flashes 3
time/s.
Green flashes
slowly.
ALM Light
Red light is on.
System Status
SOC=0%
0%<SOC≤25%
0%<SOC≤25%
0%<SOC≤25%
0%<SOC≤25%
The battery system is working normally.
The battery system is in the standby
mode.
The PCS communication is lost.
The battery system gives an alarm, and
conducts a self-check. After the selfchecking is over, it will change to normal
working status or fault status.
Check the SOC indicator status to identify
the fault type and handle the problem as
recommended in the Troubleshooting
section.
7.3.2.2 GW14.3-BAT-LV-G10
133
Normal status
Indicat
or
Name
Corresponding to
Other Light
Statuses
Indicator Status
SOC=0%
0%<SOC≤25%
SOC
indicator
shows
green.
SOC
Indicat
or
Operatio
n
Indicato
r Light +
Touch
Button
System Status
0%<SOC≤25%
0%<SOC≤25%
0%<SOC≤25%
/
SOC
indicator
shows
green.
The battery system is in
discharging status.
White
light is on.
The system is working
normally.
Blue-purple breathing
light
134
Indicat
or
Name
Corresponding to
Other Light
Statuses
Indicator Status
White
light
flashes.
System Status
The system is preparing.
Blue-purple marquee
Commu
nication
Light
White
/
light is on.
PCS communication
normal
Abnormal status
Indicat
or
name
SOC
Indicat
or
Corresponding to
other light statuses
Indicator status
SOC
indicator
shows
green.
Red
light flashes.
Power Off
System Status
Check the SOC
indicator status to
identify the fault type
and handle the
problem as
recommended in the
Troubleshooting
section.
Red light is on.
Commu
nication
Light
The PCS
communication is lost.
Power Off /
135
Indicat
or
name
Corresponding to
other light statuses
Indicator status
System
Alarm
Light
System Status
System alarms.
Undervoltage faults 2,
3, and 4
White
/
light is on.
7.3.3 Smart Meter Indicator
GM330
Type
Power light
Communication
indicator
Importing or
exporting
indicator
Status
Description
Power on, no RS485 communication.
Power on, RS485 communication works
properly.
The smart meter has been powered off.
Reserved
On
Blinks.
Off
Off
Blinks.
Press the Reset button for more than 5
seconds, power light, buying or selling
electricity indicator light flash: Reset the meter.
On
Blinks.
Importing from the grid.
Exporting to the grid.
Off
Do not import from and export to the grid.
Reserved
7.3.4 Smart Dongle Indicator
• WiFi/LAN Kit-20
Indicator
Power
light
Status
Description
On: The smart dongle has been powered on.
Power Off: The smart dongle is not powered on.
136
Indicator
Status
Description
On: Communication in WiFi mode or LAN mode
is normal.
Blinks 1 time: The smart dongle Bluetooth has
been turned on, and is waiting for connecting to
the SolarGo App.
Blinks 2 times: The smart dongle is not
connected to the router.
Blinks 4 times: The smart dongle is
communicating normally with the router, but
has not been connected to the server.
Blinks 6 times: The smart dongle is recognizing
the connected device.
Off: The software of the smart dongle is
resetting or is not powered on.
Communi
cation
indicator
Indicator
Color
Status
On
Description
The 100Mbps wired network is normally
connected.
• The Ethernet cable is not connected.
Communic
ation
indicator in
LAN Port
Green
Off
On
Yellow
Blinks.
Off
Button
Reload
• Fail to connect the 100Mbps wired
network.
• The 10Mbps wired network is normally
connected.
The 10/100Mbps wired network is
normally connected, but no
communication data is received or
transmitted.
The communication data is being
transmitted or received.
The Ethernet cable is not connected.
Description
Press and hold for 0.5 to 3 seconds to reset the Smart Dongle.
Press and hold for 6 to 20 seconds to restore the Smart Dongle
to factory settings.
137
8 Rapid System Configuration
8.1 Downloading the App
8.1.1 Downloading SolarGo App
Make sure that the mobile phone meets the following requirements:
• Mobile phone operating system: Android 5.0 or later, iOS 13.0 or later.
• The mobile phone can access the Internet.
• The mobile phone supports WLAN or Bluetooth.
NOTICE
Once the SolarGo App has been installed, you will receive automatic notifications
when updates are available.
Method 1: Search SolarGo in Google Play (Android) or App Store (iOS) to download
and install the app.
Method 2: Scan the QR code below to download and install the App.
8.1.2 Downloading SEMS+ APP
Make sure that the mobile phone meets the following requirements:
• Mobile phone operating system: Android 6.0 or later, iOS 13.0 or later.
• The mobile phone can access the Internet.
• The mobile phone supports WLAN or Bluetooth.
138
Download Method:
Method 1:
Search SEMS+ in Google Play (Android) or App Store (iOS) to download and install the
App.
Method 2:
Scan the QR code below to download and install the App.
8.2 Connecting the Energy Storage Inverter
Step 1: Confirm that the inverter is powered on and that both the communication
module and the inverter are operating normally.
Step 2: Depending on the type of communication module, select the Bluetooth or
WLAN tab on the SolarGo App home page.
Step 3 (Optional): If you choose to connect the device via WiFi, first open your
phone's WiFi settings and connect to the inverter's WiFi signal. Default Connection
Password: 12345678.
Step 4: Drag down or click Search Device to refresh the device list, confirm the
inverter signal name based on the inverter serial number, and click the inverter
signal name to enter the login interface. Select the device by checking the serial
number of the master inverter when multi inverters are parallel connected.
Step 5 (Optional): When connecting the device via Bluetooth for the first time, a
Bluetooth pairing prompt will appear on the interface. Please click Pair to continue
connecting and enter the login interface.
Step 6: Log in to the app using your actual role and change your login password
according to the prompts on the interface. Initial Login Password: 1234.
Step 7: If you connect the inverter via Solar-WiFi***, modify the initial connection
password according to the interface prompts; if you connect the inverter via WLA-***
or WFA-***, modify the initial login password according to the interface prompts.
139
After changing your password, log in again and go to the device details page. Please
refer to the actual prompts on the interface.
Step 8 (Optional): If you connect the inverter via WLA-*** or WFA-***, enable
Bluetooth to remain on according to the interface prompts after entering the device
details page. Otherwise, the Bluetooth signal will be turned off after this connection
ends.
Method 1: Log in via WLAN
NOTICE
• After upgrading the SolarGo app to version V5.6.2 or higher, a pop-up window
will appear prompting you to change your password each time you connect to
the inverter via WLAN. If you wish to permanently close the pop-up window,
please click “Do not show again” when the pop-up window appears.
• If you forget the modified password, please reset the password by resetting the
smart dongle or the inverter LCD screen. Refer to the corresponding inverter or
smart dongle manual for the steps. Resetting the smart dongle to restore the
initial password will cause the smart dongle to be restored to factory settings.
140
Method 2: Log in via Bluetooth
141
8.3 Setting Communication Parameters
142
NOTICE
The communication configuration interface may differ depending on the
communication method used by the inverter or the communication module
connected. Please refer to the actual interface.
8.3.1 Setting Privacy and Security Parameters
Type I:
Step 1: Go to the settings page by selecting Home > Settings > Communication
Settings > Privacy and Security > WLAN Module Password Change.
Step 2: Set the WiFi hotspot password for the new communication module according
to your actual needs, click Save to complete the setup.
Step 3: Open your phone's WiFi settings and connect to the inverter's WiFi signal
using the new password.
143
Type II:
Step 1: Go to the settings page via Home > Settings > Communication Settings >
Privacy and Security.
Step 2: Enable corresponding functions according to actual needs.
144
No.
Parameter
Description
1
Bluetooth
Continuously
Enabled
Disabled by default.After enabling this feature, the
device's Bluetooth will remain on and stay connected to
SolarGo.Otherwise, the device's Bluetooth will turn off
after 5 minutes, disconnecting from SolarGo.
WLAN Control
Disabled by default.After enabling this feature, SolarGo
can connect to the device via WLAN when both are on
the same local area network.Otherwise, even if they are
on the same local area network, they cannot connect.
3
Modbus-TCP
After enabling this feature, third-party platforms can
access the inverter via the Modbus TCP protocol to
perform monitoring functions.
4
SSH control Ezlink
Once this feature is enabled, third-party platforms can
connect to and control EzLink's Linux system.
2
Type III:
Step 1: Go to the settings page via Home > Settings > Communication Settings >
Privacy and Security.
145
Step 2: Enable Bluetooth to remain on and the login password function according
to actual needs.
No.
Parameter
Description
1
Bluetooth
Continuously
Enabled
Disabled by default.After enabling this feature, the
device's Bluetooth will remain on and stay connected to
SolarGo.Otherwise, the device's Bluetooth will turn off
after 5 minutes, disconnecting from SolarGo.
Login Password
Disabled by default.After enabling this feature, the
device will prompt you to enter your login password
when connecting to SolarGo.When using your login
password for the first time, please use the initial
password and change your password according to the
prompts on the screen.
2
8.3.2 Setting WLAN/LAN Parameters
146
NOTICE
The communication configuration interface may vary depending on the type of
smart dongle connected to the inverter. Please refer to the actual interface for
accurate information.
Step 1: Go to the settings page via Home > Settings > Communication Settings >
WLAN/LAN.
Step 2: Configure the WLAN or LAN network based on the actual situation.
No.
Parameter
Description
1
Network Name
Applicable to WLAN. Please select the corresponding
network based on your actual situation and
communicate the device with the router or switch.
2
Password
Applicable to WLAN. Enter the password for the
network you actually selected.
147
No.
Parameter
3
DHCP
4
IP Address
5
Subnet Mask
6
Gateway Address
7
DNS Server
Description
When the router is using the dynamic IP mode, turn
on the DHCP function.
When using the router in static IP mode or using a
switch, turn off the DHCP function.
When DHCP is enabled, there is no need to configure
this parameter.
When DHCP is turned off, please configure this
parameter according to the information of the router
or switch.
8.3.3 Setting RS485 Communication Parameters
NOTICE
Set the host communication address of the inverter. When using a single inverter,
set the communication address according to the actual situation. When connecting
multiple inverters, each inverter must have a different address, and none of the
inverters can be set to communication address 247.
Step1: Enter the setting page through Home > Settings > Communication
Configuration > RS485.
Step 2: Configure the communication address and baud rate according to the actual
situation.
148
8.4 Quick System Setup
NOTICE
• When the inverter model is different, the interface display and parameter
settings will vary. Please refer to the actual product for details.
• When selecting the safety code country/region, the system will automatically
configure the overvoltage and undervoltage protection, overfrequency and
underfrequency protection, inverter on-grid voltage/frequency, connection
slope, Cosφ curve, Q(U) curve, P(U) curve, PF curve, high and low voltage ridethrough, etc. according to the safety regulation requirements of different
regions. For specific parameter values, please set the safety regulations region
first, then check via Home > Settings > Advanced Settings > Safety Regulations
Parameter Settings.
• The generation efficiency of inverter differs in different working modes. Please
set according to the local actual electricity consumption.
Self-generated and self-consumed mode: The basic operating mode of the
system. The power generated by the PV system supply the loads in priority; the
○
149
NOTICE
○
○
○
○
○
excess power will charge the batteries, and then the remaining power will be
sold to the utility grid. When the power generated in the PV system is
insufficient, the battery will supply the loads in priority. If the battery power is
insufficient, the load will be powered by the utility grid.
BACK-UP Mode: The BACK-UP mode is mainly applied to the scenario where
the grid is unstable. When the grid is disconnected, the inverter turns to offgrid mode and the battery will supply power to the BACKUP loads; when the
grid is restored, the inverter switches to grid-tied mode.
TOU Mode: It is recommended to use TOU mode in scenarios when the peakvalley electricity price varies a lot. Select TOU mode only when it meets the
local laws and regulations. Based on actual needs, during off-peak hours, the
battery can be set to charging mode to purchase electricity from the grid for
charging; during peak hours, the battery can be set to discharge mode to
supply power to the load through the battery.
Off-grid mode: Suitable for areas without a power grid. PV and batteries
constitute a pure off-grid system, where PV power generation supplies power
to the load and excess power charges the batteries. When PV power
generation does not meet the load's power demand, the battery supplies
power to the load.
Delayed charging: Suitable for areas with grid connection power output
restrictions. By setting peak power limits and charging time periods,
photovoltaic power generation that exceeds grid connection limits can be used
to charge batteries, reducing photovoltaic waste.
Demand management: Mainly applicable to scenarios where peak power
consumption is limited. When the total power consumption of the load
exceeds the power quota within a short period of time, battery discharge can
be used to reduce the amount of power consumption exceeding the quota.
8.4.1 Quick System Setup (Type II)
Step 1: Go to the parameter settings page via Home > Settings > Quick
Configuration.
Step 2: Enter your login password to access the safety settings interface.Initial
Installation password: goodwe2010 or 1111.
Step 3: Some models support one-click configuration.Select the Configuration
Wizard Mode to quickly configure the system.
150
Step 4: Select the safety standard country based on the country or region where the
inverter is located.After completing the settings, click Next to set the battery
connection mode.
Step 5: Select the battery connection mode based on the actual battery connection
situation.If no battery is connected, the basic parameter settings are complete.If a
battery is connected, click Next after completing the settings to set the battery type.
Step 6: Select the battery model based on the actual battery connection.After
completing the settings click Next to set the working mode.
151
Step 7: Set the working mode according to actual needs.After completing the
settings, click Next to finish configuring the work mode.For certain models, after the
152
operating mode configuration is complete, the system will automatically enter the
CT/electric meter self-check state.At this point, the inverter will temporarily
disconnect from the grid and then automatically reconnect.
Step 8: Select the battery according to the actual situation: initial installation, daily
operation, or replacement installation.
153
154
No.
Parameter
Description
BACK-UP Mode
1
Charging from
Grid
Enabling this function allows the system to purchase
electricity from power grid.
2
Charging Power
The percentage of power purchased compare to the
rated power of the inverter.
TOU Mode
3
Start Time
Within the start and end time, the battery will charge or
discharge based on the set charge-discharge mode and
rated power.
4
End Time
5
Charge and
Discharge
Mode
Set to charge or discharge based on actual needs.
6
Rated Power
The percentage of power during charging or discharging
compared to the rated power of the inverter.
7
Charge Cut-off
SOC
The battery stop charging once the battery SOC reaches
Charge Cut-off SOC.
Peakshaving
Reserved SOC
For
Peakshaving
In Peak Shaving mode, the battery SOC should be lower
than Reserved SOC For Peakshaving.Once the battery
SOC is higher than Reserved SOC For Peakshaving, the
peak shaving mode fails.
9
Peak Power
Purchase Limit
Set the maximum power limit allowed to purchase from
the grid.When the loads consume power exceed the sum
of the power generated in the PV system and Peak
Power Purchase Limit, the excess power will be made up
by the battery.
10
During the period when electricity is purchased for
Time Period for
charging, if the load power consumption does not
Purchasing
exceed the purchased electricity quota, the battery can
Electricity and
be charged through the power grid.Otherwise, only PV
Charging
power can be used to charge the battery.
8
155
No.
Parameter
Description
Delayed Charging Mode
11
Peak Power
Selling Limit
12
PV Prioritizes
Battery
Charging
13
Charging Start
Time
Set peak power limits in accordance with grid standards
in certain countries or regions.The peak power limit must
be lower than the local specified output power limit.
Within the charging time range, photovoltaic power
generation is prioritized for charging the battery.
8.5 Power Plant Creation
Step 1: Click on the home page or power station list page, or click Create Station
on the account page.
Step 2: Based on the actual situation, fill in the relevant information about the power
station in the Create Station interface.
Step 3: Click Save & Exit to complete the power plant creation. At this point, no
equipment has been added to the power plant. Alternatively, click Save & Continue
to enter the equipment addition interface and enter the relevant equipment
information based on the actual situation. Multiple pieces of equipment can be
added.
156
157
9 System Commissioning
9.1 Commissioning Method Overview
The inverter without LCD screen only supports setting the inverter through the
SolarGo APP.
The inverter with LCD screen supports setting the inverter through LCD screen and
the SolarGo APP.
9.2 Configuration via LCD
9.2.1 LCD Overview
With the LCD screen, the user can:
1. Check the operating data, software version, alarms, etc.
2. Set parameters, safety regions, backflow prevention, etc.
NOTICE
The LCD display interface varies depending on the model of the device and the
country of safety regulations.Please refer to the actual interface display.
Introduction of LCD interface
LCD supports both touch and keys.
General status
Name/Icon
Description
Up button.
158
Name/Icon
Description
Down button.
Enter button.
• Short press: Exit button.
•
Long
press 5 seconds: Restart the device
Used to view information such as PV current, voltage, and
power generation.
Used to view information such as battery model and
status.
• GW6K-ET-L-G10, GW8K-ET-L-G10, GW10K-ET-L-G10,
GW12K-ET-L-G10 Display one battery
• GW15K-ET-L-G10, GW20K-ET-L-G10 display two battery
channels
Used to view the alarm and fault information of the
inverter.
Used to enter the settings interface of the inverter.
Used to view the status of the power grid and
information.
Used to check the status of the generator.
Used to view the load information of the inverter.
Return to the main screen
Cancel
Return to previous menu
Next
Go to the next setting page
Back
Return to the previous setting page
Microgrid status
159
Name/Icon
Description
Up button.
Down button.
Enter button.
• Short press: Exit button.
•
Long
press 5 seconds: Restart the device
Used to view information such as PV current, voltage, and
power generation.
Used to view information such as battery model and
status.
• GW6K-ET-L-G10, GW8K-ET-L-G10, GW10K-ET-L-G10,
GW12K-ET-L-G10 Display one battery
• GW15K-ET-L-G10, GW20K-ET-L-G10 display two battery
channels
Used to view the alarm and fault information of the
inverter.
Used to enter the settings interface of the inverter.
Used to view the status of the power grid and
information.
Used to display the status of the grid-connected inverter.
160
Name/Icon
Description
Used to view the load information of the inverter.
Return to the main screen
Cancel
Return to previous menu
Next
Go to the next setting page
Back
Return to the previous setting page
LCD setting interface structure
9.2.2 Quick Settings
Setting safety code
1. Tap Home
>Quick Settings > Safe Code to set the parameters.
2. Select the corresponding safety code based on the country or region where the
equipment is located.
3. After the setting is completed, please click Confirm.After the interface prompts
Confirm OK, the parameters are set successfully.
161
Set parameters for lithium battery
1. Tap Home
> Quick Settings > BAT Setting to enter parameter setting interface.
2. Set the parameters based on actual needs.
3. After the setting is completed, please click Confirm.After the interface prompts
Confirm OK, the parameters are set successfully.
NOTICE
Please make sure that you click Confirm on each page to ensure that the
parameters take effect, otherwise the system will run with default parameters.
162
Setting Basic Parameter
BAT Connection Mode
Battery
Type
GOODW
E
Default
Description
If the system is connected to a GOODWE
brand lithium battery, please select GOODWE
and choose the correct model.
If the third-party lithium battery model
connected in the system is not in this list,
please select it according to the actual
situation:
• Lithium 50Ah
• Lithium 100Ah
163
NO Battery
BAT Setting
If the third-party lithium battery model
connected to the system is in this list, please
Others
select the correct model according to the
actual situation.
If a lead-acid battery is connected to the
Lead
system, select Lead acid and choose the
acid
correct type of lead-acid.Only supports: GEL,
AGM, Flooded.
There is no battery connected in the system.
Set according to the actual connected battery in the
system.
Set parameters for lithium battery
Parameter
SOC Protection
Depth Of Discharge
(On-Grid)
Depth Of Discharge
(Off-Grid)
Backup SOC Holding
Description
Enable or disable SOC protection.
The maximum depth of discharge of the battery when the
system is working on-grid.
The maximum depth of discharge of the battery when the
system is working off-grid.
The battery will be charged to preset SOC protection value
by utility grid or PV when the system is running on-grid,
so that the battery SOC is sufficient to maintain normal
working when the system is off-grid.
Set parameters for lead-acid battery
Parameter
Description
Maximum
Current
Charging The battery charging mode is set to constant voltage
charging by default.
The maximum charging voltage and current in the
Constant Charging Voltage constant charge state.Please set them according to
the battery technical parameters.
Float Voltage
The Time Float Charging
164
Maximum Current For
Switch To Float Charge
Battery Capacity
Internal Resistance
Temperature
Compensation
Lower Limit Of Discharge
Voltage
Maximum Discharging
Current
The battery charging current is less than Maximum
Current For Switch To Float Charge and the duration
reaches The Time Float Charging, the battery
charging status changes from Constant Charge
mode to Float Charge mode.
When the battery is approaching full charge, it will
switch to float charging mode.This value is the upper
limit of charging voltage in this mode.Please set it
according to the battery technical parameters.
Please set it according to the battery technical
parameter.
The internal resistance of the battery.Please set it
according to the battery technical parameters.
By default, when the temperature is higher than
25℃, the upper limit of charging voltage will
decrease by 3mV for every 1℃ increase.The actual
settings should be based on the technical parameter
of the battery.
Please set it according to the battery technical
parameters.
Please set it according to the battery technical
parameters.The greater the discharge current is, the
shorter the working time of the battery is.
Setting Working Mode
1. Tap Home
>Quick Settings > Working Mode to set the parameters.
2. Set the parameters based on actual needs.
3. After the setting is completed, please click Confirm.After the interface prompts
Confirm OK, the parameters are set successfully.
NOTICE
Please make sure that you click Confirm on each page to ensure that the
parameters take effect, otherwise the system will run with default parameters.
165
Parameter
Description
Based on Self-use Mode, Back-up Mode, TOU
Mode and Off-Grid Mode can be enabled at the
same time, and the inverter will automatically
Self-use Mode
select the working mode.Operation priority: OffGrid Mode>Back-up Mode>TOU Mode >Self-use
Mode.
Charging From Enabling this function allows the system to
Grid
purchase electricity from power grid.
Back-up
Mode
The percentage of power purchased compare to
Rated Power
the rated power of the inverter.
TOU Mode
Within the start and end time, the battery will
Time
charge or discharge based on the set chargedischarge mode and rated power.
Charge/Dischar Set to charge or discharge based on actual
ge
needs.
The percentage of power during charging or
Power (%)
discharging compared to the rated power of the
inverter.
166
Bat (%)
Off-Grid Mode
The battery stop charging once the battery SOC
reaches Charge Cut-off SOC.
To set the SOC for stopping the battery
discharge, please refer to9.3.7.6. section 9.2.2.2
on setting battery parameters and set the Depth
of Discharge (On Grid) and Depth of Discharge
(Off Grid) through the LCD screen.
In off-grid mode, the inverter disconnects from
the grid and only supplies power to the BACK-UP
load, with any excess energy charged to the
battery.
Setting PV Connect Mode
1. Tap Home
>Quick Settings > PV Connect Mode to set the parameters.
2. Set the parameters based on actual needs.
3. After the setting is completed, please click Confirm.After the interface prompts
Confirm OK, the parameters are set successfully.
Parameter
Stand-alone Connect
Partial Parallel Connect
Description
The PV strings are connected to the MPPT terminals one
by one.
The PV strings are connected to the inverter in both
stand-alone and parallel connection.For example, one PV
string connect to MPPT1 and MPPT2, another PV string
connect to MPPT3.
167
When the external PV string is connected to the inverter
side PV input port, the same PV string is connected to
multiple PV input ports.
Parallel Connect
Setting the on-grid power limit
1. Tap Home
>Quick Settings > Power Limit the parameters.
2. Set the parameters based on actual needs.
3. After the setting is completed, please click Confirm.After the interface prompts
Confirm OK, the parameters are set successfully.
Parameter
Power Limit
Export Power
External CT Ratio
Description
Enable Power Limit when power limiting is required by local
grid standards and requirements.
Set the value based on the actual maximum power feed into
the utility grid.
Set the ratio of the primary current to the secondary current of
the external CT.
• Built in electric meter: No need to set CT ratio.The default CT
ratio is 120A/40mA.
• GM330: Supports purchasing from GOODWE or third-party,
CT ratio requirement: nA/5A
nA: For the primary input current of CT, n ranges from 200
to 5000.
5A: CT secondary input current of CT.
○
○
Meter/CT Assisted Test
168
1. Through the main interface, click > Quick Settings > Meter/ CT Assisted Test to
enter the parameter setting interface.
2. Click Start Test to begin the test.After the test is completed, judge the test result
according to the interface prompts.
9.2.3 Setting Advanced Parameters
1. Tap Home > Advanced Settings to set the parameters. Enter the initial password:
1111.
2. Set the parameters based on actual needs.
3. After the setting is completed, please click Confirm. After the interface prompts
Confirm OK, the parameters are set successfully.
Parameter
One-click restart
Battery Wake-up
Description
By using this function, the inverter can be quickly restarted.
After being turned on, the battery can be awakened when it
shuts down due to undervoltage protection.
Only applicable to lithium batteries without circuit breakers.
After being turned on, the output voltage of the battery port is
about 60V.
169
Off-grid Switch
Shadow Scan
In off-grid mode, the switch controls the on/off of the inverter's
off-grid function. In on-grid mode, this function does not take
effect.
The switch is initially in the ON state, and the off-grid function is
enabled. After the inverter is powered on, the off-grid output
function of the inverter is enabled. In the off-grid state, turning
off and then turning on the off-grid switch, the off-grid
overload time can be known and the off-grid output can be
restarted.
Enable Shadow Scan when the PV panels are severely
shadowed to optimize the power generation efficiency.
9.2.4 Setting Immediate Charging
1. Tap Home
> Immediate Charging to set the parameters.
2. Set the parameters based on actual needs.
3. After the setting is completed, please click Confirm. After the interface prompts
Confirm OK, the parameters are set successfully.
Parameter
Immediate Charging
SOC For Stopping
Charging
Description
Enable to charge the battery by the grid immediately.
This takes effect once. Enable or Disable based on
actual needs.
Stop charging the battery once the battery SOC reaches
SOC For Stopping Charging.
170
Immediate Charging
Power
Indicates the percentage of the charging power to the
inverter rated power when enabling Immediate
Charging.
For example, setting the Immediate Charging Power of
a 10kW inverter to 60, which means the charging power
of the inverter is 10kW*60%=6kW.
9.2.5 Setting the Basic Information
1. Tap Home
> Basic Settings to set the parameters.
2. Set the parameters based on actual needs.
3. After the setting is completed, please click Confirm. After the interface prompts
Confirm OK, the parameters are set successfully.
9.2.6 Viewing Device Information
1. Tap Home
> Device Information to search the parameters.
NOTICE
Inverter serial number, DSP, BMS, LCD and ARM can be queried.
171
9.2.7 Setting Port Connection
NOTICE
If you need to set the relevant parameters of the grid-connected inverter in
microgrid mode, please connect to the SolarGo APP to configure the settings.
Setting Port Connection Generators
1. After connecting to the SolarGo APP, go to Home
parameter setting interface.
2. Set the parameters based on actual needs.
> Port Connection, entering the
3. After the setting is completed, please click Confirm. After the interface prompts
Confirm OK, the parameters are set successfully.
NOTICE
Please make sure that you click Confirm on each page to ensure that the
parameters take effect, otherwise the system will run with default parameters.
No.
Parameter
Description
172
1
Generator ON/OFF
2
Rated Power
3
Run Time
4
Max Charging Power
5
SOC for Starting
Charging
6
SOC For Stopping
Charging
7
8
9
10
Maximum Operation
Voltage
Minimum Operation
Voltage
Upper Limit Of
Operating Frequency
Lower Limit Of
Operating Frequency
11
Delay Before Load
12
Prohibited Working
Hours
Controls the start and stop of the generator. Only
applicable to generators that support dry contact.
Rated power of the generator.
The duration of continuous operation of a
generator. When the working time exceeds the set
value, the generator will automatically shut down.
This feature only applies to generators that
support dry contact connection.
Set the maximum charge power for the generator
battery.
Set the starting SOC for the generator to charge
the battery. When the SOC of the battery is lower
than the set value, the generator will charge the
battery.
Set the stopping SOC for the generator stopping
charging the battery. When the SOC of the battery
reaches the set value, the generator will stop
charging the battery.
Set the upper limit of operating voltage for the
generator.
Set the lower limit of operating voltage for the
generator.
Set the upper limit of operating frequency for the
generator.
Set the lower limit of operating frequency for the
generator.
The no-load preheating time before the generator
is loaded.
Please set the generator prohibition time
according to the actual situation.
Setting Port Connection Load Control
Dry Contact Mode
1. After connecting to the SolarGo APP, go to Home
parameter setting interface.
2. Set the parameters based on actual needs.
> Port Connection, entering the
3. After the setting is completed, please click Confirm. After the interface prompts
Confirm OK, the parameters are set successfully.
173
NOTICE
Please make sure that you click Confirm on each page to ensure that the
parameters take effect, otherwise the system will run with default parameters.
174
No.
Parameter
1
Load Control ON/OFF
2
Dry Contact Mode
3
Time Mode
4
Load Control 1
5
Mode:
Standard/Intelligent
6
Load Consumption
Time
7
Load Rated Power
Description
Set the load control function on/off.
ON: When the switch is ON, the loads will be
powered.
OFF: When the switch is OFF, the power will be cut
off.
Set the time to enable the load, and the load will
be powered automatically within the setting time
period. Standard mode or intelligent mode can be
selected.
Set the 1st group of load control time, and a total
of 4 groups can be set.
Standard: The loads will be powered within the
setting time period.
Intelligent: When the residual energy generated
by the PV exceeds the preset load power rating
within a set time period, it starts to supply power
to the load.
Minimum time of operation after the load is
turned on to avoid frequent switching of the load
due to energy fluctuations. Only applicable to
intelligent mode.
When the residual energy generated by the PV
exceeds the rated power of this load, it begins to
power the load. Only applicable to intelligent
mode.
175
8
SOC Mode
9
Off-Grid Battery
Protection Value
The inverter has an integrated relay controlling
port, which can control whether to power the
loads or not.
In off-grid mode, the load connected to the port
will not be powered if the BACKUP overload is
detected or the battery SOC value is lower than
the Off-grid battery protection value. Please set
off-grid battery protection values based on actual
needs.
9.3 SolarGo APP
9.3.1 APP Introduction
NOTICE
• The interface graphics or interface words used in this article are all based on
SolarGo App V6.4.0 version, App version upgrade may lead to interface changes,
the picture involves data for reference only, please refer to the actual prevail.
• The parameter display will be different depending on the model of the device
and the country where the safety regulations are set. Please refer to the actual
interface display for specific parameters.
• Before setting parameters, please carefully read this manual and the user
manual for the corresponding model of product to familiarize yourself with the
product's functions and features. Errors in the setting of grid parameters may
result in the inverter not being able to be connected to the grid or not being
connected to the grid in accordance with grid requirements, affecting the
amount of power generated by the inverter.
SolarGo App is a mobile application that can communicate with inverters or charging
stations via Bluetooth, WiFi, 4G, or GPRS. Commonly used functions are as follows:
• Check the operating data, software version, alarms, etc.
• Set the safety standards country, power grid parameters, power limits,
communication parameters, etc. for the inverter.
• Set the charging mode for the charging station, etc.
• Equipment maintenance.
176
9.3.1.1 Downloading and Installing the App
Make sure that the mobile phone meets the following requirements:
• Mobile phone operating system: Android 5.0 or later, iOS 13.0 or later.
• The mobile phone can access the Internet.
• The mobile phone supports WLAN or Bluetooth.
NOTICE
Once the SolarGo App has been installed, you will receive automatic notifications
when updates are available.
Method 1: Search SolarGo in Google Play (Android) or App Store (iOS) to download
and install the app.
Method 2: Scan the QR code below to download and install the App.
9.3.1.2 Connection Method
After the device is powered on, it can connect to the app in the following ways:
177
NOTICE
Different communication modules may result in differences in the specific
connection distance. Please refer to the communication module actually used.
9.3.1.3 Introduction of Interface
178
No.
Name/Icon
Description
1
Tap the icon to open the page downloading the SEMS Portal
app.
2
Tap to read the connection guide.
Not found
3
• Check information such as app version, local contacts,
etc.
• Other settings, such as update date, switching language,
set temperature unit, etc.
4
Select based on actual communication method. If you have
Bluetooth/Wi
any problems, tap
or NOT Found to read the
Fi/4G
connection guides.
• The list of all devices. The last digits of the device name
are normally the serial number of the device.
• Select the device by checking the serial number of the
master inverter when multi inverters are parallel
connected.
• The device name varies depending on the inverter model
or smart dongle type:
Wi-Fi/LAN Kit; Wi-Fi Kit; Wi-Fi Box: Solar-WiFi***
○
5
Device List
○
○
Bluetooth module or inverter with built-in Bluetooth
module: SOL-BLE***
WiFi/LAN Kit-20: WLA-***
○
WiFi Kit-20: WFA-***
○
Ezlink3000: CCM-BLE***; CCM-***; ***
○
4G Kit-CN-G20/4G Kit-CN-G21: GSA-***; GSB-***
○
4G Kit-G20: GSC-***
○
Microinverter: WNN***
○
Charging pile: ***
179
No.
Name/Icon
Description
6
Search
Device
Tap Search Device if the device is not found.
9.3.2 Connecting the Energy Storage Inverter
Step 1: Confirm that the inverter is powered on and that both the communication
module and the inverter are operating normally.
Step 2: Depending on the type of communication module, select the Bluetooth or
WLAN tab on the SolarGo App home page.
Step 3 (Optional): If you choose to connect the device via WiFi, first open your
phone's WiFi settings and connect to the inverter's WiFi signal. Default Connection
Password: 12345678.
Step 4: Drag down or click Search Device to refresh the device list, confirm the
inverter signal name based on the inverter serial number, and click the inverter
signal name to enter the login interface. Select the device by checking the serial
number of the master inverter when multi inverters are parallel connected.
Step 5 (Optional): When connecting the device via Bluetooth for the first time, a
Bluetooth pairing prompt will appear on the interface. Please click Pair to continue
connecting and enter the login interface.
Step 6: Log in to the app using your actual role and change your login password
according to the prompts on the interface. Initial Login Password: 1234.
Step 7: If you connect the inverter via Solar-WiFi***, modify the initial connection
password according to the interface prompts; if you connect the inverter via WLA-***
or WFA-***, modify the initial login password according to the interface prompts.
After changing your password, log in again and go to the device details page. Please
refer to the actual prompts on the interface.
Step 8 (Optional): If you connect the inverter via WLA-*** or WFA-***, enable
Bluetooth to remain on according to the interface prompts after entering the device
details page. Otherwise, the Bluetooth signal will be turned off after this connection
ends.
Method 1: Log in via WLAN
180
NOTICE
• After upgrading the SolarGo app to version V5.6.2 or higher, a pop-up window
will appear prompting you to change your password each time you connect to
the inverter via WLAN. If you wish to permanently close the pop-up window,
please click “Do not show again” when the pop-up window appears.
• If you forget the modified password, please reset the password by resetting the
smart dongle or the inverter LCD screen. Refer to the corresponding inverter or
smart dongle manual for the steps. Resetting the smart dongle to restore the
initial password will cause the smart dongle to be restored to factory settings.
181
Method 2: Log in via Bluetooth
182
9.3.3 Introduction of the Energy Storage Inverter Interface
183
No.
Name/Icon
Description
1
Serial
Number
Serial number of connected device.
2
Device Status
Indicates the status of the inverter, such as Working, Fault,
etc.
3
En Chart
Indicates the energy flow chart of the PV system. The actual
interface may differ.
4
Indicates the system status, such as Safety Code, Working
System Status Mode, Battery Model, Battery Status, Power Limit, ThreePhase Unbalanced Output, etc.
5
Home. Click to view device serial number, operating status,
energy flow chart, system operating status, and other
information.
6
Parameter interface. Click to view the inverter operating
parameters.
184
No.
7
Name/Icon
Description
• Settings interface. Click to quickly configure the inverter
settings, including basic settings, advanced settings, and
more.
• Log in before entering Quick Settings and Advanced
Settings. Initial password: goodwe2010 or 1111.
9.3.4 Setting Communication Parameters
NOTICE
The communication configuration interface may differ depending on the
communication method used by the inverter or the communication module
connected. Please refer to the actual interface.
9.3.4.1 Setting Privacy and Security Parameters
Type I:
Step 1: Go to the settings page by selecting Home > Settings > Communication
Settings > Privacy and Security > WLAN Module Password Change.
Step 2: Set the WiFi hotspot password for the new communication module according
to your actual needs, click Save to complete the setup.
Step 3: Open your phone's WiFi settings and connect to the inverter's WiFi signal
using the new password.
185
Type II:
Step 1: Go to the settings page via Home > Settings > Communication Settings >
Privacy and Security.
Step 2: Enable corresponding functions according to actual needs.
186
No.
Parameter
Description
1
Bluetooth
Continuously
Enabled
Disabled by default.After enabling this feature, the
device's Bluetooth will remain on and stay connected to
SolarGo.Otherwise, the device's Bluetooth will turn off
after 5 minutes, disconnecting from SolarGo.
WLAN Control
Disabled by default.After enabling this feature, SolarGo
can connect to the device via WLAN when both are on
the same local area network.Otherwise, even if they are
on the same local area network, they cannot connect.
3
Modbus-TCP
After enabling this feature, third-party platforms can
access the inverter via the Modbus TCP protocol to
perform monitoring functions.
4
SSH control Ezlink
Once this feature is enabled, third-party platforms can
connect to and control EzLink's Linux system.
2
Type III:
Step 1: Go to the settings page via Home > Settings > Communication Settings >
Privacy and Security.
187
Step 2: Enable Bluetooth to remain on and the login password function according
to actual needs.
No.
Parameter
Description
1
Bluetooth
Continuously
Enabled
Disabled by default.After enabling this feature, the
device's Bluetooth will remain on and stay connected to
SolarGo.Otherwise, the device's Bluetooth will turn off
after 5 minutes, disconnecting from SolarGo.
Login Password
Disabled by default.After enabling this feature, the
device will prompt you to enter your login password
when connecting to SolarGo.When using your login
password for the first time, please use the initial
password and change your password according to the
prompts on the screen.
2
9.3.4.2 Setting WLAN/LAN Parameters
188
NOTICE
The communication configuration interface may vary depending on the type of
smart dongle connected to the inverter. Please refer to the actual interface for
accurate information.
Step 1: Go to the settings page via Home > Settings > Communication Settings >
WLAN/LAN.
Step 2: Configure the WLAN or LAN network based on the actual situation.
No.
Parameter
Description
1
Network Name
Applicable to WLAN. Please select the corresponding
network based on your actual situation and
communicate the device with the router or switch.
2
Password
Applicable to WLAN. Enter the password for the
network you actually selected.
189
No.
Parameter
3
DHCP
4
IP Address
5
Subnet Mask
6
Gateway Address
7
DNS Server
Description
When the router is using the dynamic IP mode, turn
on the DHCP function.
When using the router in static IP mode or using a
switch, turn off the DHCP function.
When DHCP is enabled, there is no need to configure
this parameter.
When DHCP is turned off, please configure this
parameter according to the information of the router
or switch.
9.3.4.3 Setting RS485 Communication Parameters
NOTICE
Set the host communication address of the inverter. When using a single inverter,
set the communication address according to the actual situation. When connecting
multiple inverters, each inverter must have a different address, and none of the
inverters can be set to communication address 247.
Step1: Enter the setting page through Home > Settings > Communication
Configuration > RS485.
Step 2: Configure the communication address and baud rate according to the actual
situation.
190
9.3.4.4 Detecting WLAN
Step1: Enter the setting page through Home > Settings > Communication
Configuration > WLAN Detection.
Step 2: Click Diagnose to check the current network connection status.
191
9.3.5 Quick System Setup
NOTICE
• When the inverter model is different, the interface display and parameter
settings will vary. Please refer to the actual product for details.
• When selecting the safety code country/region, the system will automatically
configure the overvoltage and undervoltage protection, overfrequency and
underfrequency protection, inverter on-grid voltage/frequency, connection
slope, Cosφ curve, Q(U) curve, P(U) curve, PF curve, high and low voltage ridethrough, etc. according to the safety regulation requirements of different
regions. For specific parameter values, please set the safety regulations region
first, then check via Home > Settings > Advanced Settings > Safety Regulations
Parameter Settings.
• The generation efficiency of inverter differs in different working modes. Please
set according to the local actual electricity consumption.
Self-generated and self-consumed mode: The basic operating mode of the
system. The power generated by the PV system supply the loads in priority; the
excess power will charge the batteries, and then the remaining power will be
○
192
NOTICE
○
○
○
○
○
sold to the utility grid. When the power generated in the PV system is
insufficient, the battery will supply the loads in priority. If the battery power is
insufficient, the load will be powered by the utility grid.
BACK-UP Mode: The BACK-UP mode is mainly applied to the scenario where
the grid is unstable. When the grid is disconnected, the inverter turns to offgrid mode and the battery will supply power to the BACKUP loads; when the
grid is restored, the inverter switches to grid-tied mode.
TOU Mode: It is recommended to use TOU mode in scenarios when the peakvalley electricity price varies a lot. Select TOU mode only when it meets the
local laws and regulations. Based on actual needs, during off-peak hours, the
battery can be set to charging mode to purchase electricity from the grid for
charging; during peak hours, the battery can be set to discharge mode to
supply power to the load through the battery.
Off-grid mode: Suitable for areas without a power grid. PV and batteries
constitute a pure off-grid system, where PV power generation supplies power
to the load and excess power charges the batteries. When PV power
generation does not meet the load's power demand, the battery supplies
power to the load.
Delayed charging: Suitable for areas with grid connection power output
restrictions. By setting peak power limits and charging time periods,
photovoltaic power generation that exceeds grid connection limits can be used
to charge batteries, reducing photovoltaic waste.
Demand management: Mainly applicable to scenarios where peak power
consumption is limited. When the total power consumption of the load
exceeds the power quota within a short period of time, battery discharge can
be used to reduce the amount of power consumption exceeding the quota.
9.3.5.1 Quick System Setup (Type II)
Step 1: Go to the parameter settings page via Home > Settings > Quick
Configuration.
Step 2: Enter your login password to access the safety settings interface.Initial
Installation password: goodwe2010 or 1111.
Step 3: Some models support one-click configuration.Select the Configuration
Wizard Mode to quickly configure the system.
Step 4: Select the safety standard country based on the country or region where the
193
inverter is located.After completing the settings, click Next to set the battery
connection mode.
Step 5: Select the battery connection mode based on the actual battery connection
situation.If no battery is connected, the basic parameter settings are complete.If a
battery is connected, click Next after completing the settings to set the battery type.
Step 6: Select the battery model based on the actual battery connection.After
completing the settings click Next to set the working mode.
194
Step 7: Set the working mode according to actual needs.After completing the
settings, click Next to finish configuring the work mode.For certain models, after the
195
operating mode configuration is complete, the system will automatically enter the
CT/electric meter self-check state.At this point, the inverter will temporarily
disconnect from the grid and then automatically reconnect.
Step 8: Select the battery according to the actual situation: initial installation, daily
operation, or replacement installation.
196
197
No.
Parameter
Description
BACK-UP Mode
1
Charging from
Grid
Enabling this function allows the system to purchase
electricity from power grid.
2
Charging Power
The percentage of power purchased compare to the
rated power of the inverter.
TOU Mode
3
Start Time
Within the start and end time, the battery will charge or
discharge based on the set charge-discharge mode and
rated power.
4
End Time
5
Charge and
Discharge
Mode
Set to charge or discharge based on actual needs.
6
Rated Power
The percentage of power during charging or discharging
compared to the rated power of the inverter.
7
Charge Cut-off
SOC
The battery stop charging once the battery SOC reaches
Charge Cut-off SOC.
Peakshaving
Reserved SOC
For
Peakshaving
In Peak Shaving mode, the battery SOC should be lower
than Reserved SOC For Peakshaving.Once the battery
SOC is higher than Reserved SOC For Peakshaving, the
peak shaving mode fails.
9
Peak Power
Purchase Limit
Set the maximum power limit allowed to purchase from
the grid.When the loads consume power exceed the sum
of the power generated in the PV system and Peak
Power Purchase Limit, the excess power will be made up
by the battery.
10
During the period when electricity is purchased for
Time Period for
charging, if the load power consumption does not
Purchasing
exceed the purchased electricity quota, the battery can
Electricity and
be charged through the power grid.Otherwise, only PV
Charging
power can be used to charge the battery.
8
198
No.
Parameter
Description
Delayed Charging Mode
11
Peak Power
Selling Limit
12
PV Prioritizes
Battery
Charging
13
Charging Start
Time
Set peak power limits in accordance with grid standards
in certain countries or regions.The peak power limit must
be lower than the local specified output power limit.
Within the charging time range, photovoltaic power
generation is prioritized for charging the battery.
9.3.6 Setting the Basic Information
9.3.6.1 Setting up Lightning Protection Alarm Function
After enabling SPD secondary lightning protection alarm, when the lightning
protection module is abnormal, there will be SPD module abnormal alarm prompt.
Step 1: Set up lightning protection alerts via Home > Settings > Basic Settings >
Lightning Protection Alerts.
Step 2: Turn this feature on or off based on your actual needs.
199
9.3.6.2 Setting Backup Power Parameters
After enabling Backup, the battery will power the load connected to the BACK-UP
port of the inverter to ensure Uninterrupted Power Supply when the power grid fails.
Step 1: Go to the settings page by selecting Home > Settings > Basic Settings >
Backup Power.
Step 2: Set the Back-up Power function based on actual needs.
200
No.
Parameter
Description
1
UPS Mode - Full
Wave Detection
Check whether the utility grid voltage is too high or too
low.
2
UPS Mode - Half
Wave Detection
Check whether the utility grid voltage is too low.
3
EPS Mode Supports LVRT
Stop detecting utility grid voltage.
4
First Cold Start
(Off - grid)
This takes effect once. Once this feature is enabled, you
can use batteries or photovoltaics to output backup
power in off-grid mode.
5
Take effect multiple times. Once this feature is enabled,
Cold Start Holding
you can use batteries or photovoltaics to output backup
(Off-grid)
power in off-grid mode.
201
No.
6
Parameter
Clear Overload
History
Description
Once the power of loads connected to the inverter
BACK-UP ports exceeds the rated load power, the
inverter will restart and detect the power again. The
inverter will perform restart and detection several times
until the overloading problem is solved. Time increases
between each reboot. Tap Clear Overload History to
reset the restart time interval after the power of the
loads connected to the BACK-UP ports meets the
requirements. The inverter will restart immediately.
9.3.6.3 Setting up Shadow Scanning Function
When photovoltaic panels are severely shaded, enabling the shadow scanning
function can optimize the power generation efficiency of the inverter.
Step 1: Go to the settings page by selecting Home > Settings > Basic Settings >
Shadow Scan.
Step 2: Turn this feature on or off based on your actual needs. Some models support
setting scan interval times, MPPT shadow scanning, etc. Please set according to the
actual interface.
202
9.3.6.4 Setting Power Adjustment Parameters
Step 1: Go to the settings interface via Home > Settings > Basic Settings > Power
Scheduling.
Step 2: Set the active power dispatch or reactive power dispatch parameters
according to the actual situation.
No.
Parameter
Description
Active Scheduling
1
2
Active
Scheduling
Mode
According to the requirements of the power grid
company in the country/region where the inverter is
located, control the active power according to the
selected dispatch mode. Supports:
• Disabled: Disables active scheduling.
• Fixed value reduction: Dispatch according to a fixed
value.
• Percentage reduction: Dispatch based on a
percentage of the rated power.
Active Power
• When the active power dispatch mode is set to fixed
value derating, the active power is set to a fixed
value.
• When the active power dispatch mode is set to
percentage derating, the active power is set as a
percentage of the rated power.
⽐。
Reactive Scheduling
203
No.
Parameter
Description
Reactive
Scheduling
Mode
According to the requirements of the power grid
company in the country/region where the inverter is
located, control the reactive power according to the
selected dispatch mode. Supports:
• Disabled: Disables reactive scheduling.
• Fixed value compensation: Dispatch according to a
fixed value.
• Percentage compensation: Dispatch based on a
percentage of the rated power.
• PF compensation.
Status
Set the power factor as lagging or leading based on
actual needs and local grid standards and
requirements.
5
Reactive Power
• When the reactive power dispatch mode is set to
fixed value derating, the reactive power is set to a
fixed value.
• When the reactive power dispatch mode is set to
percentage derating, the reactive power is set as a
percentage of the rated power.
6
Power Factor
When the reactive power dispatch mode is set to PF
compensation, set the power factor.
3
4
9.3.7 Setting Advanced Parameters
NOTICE
When entering the advanced settings page, the password is goodwe2010 or 1111.
9.3.7.1 Setting Three-phase Unbalanced Output
When connecting a three-phase inverter to unbalanced loads, such as when L1, L2,
and L3 are connected to loads of different power ratings, the three-phase
unbalanced output setting function must be enabled.
Step 1: Set this function via Home > Settings > Advanced Settings > Three-phase
Imbalance Output.
204
Step 2: Turn this feature on or off based on your actual needs.
9.3.7.2 Setting BACK-UP N and PE Relay Switches
To comply with local laws and regulations, ensure that the relay inside the BACK-UP
port remains closed and the N and PE wires are connected when the inverter is
working off-grid.
Step 1: Go to the parameter setting page by clicking Home > Settings > Advanced
Settings > Backup Power N and PE Relay Switch.
Step 2: Turn this feature on or off based on your actual needs.
205
9.3.7.3 Setting DRED/Remote Shutdown/RCR/EnWG 14a Function
Enable DRED/Remote Shutdown/RCR before connecting the third party DRED, remote
shutdown, or RCR device to comply with local laws and regulations.
Step 1: Set this function via Home > Settings > Advanced Settings > DRED/Remote
Shutdown/RCR.
Step 2: Turn this feature on or off based on your actual needs.
Step 3: For regions subject to EnWG 14a regulations, when enabling the RCR
function, select the RCR mode according to the actual connection device type and set
the DI port power percentage value.
206
9.3.7.4 Setting the On-Grid Power Limit
Step 1: Tap Home > Settings> Advanced Settings > Power Limit to set the
parameters.
207
Step 2: Turn the anti-backflow function on or off according to actual needs.
Step 3: Enter the parameters and tap √. The parameters are set successfully.
9.3.7.4.1 Setting the On-Grid Power Limit(General)
No. Parameter
Description
1
The on-grid
power limit
Enable Power Limit when power limiting is required by local
grid standards and requirements.
2
Power Limit
Set the value based on the actual maximum power feed into
the utility grid.
3
External
MeterCT Ratio
Set the ratio of the primary current to the secondary current of
the external CT.
9.3.7.5 Setting the Arc Detection Function
Step 1: Go to the settings page via Home > Settings > Advanced Settings > DC Arc
Detection to set up the AFCI detection function.
Step 2: Detect arc faults, clear fault alarms, or perform a self-check on the AFCI as
needed.
208
No.
Parameter
Description
1
Setting the Arc
Detection
Enable or Disable based on actual needs.
2
Setting the Arc
Detection Status
The test status, like Not Self-checking, self-check
succeeded, etc.
3
Clear AFCI Alarm
Clear ARC Faulty alarm records.
4
Self-check
Tap to check whether the AFCI function works normally.
9.3.7.6 Set Battery Function
9.3.7.6.1 Set Parameters for Lithium Battery
Step 1: Tap Home > Settings> Advanced Settings > Battery Function Settings to
set the parameters.
Step 2: Set the parameters based on actual needs.
209
No.
Parameter
Description
Parameter Settings
1
Max. Charging
Current
Only applicable to certain models. Set the maximum
charging current based on actual needs.
2
Max.
Discharging
Current
Only applicable to certain models. Set the maximum
discharging current based on actual needs.
210
No.
Parameter
Description
Optional. This option is displayed on the interface when
a battery that supports heating is connected. After the
battery heating function is turned on, when the
temperature is below the value that starts up the
battery, PV power or electricity from the grid will be used
to heat the battery.
Heating Mode:
• GW5.1-BAT-D-G20/GW8.3-BAT-D-G20
Low Power Mode: Maintains minimum battery
power input capacity, turns on when the
temperature is below -9℃, and turns off when the
temperature is above or equal to -7℃.
Medium Power Mode: to maintain the moderate
power input capacity of the battery. It will be turned
on when the temperature is less than 6℃, and
turned off when it is greater than or equal to 8℃.
High Power Mode: to maintain the higher power
input capacity of the battery. It will be turned on
when the temperature is less than 11℃, and turned
off when it is greater than or equal to 13℃.
• GW14.3-BAT-LV-G10
Low Power Mode: Maintains minimum battery
power input capacity, turns on when the
temperature is below 5℃, and turns off when the
temperature is above or equal to 7℃.
Medium Power Mode: to maintain the moderate
power input capacity of the battery. It will be turned
on when the temperature is less than 10℃, and
turned off when it is greater than or equal to 12℃.
High Power Mode: to maintain the higher power
input capacity of the battery. It will be turned on
when the temperature is less than 20℃, and turned
off when it is greater than or equal to 22℃.
○
○
3
Battery Heating
○
○
○
○
211
No.
Parameter
Description
4
• After being turned on, the battery can be awakened
when it shuts down due to undervoltage protection.
Battery Wake-up • Only applicable to lithium batteries without circuit
breakers. After being turned on, the output voltage of
the battery port is about 60V.
Limit Protection
5
SOC Protection
Start battery protection when the battery capacity is
lower than the Depth of Discharge.
6
SOC Limit
The upper limit value for battery charging. Charging
stops when the battery SOC reaches the SOC upper limit.
7
Discharge Depth The maximum discharge value allowed for the battery
(On-grid)
when the inverter is in the on-grid scenario.
To ensure that the battery SOC is sufficient to maintain
normal operation when the system is off-grid, the
battery will purchase electricity from the grid and charge
to the set SOC protection value when the system is
connected to the grid.
8
Backup Power
SOC
Maintenance
9
Discharge Depth The maximum discharge value allowed for the battery
(Off-grid)
when the inverter is in the off-grid scenario.
10
Off-grid SOC
Recovery
When the inverter is operating off-grid, if the battery
SOC drops below the lower limit, the inverter stops
outputting power and only charges the battery until the
battery SOC returns to the off-grid recovery SOC value. If
the SOC lower limit value is higher than the off-grid
recovery SOC value, charge to SOC lower limit +10%.
Immediate Charging
11
Immediate
Charging
Enable to charge the battery by the grid immediately.
This takes effect once. Enable or Disable based on actual
needs.
212
No.
Parameter
Description
12
SOC for
Stopping
Charging
Stop charging the battery once the battery SOC reaches
SOC For Stopping Charging.
13
Immediate
Charging Power
Indicates the percentage of the charging power to the
inverter rated power when enabling Immediate
Charging.
For example, for an inverter with a rated power of 10kW,
when set to 60, the charging power is 6kW.
14
Start
Start charging immediately.
15
Stop
Immediately stop the current charging task.
9.3.7.6.2 Setting Lead-acid Battery Parameter
Step 1: Tap Home > Settings> Advanced Settings > Battery Function Settings to
set the parameters.
Step 2: Set the parameters based on actual needs.
213
214
No.
Parameter
Description
1
Nominal
Capacity
Set the battery capacity according to the actual
parameters.
2
Battery Internal Set the battery internal resistance according to the actual
Resistance
parameters.
3
Temperature
Compensation
When the battery temperature changes, the battery
charging voltage will be affected.Based on 25°C, the
charging voltage upper limit is adjusted according to the
set value for every degree change in battery
temperature.
For example, if the charging temperature influence
coefficient is set to 10, when the battery temperature
rises to 26 degrees, the charging voltage upper limit
decreases by 10 mV.
4
Lower
Discharge
Voltage
Set the minimum voltage during battery discharge
according to actual requirements.
5
Max.
Discharging
Current
Set the maximum discharging current based on actual
needs.
6
Max. Charging
Current
Set the maximum charging current based on actual needs.
7
Constant
Charging
Voltage
Set the voltage value for constant charging of the battery
according to actual requirements.
8
Floating
Voltage
Set the voltage value for battery float charging according
to actual requirements.
9
Maximum
The maximum charging current after switching the battery
Current When
charging mode from constant charging/equal charging to
Switching to
float charging.
Floating Charge
215
No.
Parameter
Description
10
Time to Switch
to Float
Charging Mode
The time required to switch the battery charging mode
from constant charging/equal charging to float charging.
11
Equalization
Charging Cycle
Set the interval days for battery equalization charging.
Restriction Protection
12
SOC Protection
Start battery protection when the battery capacity is lower
than the Depth of Discharge.
13
SOC Lower
Limit (Grid
Connection)
The minimum battery charge that must be maintained
when the inverter is connected to the grid.
14
Backup Power
SOC
Maintenance
To ensure that the battery SOC is sufficient to maintain
normal operation when the system is off-grid, the battery
will purchase electricity from the grid and charge to the
set SOC protection value when the system is connected to
the grid.
15
SOC Lower
Limit (Off-Grid)
The minimum battery charge that must be maintained
when the inverter is operating off-grid.
Off-grid SOC
Recovery
When the inverter is operating off-grid, if the battery SOC
drops below the lower limit, the inverter stops outputting
power and only charges the battery until the battery SOC
returns to the off-grid recovery SOC value.If the SOC lower
limit value is higher than the off-grid recovery SOC value,
charge to SOC lower limit +10%.
16
Immediate Charging
17
SOC for
Stopping
Charging
Stop charging the battery once the battery SOC reaches
SOC For Stopping Charging.
216
No.
Parameter
Description
18
Indicates the percentage of the charging power to the
inverter rated power when enabling Immediate Charging.
Immediate
Charging Power For example, for an inverter with a rated power of 10kW,
when set to 60, the charging power is 6kW.
19
Start
Start charging immediately.
20
Stop
Immediately stop the current charging task.
9.3.7.7 Setting Power Adjustment Response Parameters
Step 1: Go to the parameter settings page via Home > Settings > Advanced Settings
> Power Adjustment Response Parameters.
Step 2: Based on actual requirements, select Disable, Slope Adjustment, or FirstOrder Low-Pass Filter Mode from the Active Power Adjustment drop-down menu. If
you select slope adjustment, enter the power change gradient value; if you select
first-order low-pass filter mode, enter the first-order low-pass filter time
parameter value.
Step 3: Based on actual requirements, select Disable, Slope Adjustment, or FirstOrder Low-Pass Filter Mode from the Reactive Power Adjustment drop-down menu.
If you select slope adjustment, enter the power change gradient value; if you
select first-order low-pass filter mode, enter the first-order low-pass filter time
parameter value.
Step 4: Click √ to save the settings.
217
No.
Parameter
Description
Active Adjustment Response Mode
1
First-order Lowpass Filter
Within the response time constant, active adjustment is
implemented according to a first-order low-pass curve.
2
First-order Lowpass Filter Time
Parameter
Set the time constant within which the active power
changes based on the first order LPF curve.
3
Slope Adjustment
Implement active power dispatch based on the power
change slope.
4
Power Change
Gradient
Set the slope of active power adjustment changes.
Reactive Adjustment Response Mode
218
No.
Parameter
Description
5
First-order Lowpass Filter
Within the response time constant, reactive adjustment
is implemented according to a first-order low-pass
curve.
6
First-order Lowpass Filter Time
Parameter
Set the time constant within which the reactive power
changes based on the first order LPF curve.
7
Slope Adjustment
Implement reactive power dispatch based on the
power change slope.
8
Power Change
Gradient
Set the slope of reactive power adjustment changes.
9.3.7.8 Setting Customized Safety Parameters
NOTICE
Set the custom safety parameters in compliance with local requirements. Do not
change the parameters without the prior consent of the grid company
219
9.3.7.8.1 Setting Reactive Curve
Step 1: Go to the parameter setting page via Home > Settings > Advanced Settings
> Safety Parameters Settings > Reactive Power Curve Settings.
Step 2: Set the parameters based on actual needs.
Q(U) Curve
Cosφ Curve
No.
Parameter
Description
Fix PF
Enable Fix PF when it is required by local grid standards
and requirements. The power factor remains fixed during
the inverter working process.
Fix PF
1
220
No.
Parameter
Description
2
Under-excited
3
Over-excited
Set the power factor as lagging or leading based on actual
needs and local grid standards and requirements.
4
Power Factor
Set the power factor based on actual needs. Range: 0-~0.8, or +0.8~+1.
1
Fix Q
Enable Fix Q when it is required by local grid standards
and requirements.
2
Under-excited /
Over-excited
Set the reactive power as inductive or capacitive reactive
power based on local grid standards and requirements,
and actual needs.
3
Reactive Power
The percentage of reactive power to the apparent power.
Fix Q
Q(U) Curve
1
Q(U) Curve
When Q(U) curves need to be set according to the power
grid standards of certain countries or regions, enable this
function.
2
Mode Option
Set Q(U) Curve mode. Supported: basic mode, slope
mode.
Vn Voltage
The percentage of actual voltage to the rated voltage at
Vn point, n=1, 2, 3, 4.
For example, setting Vn Voltage to 90 means
V/Vrated%=90%.
4
Vn Reactive
Power
The ratio of reactive power to apparent power output by
the Vn-point inverter, n=1, 2, 3, 4.
For example, setting Vn Voltage to 48.5 means
Q/Srated%=48.5%.
5
Voltage Dead
Zone Width
When the Q(U) curve mode is set to slope mode, set the
voltage dead zone. Within this dead zone, there is no
requirement for reactive power output.
3
221
No.
Parameter
Description
6
Over-excitation
Slope
In Q(U) curve mode set to slope mode, the power change
slope is set to a positive or negative value.
7
Underexcitation Slope
The ratio of reactive power to apparent power output by
the Vn-point inverter, n=1, 2, 3, 4.
For example, setting Vn Voltage to 48.5 means
Q/Srated%=48.5%.
8
Vn Reactive
Power
9
Q(U) Curve Time The power is required to reach 95% in the first order LPF
Constant
curve within three time constant.
10
Enable
Extension
Function
11
Power Input
Curve
12
Power Output
Curve
After enabling, set corresponding parameters.
When the ratio of the reactive power output of the
inverter to the rated power is between the curve power
input and curve power output, the Q(U) curve
requirements are met.
Cos φ (P) Curve
1
Cos φ (P) Curve
Enable Cosφ Curve when it is required by local grid
standards and requirements.
2
Mode Option
Set cosφ (P) Curve mode. Supported: basic mode, slope
mode.
3
Pn Power
The percentage of the output active power to the rated
power at Pn point. N=A, B, C, D, E.
4
Pn Cos φ
Pn Power Factor N=A, B, C, D, E.
5
Over-excitation
Slope
6
Underexcitation Slope
In cosφ (P) curve mode set to slope mode, the power
change slope is set to a positive or negative value.
222
No.
Parameter
Description
7
Pn Power
The percentage of the output active power to the rated
power at Pn point. N=A, B, C.
8
Pn Cos φ
Pn Power Factor N=A, B, C.
9
Cos φ (P) Curve
Time Constant
The power is required to reach 95% in the first order LPF
curve within three time constant.
10
Enable
Extension
Function
After enabling, set corresponding parameters.
11
Voltage Input
Curve
12
Voltage Output
Curve
When the grid voltage is between the entry curve voltage
and the exit curve voltage, the voltage meets the Cosφ
curve requirements.
Q(P) Curve
1
Enable Q(P)
Curve
When Q(P) curves need to be set according to the power
grid standards of certain countries or regions, enable this
function.
2
Mode Option
Set Q (P) Curve mode. Supported: basic mode, slope
mode.
Pn Power
The percentage of the output reactive power to the
apparent power at Pn point, n= 1, 2, 3, 4, 5, 6.
For example, setting Pn Power to 90 means Q /
Prated%=90%.
4
Pn Reactive
Power
The percentage of the output active power to the rated
power at Pn point, n=1, 2, 3, 4, 5, 6.
For example, setting Pn Reactive Power to 90 means P /
Prated%=90%.
5
Over-excitation
Slope
6
Underexcitation Slope
3
In Q(P) curve mode set to slope mode, the power change
slope is set to a positive or negative value.
223
No.
Parameter
Description
Pn Power
The percentage of the output reactive power to the
apparent power at Pn point, n= 1, 2, 3.
For example, setting Pn Power to 90 means Q /
Prated%=90%.
8
Pn Reactive
Power
The percentage of the output active power to the rated
power at Pn point, (n= 1, 2, 3).
For example, setting Pn Reactive Power to 90 means P /
Prated%=90%.
9
Curve Time
Constant
The power is required to reach 95% in the first order LPF
curve within three time constant.
7
9.3.7.8.2 Setting Active Curve
Step 1: Go to the parameter setting page via Home > Settings > Advanced Settings
> Safety Parameters Settings > Active Power Curve Settings.
Step 2: Set the parameters based on actual needs.
P(F) Curve
P(U) Curve
224
No.
Parameter
Description
1
Active
Power
Output
Settings
Set the inverter output power limit value.
2
Power
Change
Gradient
Set the slope of change when the active output power
increases or decreases.
Overfrequency Deloading
1
P(F) Curve
Enable P(F) Curve when it is required by local grid standards
and requirements.
Set the overfrequency deloading mode based on actual needs.
2
Overfreque
• Slope mode: Adjusts power based on overfrequency points
ncy
and load reduction slope.
Deloading
• Stop mode: Adjusts power based on the overfrequency start
Mode
point and overfrequency end point.
225
No.
Parameter
3
Overfreque When the grid frequency is too high, the active power output of
ncy
the inverter decreases.When the grid frequency exceeds this
Threshold
value, the inverter output power begins to decrease.
4
Buying and
Selling
Electricity
Conversion
Frequency
5
When the grid frequency is too high, the active power output of
Overfreque
the inverter decreases.When the grid frequency exceeds this
ncy
value, the inverter output power does not continue to
Terminal
decrease.
6
Overfreque
ncy Power
Adjust the active power output of the inverter based on the
Slope
rated power, current power, apparent power, or maximum
Reference
active power.
Power
7
Overfreque
When the grid frequency exceeds the overfrequency point, the
ncy Power
inverter output power is reduced according to the slope.
Slope
8
Quiet Time
The inverter outputs the delayed response time when the grid
frequency is higher than the Underfrequency Point.
9
Hysteresis
Function
Enable
Enable hysteresis function.
10
Frequency
Hysteresis
Point
During the frequency reduction process, if the frequency
decreases, the power output is adjusted to the minimum point
of the reduced power output until the frequency falls below the
hysteresis point, at which point the power output is restored.
Hysteresis
Delay Time
For overfrequency load shedding and frequency reduction,
when the frequency is lower than the hysteresis point, the
power recovery waiting time, i.e., a certain amount of time
must elapse before power is restored.
11
Description
When the set frequency value is reached, the system switches
from selling electricity to buying electricity.
226
No.
Parameter
Description
12
Hysteresis
Power
Recovery
Slope
Reference
Power
For overfrequency derating and frequency reduction, when the
frequency is less than the hysteresis point, the reference for
power restoration* is the rate of change of the reference
power according to the restoration slope.Support: Pn rated
power, Ps apparent power, Pm current power, Pmax maximum
power, power difference (△P).
13
Hysteresis
Power
Recovery
Slope
For under-frequency loading and frequency increase, when the
frequency exceeds the hysteresis point, the slope at which the
power is recovered.
Underloaded
1
P(F) Curve
Enable P(F) Curve when it is required by local grid standards
and requirements.
Set the underfrequency loading mode according to actual
needs.
2
Underfrequ
ency
• Slope mode: Adjusts power based on underfrequency points
Loading
and load slope.
Mode
• Stop mode: Adjusts power based on underfrequency start
point and underfrequency end point.
3
Underfrequ When the grid frequency is too low, the active power output of
ency
the inverter increases.When the grid frequency is lower than
Threshold
this value, the inverter output power begins to increase.
4
Buying and
Selling
Electricity
Conversion
Frequency
5
Underfrequ When the grid frequency is too low, the active power output of
ency
the inverter increases.When the grid frequency is lower than
Terminal
this value, the inverter output power begins to increase.
When the set frequency value is reached, the system switches
from selling electricity to buying electricity.
227
No.
Parameter
Description
6
Overfreque
ncy Power
Adjust the active power output of the inverter based on the
Slope
rated power, current power, apparent power, or maximum
Reference
active power.
Power
7
Underfrequ When the grid frequency is too low, the active power output of
ency Power the inverter increases.The slope of the inverter output power
Slope
when it rises.
8
Quiet Time
The inverter outputs the delayed response time when the grid
frequency is lower than the Underfrequency Point.
9
Hysteresis
Function
Enable
Enable hysteresis function.
10
Frequency
Hysteresis
Point
During underfrequency loading, if the frequency increases, the
power is output at the lowest point of the loading power until
the frequency exceeds the hysteresis point, at which point the
power is restored.
11
Hysteresis
Delay Time
For underfrequency loading and frequency increase, when the
frequency exceeds the hysteresis point, the power recovery
waiting time, i.e., a certain amount of time must elapse before
power recovery occurs.
12
Hysteresis
Power
Recovery
Slope
Reference
Power
For underfrequency loading and frequency increase, when the
frequency exceeds the hysteresis point, the reference for
power restoration* is the change rate of the reference power
according to the restoration slope.Support: Pn rated power, Ps
apparent power, Pm current power, Pmax maximum power,
power difference (△P).
13
Hysteresis
Power
Recovery
Slope
For under-frequency loading and frequency increase, when the
frequency exceeds the hysteresis point, the slope at which the
power is recovered.
14
Enable P(U) Enable P(U) Curve when it is required by local grid standards
Curve
and requirements.
228
No.
15
16
17
Parameter
Description
Vn Voltage
The percentage of actual voltage to the rated voltage at Vn
point, n=1, 2, 3, 4.
For example, setting Vn Voltage to 90 means V/Vrated%=90%.
Vn Active
The percentage of the output active power to the apparent
power at Vn point, n=1, 2, 3, 4.
For example, setting Vn Voltage to 48.5 means
P/Prated%=48.5%。
Output
Response
Mode
Set the active output response mode.Supports:
PT-1 Behavior, realize active scheduling based on the firstorder LPF curve within the response time constant.
Gradient Control, realize active scheduling based on the power
change slope
18
Power
Change
Gradient
The active scheduling will be implemented based on the power
gradient when the output response mode is set to slope
scheduling.
19
First-order
Low-pass
Filter Time
Parameter
Set the time constant within which the active power changes
based on the first order LPF curve when the Output Response
Mode is set to be PT-1 Behavior.
9.3.7.8.3 Setting Grid Protection Parameters
Step 1: Tap Home > Settings > Advanced Settings > Safety Parameters >
Protection Parameters to set the parameters.
Step 2: Set the parameters based on actual needs.
No.
Parameter
Description
1
OV Stage n Trip Value
Set the grid overvoltage protection threshold
value, n = 1, 2, 3, 4.
2
OV Stage n Trip Time
Set the nth-order trip time for grid overvoltage
triggering, where n = 1, 2, 3, 4.
229
No.
Parameter
Description
3
UV Stage n Trip Value
Set the grid undervoltage protection threshold
value, n= 1, 2, 3, 4.
4
UV Stage n Trip Time
Set the grid undervoltage protection tripping time,
n = 1, 2, 3, 4.
5
10-minute
Overpressure Trigger
Value
Set the 10min overvoltage protection threshold
value.
6
10-minute
Set the overpressure trip time to 10 minutes.
Overpressure Trip Time
7
OF Stage n Trip Value
Set the grid overfrequency protection threshold
value, n = 1, 2, 3, 4.
8
OF Stage n Trip Time
Set the nth-order trip time for grid overfrequency
triggering, where n = 1, 2, 3, 4.
9
UF Stage n Trip Value
Set the grid underfrequency protection threshold
value, n = 1, 2, 3, 4.
10
UF Stage n Trip Time
Set the UF trigger n-order trip time, n=1, 2, 3, 4.
9.3.7.8.4 Setting Grid Connection Parameters
Step 1: Tap Home > Settings > Advanced Settings > Safety Parameters >
Connection Parameters to set the parameters.
Step 2: Set the parameters based on actual needs.
230
No.
Parameter
Description
Start up and Connect to the Grid
1
Connection
Voltage
Upper Limit
When the inverter is connected to the grid for the first time,
if the grid voltage is higher than this value, the inverter will
not be able to connect to the grid.
2
Connection
Voltage
Lower Limit
When the inverter is connected to the grid for the first time,
if the grid voltage is lower than this value, the inverter will
not be able to connect to the grid.
3
Connection
Frequency
Upper Limit
When the inverter is connected to the grid for the first time,
if the grid frequency is higher than this value, the inverter
will not be able to connect to the grid.
4
Connection
Frequency
Lower Limit
When the inverter is connected to the grid for the first time,
if the grid frequency is lower than this value, the inverter will
not be able to connect to the grid.
5
Grid
Connection
Waiting Time
When the inverter is connected to the grid for the first time,
wait for the grid connection time after the grid voltage and
frequency meet the grid connection requirements.
6
Enable Soft
Ramp Up
Gradient
Enable the start-up slope function.
7
Indicates the percentage of incremental output power per
Soft Ramp Up
minute based on the local requirements when the inverter is
Gradient
powered on for the first time.
Fault Reconnection
8
Connection
Voltage
Upper Limit
When reconnecting to the grid after an inverter failure, if the
grid voltage is higher than this value, the inverter will not be
able to connect to the grid.
9
Connection
Voltage
Lower Limit
When reconnecting to the grid after an inverter failure, if the
grid voltage is lower than this value, the inverter will not be
able to connect to the grid.
231
No.
Parameter
Description
10
Connection
Frequency
Upper Limit
When reconnecting to the grid after an inverter failure, if the
grid frequency is higher than this value, the inverter will not
be able to connect to the grid.
11
Connection
Frequency
Lower Limit
When reconnecting to the grid after an inverter failure, if the
grid frequency is lower than this value, the inverter will not
be able to connect to the grid.
12
Grid
Connection
Waiting Time
After an inverter malfunctions and reconnects to the grid,
wait for the grid voltage and frequency to meet the grid
connection requirements before reconnecting to the grid.
13
Reconnection
Load Slope
Enable the start-up slope function.
Enable
14
In some countries/regions, set the percentage of
incremental output power per minute when the inverter is
Reconnection
not powered on for the first connection.For example, setting
Load Slope
Reconnection Power Loading Slope to 10 means the
reconnection slope is 10% Prated/min.
9.3.7.8.5 Setting Voltage Ride through Parameters
Step 1: Enter the parameter setting page through Home > Settings > Advanced
Settings > Safety Parameter Settings > Voltage Fault Ride-Through.
Step 2: Set the parameters based on actual needs.
No.
Parameter
Description
1
UVn Point
Voltage
During low-voltage ride-through, the ratio of the ridethrough voltage at the low-voltage ride-through
characteristic point to the rated voltage. n=1,2,3,4,5,6,7。
2
UVn Point
Time
The crossing time of the low-voltage crossing feature point
during the low-voltage crossing process. n=1,2,3,4,5,6,7
LVRT
232
No.
Parameter
Description
3
Enter Low
Penetration
Threshold
When the grid voltage is between the low penetration
threshold and the exit low penetration threshold, the inverter
does not immediately disconnect from the grid.
4
Exit Low
Penetration
Threshold
5
Slope K1
K value coefficient of reactive power support during low
voltage ride through.
6
Enable Zero
Current
Mode
When enabled, the system outputs zero current during lowvoltage ride-through.
7
Enter
Threshold
The threshold for entering zero current mode.
1
OVn Point
Voltage
During high-voltage ride-through, the ratio of the ridethrough voltage at the high-voltage ride-through
characteristic point to the rated voltage. n=1,2,3,4,5,6,7.
2
OVn point
time
The crossing time of the high-voltage crossing feature point
during the high-voltage crossing process. n=1,2,3,4,5,6,7.
3
Enter High
Penetration
Threshold
4
Exit High
Penetration
Threshold
5
Slope K2
K value coefficient of reactive power support during high
voltage ride through.
6
Enable Zero
Current
Mode
The system outputs zero current during high-voltage ridethrough.
HVRT
When the grid voltage is between the high penetration
threshold and the exit high penetration threshold, the
inverter does not immediately disconnect from the grid.
233
No.
Parameter
Description
7
Enter
Threshold
The threshold for entering zero current mode.
9.3.7.8.6 Setting Frequency Fault Ride through
Parameters
Step 1: Enter the parameter setting page through Home > Settings > Advanced
Settings > Safety Parameter Settings > Frequency Fault Ride-Through.
Step 2: Set the parameters based on actual needs.
No.
Parameter
Description
1
Frequency
Hopping
Enabled
Enable frequency hopping function.
2
UFn Point
Frequency
Set the frequency of the underfrequency n point. n=1,2,3.
3
UFn Point
Time
Set the underfrequency time for underfrequency point n.
n=1,2,3.
4
OFn Point
Frequency
Set the frequency of the overfrequency n point. n=1,2,3.
5
OFn Point
Time
Set the overfrequency time for the overfrequency n point.
n=1,2,3.
9.3.7.9 Setting PV Connect Mode
For certain models, you can manually set the photovoltaic string connection method
for the inverter MPPT port to avoid errors in identifying the string connection
method.
Step 1: Go to the settings page via Home > Settings > Advanced Settings > PV
Access Mode.
Step 2: Set the connection mode to independent connection, partial parallel
234
connection, or parallel connection based on the actual connection method of the
photovoltaic string.
No.
Parameter
Description
1
Stand-alone
Connect
The external photovoltaic strings are connected one-toone with the photovoltaic input ports on the inverter
side.
Partial Parallel
Connect
The PV strings are connected to the inverter in both
stand-alone and parallel connection. For example, one
PV string connect to MPPT1 and MPPT2, another PV
string connect to MPPT3.
Parallel Connect
When the external PV string is connected to the inverter
side PV input port, the same PV string is connected to
multiple PV input ports.
2
3
9.3.7.10 Setting Unbalanced Voltage Output Function
235
Step 1: Go to the settings page via Home > Settings > Advanced Settings >
Unbalanced Voltage Output.
Step 2: Turn this feature on or off based on your actual needs.
Step 3: After enabling the unbalanced phase voltage function, enter the parameter
values according to actual requirements, click “√”, and the parameter settings are
complete.
9.3.7.11 Restore Factory Settings
To restore the device to its factory default settings, perform the following steps.
Step 1: Go to the settings page by selecting Home > Settings > Advanced Settings >
Factory Reset.
Step 2: Click Restore Factory Settings to restore the interface prompt section to
factory settings.
236
9.3.7.12 Exporting Parameters
9.3.7.12.1 Exporting Safety Parameters
Some models support exporting safety parameter files after selecting the safety
regulation country.
Step 1: Go to the Safety Parameters Export page by clicking Home > Settings >
Advanced Settings > Export.
Step 2: After selecting the safety parameters, click Export to start downloading the
current safety parameter file. After exporting is complete, click Share and select how
you want to open the exported file based on your actual needs.
237
9.3.7.12.2 Exporting Log Parameters
Step 1: Go to the Parameters Export page by clicking Home > Settings > Advanced
Settings > Export.
Step 2: Select the device type for which you want to export logs, such as inverter
logs, communication module logs, etc.
Step 3: Select the log type you want to export, download and export the log file. After
exporting is complete, click Share and select how you want to open the exported file
based on your actual needs.
238
9.3.8 Setting Smart Meter Parameters
9.3.8.1 Meter/CT Assisted Test
Meter detection function, which can detect whether the CT of the meter is connected
correctly and the current operation status.
Step 1: Go to the detection page via Home > Settings > Smart Meter Function >
Smart Meter/CT Auxiliary Detection.
Step 2: Click Start Detection and wait for the detection to complete. Then, view the
detection results.
239
9.3.9 Setting Generator/Load Control Parameters
9.3.9.1 Setting Load Control Parameters
NOTICE
• When the inverter supports load control functionality, loads can be controlled via
the SolarGo app.
• For the ET40-50kW series inverters, load control functionality is only supported
when the inverter is used with STS. The inverter supports load control on the
GENERATOR port or BACKUP LOAD port.
Step 1: Go to the settings page by clicking Home > Settings > Port Connection.
Step 2: Based on the actual interface, select Load Control to enter the load control
interface and set the control mode.
• Dry Contact Mode: When the switch is ON, the loads will be powered; when the
switch is OFF, the power will be cut off. Turn the switch on or off based on actual
needs.
240
• Time Mode: Set the time to enable the load, and the load will be powered
automatically within the setting time period. Standard mode or intelligent mode
can be selected.
No.
Parameter
Description
1
Standard Mode
The loads will be powered within the setting time period.
2
Intelligent Mode
When the residual energy generated by the PV exceeds
the preset load power rating within a set time period, it
starts to supply power to the load.
3
Start Time
4
Closing Time
The time mode will be on between the Start Time and
End Time.
241
No.
Parameter
Description
5
Repetition
Set the repetition frequency.
6
Minimum Load
Operating Time
Minimum time of operation after the load is turned on to
avoid frequent switching of the load due to energy
fluctuations. Only applicable to intelligent mode.
7
When the residual energy generated by the PV exceeds
Load Rated Power the rated power of this load, it begins to power the load.
Only applicable to intelligent mode.
• SOC mode: The inverter has a built-in relay dry contact control port (ET40-50kW
series inverters have a built-in STS control port) that can control whether to supply
power to the load. In off-grid mode, if overload is detected at the BACK-UP terminal
or GENERATOR terminal, or if the battery SOC protection function is triggered,
power supply to the load connected to the terminal will be stopped.
242
9.3.9.2 Setting Generator Parameters
NOTICE
• When the inverter supports generator control functionality, the generator can be
controlled via the SolarGo app.
• For the ET40-50kW series inverters, connection and control of generators is only
supported when the inverter is used with STS.
Step 1: Go to the settings page by clicking Home > Settings > Port Connection.
Step 2: Follow the prompts on the screen to enter the generator control interface
and set the generator parameters according to your actual needs.
Step 3: When setting up the generator control function, select the generator type
based on the actual connection status.Currently supported types are: no
generator connected, manual start/stop generator, and automatic start/stop
generator.Set the corresponding parameters according to the selected generator
type.
• No generator connected: When no generator is connected to the energy storage
system, select No generator connected.
• Manual Control of Generator (Does Not Support Dry Node Connection): The
generator must be manually controlled to start and stop; the inverter cannot
control the generator’s operation.
• Automatic generator control (supports dry contact connection): When the
generator has a dry contact control port and is connected to the inverter, you need
to set the generator control mode of the inverter to switch control mode or
automatic control mode in the SolarGo app.
Switch Control Mode: When the switch is turned on, the generator operates;
after reaching the set operating time, the generator automatically stops
operating.
Automatic Control Mode: Prohibits generator operation during set prohibited
operating hours and allows generator operation during operating hours.
○
○
243
No.
Parameter
Description
1
Dry Contact
Control Mode
The switch control mode/ automatic control mode.
Switch control mode
2
Generator Dry
Node Switch
Only applicable to switch control mode.
3
Running Time
The generator continues to run until the arrival time, at
which point it stops running.
Automatic control mode
244
No.
Parameter
Description
4
No Working Time
Set the time period during which the generator is
prohibited from operating.
5
Running Time
After the generator starts running, it continues to run
for a certain period of time.When the time is up, the
generator stops running.If the generator's start-up and
operation time includes a prohibited working time, the
generator will stop operating during this time
period.After the prohibited working time, the generator
will restart and resume timing.
No.
Parameter
Description
Generator Information Settings
1
Rated Power
Set the rated power for generator operation.
2
Running Time
Set the continuous operating time of the generator.The
generator will shut down after the continuous operating
time has elapsed.
3
Upper Voltage
4
Lower Voltage
5
Upper Frequency
6
Lower Frequency
7
Preheating Time
Set the voltage range for generator operation.
Set the frequency range for generator operation.
Set the generator no-load preheating time.
Parameter Settings for Charging Batteries with a Generator
8
Switch
Select whether to use the generator to charge the
battery.
9
Maximum
Charging Power
(‰)
The charging power when the generator charges the
battery.
10
Start Charging
SOC
When the battery SOC is below this value, the generator
generates electricity to charge the battery.
245
No.
Parameter
Description
11
Stop Charging
SOC
When the battery SOC exceeds this value, stop charging
the battery.
9.3.9.3 Setting Microgrid Parameters
NOTICE
When the inverter supports microgrid functionality, microgrid parameters can be
set via the SolarGo app.
Step 1: Go to the settings page by clicking Home > Settings > Port Connection.
Step 2: Follow the prompts on the screen to enter the microgrid control interface and
set the microgrid parameters according to your actual needs.
246
No.
Parameter
Description
1
Maximum SOC
for Charging
Set the upper limit for the charging SOC, and stop
charging when the upper limit is reached.
Manual Wake-up
• When the power grid fails, if the battery charge is
low, it cannot support the energy storage inverter
to operate off-grid. Click this button to force the
energy storage inverter to output voltage to the
grid-connected inverter, thereby starting the gridconnected.
• Effective once.
3
Auto-wake
• When the power grid fails, if the battery charge is
low, it cannot support the energy storage inverter
to operate off-grid. After enabling this function, the
system will force the energy storage inverter to
output voltage to the grid-connected inverter at a
fixed time, thereby starting the grid-connected
inverter.
• Take effect multiple times.
4
Grid Power
Purchase Power
Limit Bias
Set the adjustable range of the maximum power that
the device can actually purchase from the power grid.
2
9.3.10 Equipment Maintenance
9.3.10.1 View Firmware Information/Firmware Upgrade
Through the firmware information, you can view or upgrade the DSP version, ARM
version, BMS version, AFCI version, STS version, and communication module
software version of the inverter. Some devices do not support software version
upgrade via SolarGo App, and the actual situation shall prevail.
247
NOTICE
After logging in to the inverter, if a firmware upgrade dialog box pops up, click
Firmware Upgrade to jump directly to the firmware information view interface.
9.3.10.1.1 Regular Firmware Upgrades
NOTICE
• When there is a red dot on the right side of the firmware information, please
click to view the firmware update information.
• During the upgrade process, please ensure that the network is stable and that
the device remains connected to SolarGo, otherwise the upgrade may fail.
Step 1: Access the firmware information viewing interface through Home >
Settings > Firmware Information. After logging in to the inverter, if a firmware
upgrade dialog box pops up, click Firmware Upgrade to jump directly to the
firmware information view interface.
Step 2: (Optional) Click Check for Updates to confirm whether there is a new
firmware version available for update.
Step 3: Follow the prompts on the screen and click Firmware Upgrade to enter the
firmware upgrade interface.
Step 4: (Optional) Click Learn More to view firmware-related information, such as the
current version, latest version, firmware update history, etc.
Step 5: Click Upgrade and follow the prompts on the screen to complete the
upgrade.
248
9.3.10.1.2 One-click Firmware Upgrade
NOTICE
• When there is a red dot on the right side of the firmware information, please
click to view the firmware update information.
• During the upgrade process, please ensure that the network is stable and that
the device remains connected to SolarGo, otherwise the upgrade may fail.
Step 1: Access the firmware information viewing interface through Home >
Settings > Firmware Information. After logging in to the inverter, if a firmware
upgrade dialog box pops up, click Firmware Upgrade to jump directly to the
firmware information view interface.
Step 2: Click Firmware Upgrade and follow the prompts on the screen to upgrade all
firmware versions that need updating. If you only need to upgrade a specific
firmware version, click Learn More, then click Firmware Upgrade below the
firmware version you want to upgrade to, and follow the prompts on the screen to
complete the operation.
249
Step 3: (Optional) Click Learn More to view all current firmware version information.
Step 4: (Optional) Click
to view the version upgrade history.
9.3.10.1.3 Automatic Firmware Upgrade
NOTICE
• When communicating using the WiFi/LAN Kit-20 or WiFi Kit-20 module, and the
module firmware version is V2.0.1 or higher, the device automatic upgrade
function can be enabled.
• After enabling the device auto-upgrade feature, if there is an update to the
module version and the device is connected to the network, it will automatically
upgrade to the corresponding firmware version.
Step 1: Access the firmware information viewing interface through Home >
Settings > Firmware Information.
Step 2: Turn on or off the automatic upgrade feature based on your needs.
9.3.10.2 Changing Login Password
250
NOTICE
The login password for connecting to the inverter via the SolarGo App can be
changed. After changing your password, please remember it. If you forget your
password, please contact the after-sales service center for assistance.
Step 1: Go to the settings page by clicking Home > Settings > Change Login
Password.
Step 2: Change your password based on the actual situation.
251
252
10 Power Plant Monitoring
NOTICE
The parameters that can be viewed or set on the interface vary depending on the
login account type or power plant type. Please refer to the actual interface for
details.
10.1 APP Introduction
SEMS+ App is a software for power plant monitoring and control, which allows you to
remotely manage the power plant and equipment, view the operating data of the
power plant, alarm messages and so on.
10.1.1 Complementary Products
Support monitoring and management of related equipment from the GoodWe
brand, such as inverters, smart meters, data loggers, charging stations, batteries,
etc.
10.1.2 Downloading and Installing the App
Make sure that the mobile phone meets the following requirements:
• Mobile phone operating system: Android 6.0 or later, iOS 13.0 or later.
• The mobile phone can access the Internet.
• The mobile phone supports WLAN or Bluetooth.
Download Method:
Method 1:
Search SEMS+ in Google Play (Android) or App Store (iOS) to download and install the
App.
Method 2:
Scan the QR code below to download and install the App.
253
10.1.3 Connection Method
10.1.4 Setting Language and Server
NOTICE
Supports automatic server adaptation based on login account information. If you
need to set it up yourself, when selecting the server, please confirm that the
selected region matches the region associated with your account, otherwise you
will not be able to log in.
Please select the app display language according to your actual needs, and select the
corresponding server according to your actual location.
254
10.2 Account Management
10.2.1 Registering
Step 1: Click Register on the app's home page to enter the account registration
interface.
Step 2: Select the account type based on your actual needs, then click Next.
Step 3: Enter your account information according to the actual situation, and click
Register to complete the registration.
255
10.2.2 Login
NOTICE
• Before logging into the App, please register or get your account and password
through your dealer.
• After logging in your account, you can view or manage power station
information, please refer to the actual interface.
Step 1: Enter your account number and password, read and check the login
agreement, and click Log In.
256
10.2.3 Switch
Step 1: On the My interface, click Log Out > Log in with Another Account.
Step 2: Select an existing account or add a new account based on your actual needs.
10.2.4 Canceling
Step 1: On the My interface, click Account & Security.
257
Step 2: Click Close Account, enter your account password, and click Submit.
10.2.5 Account Permissions
The SEMS+ app supports different account types with different permissions. The
operating permissions for different account types vary. Please refer to the table
below for details.
Top-level
Secondary
Third-level
Four-level
Five-level
menu
menu
menu
menu
menu
Permissions
Administrators,
Login &
Register
-
-
-
-
installers, marketing
personnel, owners,
visitors
Administrators,
Monitoring
Overview
Information
-
-
-
installers, marketing
personnel, owners,
visitors
Create Station
-
-
-
258
Administrators,
installers, owners,
visitors
Station
Administrators,
Station List
-
-
-
installers, marketing
personnel, owners,
visitors
Station Details
Administrators,
Monitoring
-
-
installers, marketing
personnel, owners,
visitors
Add Device
-
Administrators,
installers, and owners
Administrators,
Search
installers, marketing
Device
personnel, owners,
visitors
Device List
Replace
Administrators,
Device
installers, and owners
Edit Device
Device
installers, and owners
Delete
Administrators,
Device
installers, and owners
Device
Monitoring
Info
Device Details
Administrators,
Device
Remote
Control
Device
Remote
Upgrade
Administrators,
installers, marketing
personnel, owners,
visitors
Administrators,
installers, and owners
Administrators and
installers
Administrators,
Alarms
-
-
installers, marketing
personnel, owners,
visitors
259
Station
Configuratio
n
Edit Station
Delete
Station
Replacement
History
User
Information
-
-
installers, and owners
Administrators,
installers, and owners
Administrators,
-
installers, marketing
personnel, owners
-
Administrators,
installers, and owners
Administrators,
Home
Configuratio
Administrators,
-
n
installers, marketing
personnel, owners,
visitors
Administrators,
Create Station
-
-
-
installers, owners,
visitors
Administrators,
Alarm
-
-
-
-
installers, marketing
personnel
Services
Services
Administrators,
Warranty
-
-
installers, marketing
personnel, owners,
visitors
Report
Center
Administrators,
-
-
installers, marketing
personnel, owners
Administrators,
GoodWe
News
-
-
installers, marketing
personnel, owners,
visitors
Administrators,
Announceme
nts
-
-
installers, marketing
personnel, owners,
visitors
260
Administrators,
Community
-
-
installers, marketing
personnel, owners,
visitors
Create
Station
Administrators,
-
-
installers, owners,
visitors
Administrators,
Tools
Network Link
-
-
installers, marketing
personnel, owners,
visitors
Administrators,
DNSP
-
-
installers, marketing
personnel, owners,
visitors
Administrators,
Help
-
-
-
installers, marketing
personnel, owners,
visitors
My
Administrators,
User Profile
-
-
-
installers, marketing
personnel, owners,
visitors
Administrators,
User
Information
-
-
-
installers, marketing
personnel, owners,
visitors
Administrators,
Setting
-
-
-
installers, marketing
personnel, owners,
visitors
Account
Security
Administrators,
Email
-
-
installers, marketing
personnel, owners,
visitors
261
Administrators,
Password
-
-
installers, marketing
personnel, owners,
visitors
Secondary
Account
Administrators,
-
-
installers, marketing
personnel
Administrators,
Close
Account
-
-
installers, marketing
personnel, owners,
visitors
Administrators,
Remote
Auth
Control Auth
-
-
Management
installers, marketing
personnel, owners,
visitors
Monitoring
Auth
-
-
Owners
Administrators,
Apps
-
-
-
installers, marketing
personnel, owners,
visitors
Administrators,
About
-
-
-
installers, marketing
personnel, owners,
visitors
Administrators,
Logout
-
-
installers, marketing
personnel, owners,
visitors
Logout
Administrators,
Login anther
Account
-
-
installers, marketing
personnel, owners,
visitors
262
10.3 Setting Communication Parameters
The SEMS+ app supports connecting devices via Bluetooth or WiFi and configuring
device network parameters to enable remote monitoring or device management.
NOTICE
When the device model or smart communication stick type is different, the device
name displayed will be different. *** is the device serial number:
• Wi-Fi/LAN Kit; Wi-Fi Kit; Wi-Fi Box: Solar-WiFi***
• WiFi/LAN Kit-20: WLA-***
• WiFi Kit-20: WFA-***
• Ezlink3000: CCM-BLE***; CCM-***; ***
• 4G Kit-CN-G20/4G Kit-CN-G21: GSA-***; GSB-***
• Charging pile: ***
10.3.1 Setting Communication Parameters via Bluetooth
NOTICE
• Before connecting, please confirm that: Bluetooth is enabled on your mobile
phone; the device is powered on and communicating normally.
• When the equipment type or smart communication stick used is different, the
interface display and parameters to be set will also differ. Please refer to the
actual situation.
Step 1: Click Network Link on the App home page, or click Network Link on the
Service interface.
Step 2: Under the Bluetooth tab, select the device you want to connect to by its
serial number.
Step 3: If prompted to log in, log in to the app according to your actual role and enter
your login password to access the communication settings interface. Initial Login
Password: 1234. If there is no login prompt, you can directly enter the
communication settings interface.
Step 4: (Optional) Enable Bluetooth Stays ON according to actual needs. Otherwise,
the Bluetooth signal will be turned off after this connection ends.
Step 5: Configure the WLAN or LAN network according to the actual situation, and
263
click Save to complete the setup. Click WLAN Detection to check whether
communication is normal.
Step 6: (Optional) Click Login Password Change, enter the new password, and click
Save to change the login password.
No.
Parameter
Privacy&Security
Description
264
No.
Parameter
1
Bluetooth Stays
ON
Description
After enabling this feature, the device's Bluetooth will
remain on and stay connected to SEMS+. Otherwise, the
device's Bluetooth will turn off after 5 minutes.
WLAN/LAN
2
WLAN
3
Name
4
Encryption
Method
5
Password
6
DHCP
Automatic
Obtain
7
IP Address
8
Subnet Mask
9
Gateway
Address
10
DNS Server
Enable or disable the WLAN function.
Set this parameter based on the actual router network
information used.
When the router is using dynamic IP mode, enable this
feature.
When using a router in static IP mode or a switch, please
disable this feature.
When DHCP is enabled, there is no need to configure
this parameter.
When DHCP is turned off, please configure this
parameter according to the information of the router or
switch.
10.3.2 Setting Communication Parameters via WiFi
NOTICE
• Before connecting, please confirm that: Wifi is enabled on your mobile phone;
the device is powered on and communicating normally.
• When the equipment type or smart communication stick used is different, the
interface display and parameters to be set will also differ. Please refer to the
actual situation.
Step 1: Open your phone's WiFi settings and connect to the inverter's WiFi signal
(Solar-WiFi***). Default Connection Password: 12345678.
Step 2: Click Network Link on the App home page, or click Network Link on the
Service interface.
Step 3: Under the WLAN tab, select the device you want to connect to by its serial
number.
Step 4: Change the WiFi hotspot password according to your actual needs. If you
265
change your password, you will need to open your mobile phone's WiFi settings after
changing it and connect to the inverter's WiFi signal using the new password.
Step 5: Configure the WLAN or LAN network according to the actual situation, and
click Save to complete the setup. Click WLAN Detection to check whether
communication is normal.
No.
Parameter
Privacy&Security
1
Login
Password
Change
Description
Change the WiFi hotspot password. After making the
changes, you need to reconnect to the inverter's WiFi
signal using the new password in the WiFi connection
settings on your phone.
WLAN/LAN
2
Internet Access
Port
3
Name
4
Encryption
Method
Depending on the actual communication mode used,
you can choose between Wi-Fi or LAN.
Set this parameter based on the actual router network
information used.
266
No.
5
Parameter
Password
6
DHCP
Automatic
Obtain
7
IP Address
8
Subnet Mask
9
Gateway
Address
10
DNS Server
Description
When the router is using dynamic IP mode, enable this
feature.
When using a router in static IP mode or a switch, please
disable this feature.
When DHCP is enabled, there is no need to configure
this parameter.
When DHCP is turned off, please configure this
parameter according to the information of the router or
switch.
10.4 Power Plant Monitoring
NOTICE
The parameters that can be viewed or set on the interface vary depending on the
login account type or power plant type. Please refer to the actual interface for
details.
10.4.1 Viewing Power Plant Information
10.4.1.1 View All Power Plant Overview Information
After logging into the SEMS+ App with your account password, you can view an
overview of the power generation status of all power plants in your current account
on the monitoring page.
Or, on the power plant page, arrange all power plant lists by different sorting and
filtering conditions to view detailed information about the power plants.
267
No.
Description
Display the total power generation of all power plants, including: today's power
1
generation, this month's power generation, this year's power generation, and total
power generation. When the number of power plants is greater than or equal to 10,
the power generation volume for that year is not displayed.
Display total installed capacity and power plant operating status. The operating
2
status of a power station is classified as: Running, Waiting, Offline, or Faulted. The
power station status is only Running when all equipment in the power station is
operating normally.
Display statistical charts showing the power plant's electricity generation for the
3
current month, the current year, or total electricity generation, or statistical charts
comparing electricity generation with the previous year. Click
statistical chart.
268
to enlarge the
No.
4
Description
Display environmental contribution data such as CO₂ Reduction, Trees Planted
Equivalent, and Standard Coal Saved.
5
Power Plant Creation.
6
Search for power stations. Enter the SN, power station name, or email
address to quickly search for the corresponding power station.
7
Power plant operation status. Display the current power plant
operating status and the number of power plants operating in each
status. Click on the operating status to filter power plants with the
corresponding operating status.
8
• Set up a list of power plants to display KPI indicators: Current
Power, Rev. Today, Rev. Total, Gen. Today, Gen. Total
• Set the sorting method for the power station list: By Default, By
Capacity
• Set the display mode for the power station list: Station Card, Station
List
• Set the selection method for the power station list: Scope, Category,
Capacity
9
Power station. Click on the name of the power station to view detailed
information about it. Different types of power stations display
different information. Please refer to the actual situation.
10.4.1.2 Viewing Monopower Plant Details
Step 1: If there are multiple power stations, you can quickly search for them on the
power station page by entering the equipment SN, power station name, or email
address.
Step 2: Click on the power plant name to enter the power plant details interface and
view detailed information.
269
10.4.1.2.1 Viewing Power Plant Details (Traditional
Mode)
270
No.
Description
1
Current power plant name.
271
No.
Description
2
Collect Power Plant.
3
Configure power plant information. Support: Configure basic power plant
information, modify user information, add power plant photos, set PV
component layout, etc.
4
The chart displays current power plant operation information, such as
energy flow diagrams, power generation, load power consumption, AC
output, and other information.
5
• Device List. Display equipment currently used in power stations, such as
inverters, batteries, data collectors, charging stations, etc.
• Click on the device card to view detailed information about the device.
6
Power plant alarm information.
10.4.1.3 Viewing Alarm Information
10.4.1.3.1 Viewing Alarm Information for All Power
Plants
Step 1: Click the Fault tab on the power plant detailed page to enter the alarm query
page.
Step 2: (Optional) Enter the power station name or equipment SN number in the
search box to quickly locate the power station or equipment you want to view.
Step 3: Click on the alarm name to view detailed alarm information.
272
10.4.1.3.2 Viewing Alarm Information for the Current
Power Plant (Traditional Mode)
Step 1: If there are multiple power plants, click on the power plant name on the
power plant list page to enter the power plant details page.
Step 2: Click Alarms to go to the alarm page and check out the alarm details. Click
to filter alert information according to actual needs.
10.4.1.3.3 Viewing the Current Device’s Alarm
273
Information
Step 1: If there are multiple power plants, click on the power plant name on the
power plant list page to enter the power plant details page.
Step 2: Select a device from the device list to enter the device details page. If there
are any alerts, you can view the 10 most recent alerts directly on the device details
page.
10.4.1.4 Viewing Power Plant Report Information
Viewing Power Plant Report
Step 1: Click Service > Report Center to enter the report center interface.
Step 2: Select the time period you want to query, search for the power plant you
want to query, and click on the power plant name to enter the report interface. To
download the report, click
> Export.
274
Viewing Power Plant Bills
Step 1: Click Service > Report Center to enter the report center interface.
Step 2: Select the time period you want to query, search for the power station you
want to query, swipe left and click
to enter the Bill interface to view the bill.
275
10.4.2 Power Plant Management
10.4.2.1 Power Plant Creation
Step 1: Click
on the home page or power station list page, or click Create Station
on the account page.
Step 2: Based on the actual situation, fill in the relevant information about the power
station in the Create Station interface.
Step 3: Click Save & Exit to complete the power plant creation. At this point, no
equipment has been added to the power plant. Alternatively, click Save & Continue
to enter the equipment addition interface and enter the relevant equipment
information based on the actual situation. Multiple pieces of equipment can be
added.
276
10.4.2.2 Configuring Power Plant Information
277
NOTICE
After the power station has been successfully created, you can update the power
station configuration information according to actual needs. When the
configuration information entered conflicts with the actual conditions of the power
station, the actual conditions of the power station shall prevail. The basic
information provided here is for reference only.
Step 1: (Optional) If there are multiple power plants, select the power plant you want
to set up in the power plant list interface.
Step 2: On the power plant details page, click
>Basic Information to access the
information viewing interface.
Step 3: Click
to enter the information modification interface, modify the
information according to your actual needs, and click Confirm to save the changes.
10.4.2.3 Power Plant Visitors Management
Supports adding power plant visitors to view basic power plant information. Visitors
to the power station cannot view all interfaces. Please refer to the actual interface.
Step 1: (Optional) If there are multiple power plants, select the power plant you want
to set up in the power plant list interface.
Step 2: In the power station details interface, go to
>User Information>Add to
enter the visitor addition interface.
Step 3: After entering the visitor information, click Confirm to complete the addition.
278
To delete an added visitor, select the visitor you want to delete in the User
Information interface, swipe right, and click Delete.
10.4.2.4 Power Plant Photos Management
Add photos of power plants to quickly identify different power plants.
Step 1: (Optional) If there are multiple power plants, select the power plant you want
to set up in the power plant list interface.
Step 2: On the power station details page, click
>Station Photos>Add to enter
279
the power station photo addition interface.
Step 3: Follow the prompts on the screen to add photos by selecting Take a Photo or
Choose from Album.
If you need to delete power plant photos, please refer to the following steps.
10.4.2.5 Adjusting the Information Displayed on the Power Station Details Page
The content displayed on the power plant details page can be adjusted according to
actual needs, such as displaying or hiding the Energy Flow Chart, or placing the
Energy Flow Chart at the top or bottom of the interface.
Step 1: (Optional) If there are multiple power plants, select the power plant you want
280
to set up in the power plant list interface.
Step 2: Go to the power plant details page and click
> Home Configuration.
Step 3: Based on actual needs, refer to the interface prompts to select the
information to be displayed, or adjust the display order of each piece of information.
10.4.2.6 Setting PV Component Layout
Set the PV Layout Design parameters based on the actual PV module conditions. The
information here is for recording PV layout only and will not change the actual PV
281
layout.
Step 1: (Optional) If there are multiple power plants, select the power plant you want
to set up in the power plant list interface.
Step 2: Enter the adjustment interface via
> PV Layout Design.
Step 3: Click Row/Column and arrange the components in each row and column
according to the actual PV component installation situation.
Step 4: Click Array Name to enter the Array Settings interface, and set the PV array
name, angle, and orientation information according to the actual situation.
10.4.2.7 Deleting Power Plant
NOTICE
For power plant visitors, deleting a power plant only means unlinking this power
plant from the visitor's account.
Step 1: (Optional) If there are multiple power plants, click on the power plant name
to enter the power plant details page.
Step 2: Click
on the power plant details interface.
Step 3: Click Delete, then click Confirm to delete the current power station.
282
10.4.2.8 Collect Power Plant
If there is a power plant you want to follow, click on the power plant on the right side
to
bookmark it. Click again to cancel the bookmark.
Click
and select Favorited in the filter Scope to display all your favorite power
plants.
10.4.3 Managing the Equipment in the Power Plant
283
10.4.3.1 Additional Equipment
NOTICE
• When the type of power station varies, the type of equipment supported to be
added is different, please refer to the actual interface.
• When Environmental Monitor is connected to a data collector, it can be added to
the station to view the data collected by Environmental Monitor.
Step 1: Click the name of the plant on the plant list page to enter the plant details
page.
Step 2: Click Device > to enter the Add Device interface.
Step 3: Select the type of device to be added according to actual needs.
Step 4: Scan for devices or manually add devices according to the interface prompts.
When scanning to add, select the desired device from the scanned devices to add
that device. When adding manually, add the device by scanning the device QR code
or manually entering the device information. The interface for adding devices varies
for different device types, so please refer to the actual situation.
Step 5: When adding devices manually, if there is a need to add more than one
device, return to the Power Station Details screen and repeat steps 3 and 4.
284
10.4.3.2 Editing Device Information
Modification of equipment names in power stations is supported.
Step 1: (Optional) If there are multiple power plants, click on the power plant name
to enter the power plant details page.
Step 2: On the power station details interface, click Device to enter the device
information page. Select the device you want to edit, swipe left, and tap .
Step 3: Enter the new device name and click Submit.
285
10.4.3.3 Deleting Device
Step 1: (Optional) If there are multiple power plants, click on the power plant name
to enter the power plant details page.
Step 2: On the power station details interface, click Device to enter the device
information page. Select the device you want to alternate, swipe left, and tap .
Step 3: Read the pop-up prompt and click OK to delete the current device.
286
10.4.3.4 Upgrading Device Firmware Version
Step 1: (Optional) If there are multiple power plants, select the power plant you want
to set up in the power plant list interface.
Step 2: Click Device to enter the device information page, and select the device for
which you want to upgrade the firmware version.
Step 3: Click on the device serial number in the middle of the page to enter the
Firmware Version page. If there is an upgrade available, click Upgrade and follow
the instructions on the screen to upgrade your device. Click to view the firmware
upgrade history.
287
10.4.4 Remote Device Management
288
NOTICE
• After completing the creation of the power station and adding equipment
to it, you can remotely set device parameters via the SEMS+ app.
• Before setting parameters, please carefully read this manual and the user
manual for the corresponding model of equipment to familiarize yourself
with the product's functions and features.Incorrect grid parameter settings
may cause devices to fail to connect to the grid or fail to connect to the grid
in accordance with grid requirements when operations such as starting grid
connection and stopping grid connection are issued to the devices, thereby
affecting power generation.
• Only for use by professionals who are familiar with local regulations and
standards, electrical systems, and who have received professional training
and are knowledgeable about this product.
• Different account permissions have different parameters that can be set
remotely.The interface is displayed based on the actual account used.Please
refer to the actual interface.
• Different device models have different parameter setting interfaces.Please
refer to the actual device for details.
10.4.4.1 Setting Energy Storage Inverter Parameters
Step 1: (Optional) If there are multiple power plants, select the power plant you want
to set up in the power plant list interface.
Step 2: Click Device to enter the device information page, and select the device for
which you want to upgrade the firmware version.
Step 3: Click , read the interface prompts, and set the inverter parameters
according to actual needs.
289
No.
Parameter
Description
Safety
Based on the grid standards of the country/region
where the inverter is located, as well as the application
scenario settings of the inverter.
2
Battery Model
Set the battery type.
3
Depth of
Discharge (OnGrid)
The maximum depth of discharge of the battery when
the system is working on-grid.
1
Battery
290
No.
Parameter
4
Depth of
Discharge (OffGrid)
5
Backup SOC
Holding
6
SOC Protection
Description
The maximum depth of discharge of the battery when
the system is working off-grid.
The battery will be charged to preset SOC protection
value by utility grid or PV when the system is running
on-grid, so that the battery SOC is sufficient to maintain
normal working when the system is off-grid.
Start battery protection when the battery capacity is
lower than the Depth of Discharge.
291
No.
Parameter
Description
This option is displayed on the interface when a battery
that supports heating is connected. After the battery
heating function is turned on, when the temperature is
below the value that starts up the battery, PV power or
electricity from the grid will be used to heat the battery.
Heating Mode:
• GW5.1-BAT-D-G20/GW8.3-BAT-D-G20
Low Power Mode: Maintains minimum battery
power input capacity, turns on when the
temperature is below -9℃, and turns off when the
temperature is above or equal to -7℃.
Medium Power Mode: to maintain the moderate
power input capacity of the battery. It will be turned
on when the temperature is less than 6℃, and
turned off when it is greater than or equal to 8℃.
High Power Mode: to maintain the higher power
input capacity of the battery. It will be turned on
when the temperature is less than 11℃, and turned
off when it is greater than or equal to 13℃.
• GW14.3-BAT-LV-G10
Low Power Mode: Maintains minimum battery
power input capacity, turns on when the
temperature is below 5℃, and turns off when the
temperature is above or equal to 7℃.
Medium Power Mode: to maintain the moderate
power input capacity of the battery. It will be turned
on when the temperature is less than 10℃, and
turned off when it is greater than or equal to 12℃.
High Power Mode: to maintain the higher power
input capacity of the battery. It will be turned on
when the temperature is less than 20℃, and turned
off when it is greater than or equal to 22℃.
○
○
7
Battery Heating
○
○
○
○
8
Daily Heating
Period
Set the battery heating time period according to actual
needs.
292
No.
Parameter
9
Battery Wake-up
After being turned on, the battery can be awakened
when it shuts down due to undervoltage protection.
Battery
Breathing Light
• Only applicable to inverters of ESA 3-10kW series. Set
the duration of the device's breathing light flashes.
Support: Normally open, normally closed, 3 minutes.
• The default mode is to turn on for three minutes after
powering up and then automatically turn off.
10
Description
Mode
293
No.
Parameter
Description
Set the working mode of the inverter according to
actual needs.
• Self-use Mode
BACK-UP Mode: Recommended for use in areas
with unstable power grids. When the grid is
disconnected, the inverter turns to off-grid mode
and the battery will supply power to the BACKUP
loads; when the grid is restored, the inverter
switches to grid-tied mode.
Economic Mode: It is recommended to use TOU
mode in scenarios when the peak-valley electricity
price varies a lot. Select TOU mode only when it
meets the local laws and regulations. Based on
actual needs, during off-peak hours, the battery
can be set to charging mode to purchase electricity
from the grid for charging; during peak hours, the
battery can be set to discharge mode to supply
power to the load through the battery.
• Delayed charging: Suitable for areas with grid
connection power output restrictions. By setting peak
power limits and charging time periods, photovoltaic
power generation that exceeds grid connection limits
can be used to charge batteries, reducing
photovoltaic waste.
• Demand-based electricity fee management: Mainly
applicable to scenarios where peak power
consumption is limited. When the total power
consumption of the load exceeds the power quota
within a short period of time, battery discharge can
be used to reduce the amount of power consumption
exceeding the quota.
○
○
11
Working Mode
12
On-Grid Power
Limitation
Enable Power Limit when power limiting is required by
local grid standards and requirements.
13
Maximum OnGrid Output
Power
Set the value based on the actual maximum power feed
into the utility grid.
294
No.
Parameter
14
Power Factor
15
Q(U)
16
COS(φ)
17
P(F)
Description
Set the power factor according to actual needs.
When Q(U) curves need to be set according to the
power grid standards of certain countries or regions,
enable this function.
When Cosφ curves need to be set according to the
power grid standards of certain countries or regions,
enable this function.
When P(F) curves need to be set according to the power
grid standards of certain countries or regions, enable
this function.
Others
18
Backup Supply
19
Shadow Scan
After enabling Backup, the battery will power the load
connected to the BACK-UP port of the inverter to ensure
Uninterrupted Power Supply when the power grid fails.
When photovoltaic panels are severely shaded,
enabling the shadow scanning function can optimize
the power generation efficiency of the inverter.
295
11 Maintenance
11.1 Power Off the System
DANGER
• Power off the equipment before operations and maintenance. Otherwise, the
equipment may be damaged or electric shocks may occur.
• Delayed discharge. Wait until the components are discharged after power off.
• Push the air switch to restart the battery.
• Strictly follow the power off requirements to avoid damaging the system.
• When there are multiple batteries in the system, powering off any one of the
batteries can power off all the batteries.
NOTICE
• Install the circuit breaker between the inverter and the battery or between the
two batteries in compliance with local laws and regulations.
• To ensure effective protection, the cover of the battery system switch should
remain closed. The cover can be closed automatically after being opened. Fasten
the cover with screws if the switch is not to be used for a long-term period.
Power down process
296
1. Turn off the ON-GRID circuit breaker.
2. Turn off the BACK-UP circuit breaker.
3. (Optional) Turn off the GEN circuit breaker.
4. (Selected in accordance with local laws and regulations) Turn off the switch
between the inverter and the battery.
5. Turn off the battery system switch.
297
• GW14.3-BAT-LV-G10: Disconnect the battery system switch, or press and hold the
multifunction switch for 3 seconds.
• LX A5.0-30: Press and hold the multifunction button for 1-4 seconds.
6. Turn off the DC switch of the inverter.
11.2 Removing the Equipment
DANGER
• Make sure that the equipment is powered off.
• Wear proper PPE during operations.
• Please use standard disassembly tools when removing wiring terminals to avoid
damaging the terminals or equipment.
• Unless otherwise specified, the dismantling process of the equipment is in
reverse order to the installation process, and it will not be further elaborated in
this document.
1. Power off the System.
2. Label the cables connected in the system with tags indicating the cable type.
3. Disconnect the connecting cables of the inverter, battery, and smart meter in the
system, such as DC cables, AC cables, communication cables, and PE cables.
4. Remove equipment such as the smart dongle, inverter, battery, and smart meter.
5. Properly store the equipment and ensure that the storage conditions meet the
requirements if it needs to be put into use later.
11.3 Disposing of the Equipment
If the equipment cannot work anymore, dispose of it according to the local disposal
requirements for electrical equipment waste. The equipment cannot be disposed of
together with household waste.
11.4 Routine Maintenance
WARNING
298
• Contact after-sales service for help if you find any problems that may influence
the battery or the hybrid inverter. Disassemble without permission is strictly
forbidden.
• Contact after-sales service for help if the copper conductor is exposed. Do not
touch or disassemble privately because high voltage danger exists.
• In case of other emergencies, contact the after-sales service as soon as possible.
Operate following the instructions or wait for the after-sales service personnel.
Maintainin
g Item
Maintaining Method
Maintainin
g Period
Maintaining
Purpose
System
Cleaning
Check the heat sink, air intake,
and air outlet for foreign
matter or dust.
Check whether the installation
space meets requirements and
whether there is any debris
around the device.
Once 6
months
Prevent heat
dissipation failures.
Once 6-12
months
Ensure that the
equipment is
installed securely.
Once 6-12
months
Confirm the
reliability of
electrical
connections.
Once a year
Confirm that the
machine seal and
waterproof
performance are
intact.
System
Installation
Electrical
Connection
Sealing
Check whether the equipment
are installed securely and
whether the screws are
installed tightly.
Check whether the equipment
is damaged or deformed.
Check whether the cables are
securely connected. Check
whether the cables are broken
or whether there is any
exposed copper core.
Check whether all the
terminals and ports are
properly sealed. Reseal the
cable hole if it is not sealed or
too big.
299
Maintainin
g Item
Maintaining Method
Maintainin
g Period
Maintaining
Purpose
Battery
Maintenanc
e
If the battery is not used for a
long time or is not fully
charged, it is recommended to
charge the battery regularly.
Once/15
days
Protect the battery's
lifespan.
11.5 Fault
11.5.1 Viewing Fault/Alarms Information
All fault and alarm details for the energy storage system are displayed on the
[SolarGo App], [SEMS+ APP], and LCD display.If your product malfunctions and you
do not see the relevant fault information on the [SolarGo App], [SEMS+ APP], or LCD
display, please contact the after-sales service center.
• Viewing method 1: LCD screen
Click or select the fault information icon
system alarms or fault information.
on the screen to view energy storage
• Viewing Method 2: SolarGo App
View energy storage system alarm information through Home>Parameters>Alarms.
• Method 3: SEMS+ APP
1. Open the SEMS+ App and log in with any account.
2. All power station fault information can be viewed through the Power Plant
>Alarm.
3. Click on the specific fault name to view detailed information about the fault: [time
of occurrence], [possible cause], and [solution].
11.5.2 Fault Information and Troubleshooting
Perform troubleshooting according to the following methods. Contact the after-sales
service if these methods do not work.
Collect the information below before contacting the after-sales service, so that the
problems can be solved quickly.
300
1. Product information like serial number, software version, installation date, fault
time, fault frequency, etc.
2. Installation environment, including weather conditions, whether the PV modules
are sheltered or shadowed, etc. It is recommended to provide some photos and
videos to assist in analyzing the problem.
3. Utility grid situation.
11.5.2.1 System Failure
If unlisted problems occur in the system, or if following the instructions does not
stop the problem or abnormality, stop operating the system immediately and contact
your dealer immediately.
No.
1
Fault
Unable to
search for the
wireless signal
of the smart
dongle.
Solutions/measures to address the issue
1. Please ensure that no other devices are connected to
the smart dongle's wireless signal.
2. Please ensure that the SolarGo app has been updated
to the latest version.
3. Please ensure that the smart dongle is powered on
properly, and the blue indicator light is blinking or
steady on.
4. Ensure that the smart device is within the
communication range of the smart dongle.
5. Refresh the device list in the app.
6. Restart the inverter.
2
Unable to
connect to the
wireless signal
of the smart
dongle.
1. Please ensure that no other devices are connected to
the smart dongle's wireless signal.
2. Restart the inverter or smart dongle, and try to
reconnect to the wireless signal of the smart dongle
again.
3. Ensure successful pairing of Bluetooth.
3
Cannot find
router SSID.
1. Put the router nearer to the Smart Dongle.Or add a
WiFi relay device to enhance the WiFi signal.
2. Reduce the number of devices connected to router.
301
No.
Fault
Solutions/measures to address the issue
1. Restart the inverter.
4
After
completing all
configurations,
the Smart
Dongle fails
connecting to
the router.
5
After
completing all
configurations,
the Smart
Dongle fails
connecting to
the router.
2. Check if the SSID, encryption method and password on
WiFi configuration page are the same with that of
Router.
3. Restart the router.
4. Put the router nearer to the Smart Dongle.Or add a
WiFi relay device to enhance the WiFi signal.
Restart the router and the inverter.
11.5.2.2 Inverter Troubleshooting
No.
1
Fault
Cause
Troubleshooting
Suggestions:
Grid Power Outage
1.Utility grid power
fails.
2.The AC circuit or
the AC breaker is
disconnected.
1.The alarm is automatically
cleared after the grid power
supply is restored.
2.Check whether the AC
cable is connected and the
AC breaker is on.
302
No.
Fault
Cause
Troubleshooting
Suggestions:
1.If the problem occurs
occasionally, the utility grid
may be abnormal
temporarily.The inverter will
recover automatically after
detecting that the utility grid
is normal.
2.If it occurs frequently,
please check if the grid
voltage is within the
allowable range.
2
Grid Overvoltage
The grid voltage is
higher than the
permissible range or
the high voltage
duration exceeds the
high voltage ridethrough setting.
• Contact the local power
company if the grid
voltage exceeds the
permissible range.
• Modify the overvoltage
protection threshold,
HVRT or disable the
overvoltage protection
function after obtaining
the consent of the local
power company if the grid
frequency is within the
permissible range.
3. Check whether the AC
breaker and the output
cables are connected
securely and correctly if the
problem persists.
303
No.
Fault
Cause
Troubleshooting
Suggestions:
1.If the problem occurs
occasionally, the utility grid
may be abnormal
temporarily.The inverter will
recover automatically after
detecting that the utility grid
is normal.
2.If it occurs frequently,
please check if the grid
voltage is within the
allowable range.
3
Grid Undervoltage
The grid voltage is
lower than the
permissible range,
or the duration of
low voltage exceeds
the requirement of
LVRT.
• Contact the local power
company if the grid
voltage exceeds the
permissible range.
• Modify the undervoltage
protection threshold, LVRT
or disable the
undervoltage protection
function after obtaining
the consent of the local
power company if the grid
frequency is within the
permissible range.
3. Check whether the AC
breaker and the output
cables are connected
securely and correctly if the
problem persists.
304
No.
Fault
Cause
Troubleshooting
Suggestions:
1.If the problem occurs
occasionally, the utility grid
may be abnormal
temporarily.The inverter will
recover automatically after
detecting that the utility grid
is normal.
2.If it occurs frequently,
please check if the grid
voltage is within the
allowable range.
4
Grid Overvoltage
Protection
The grid voltage is
detected to be
abnormal or
ultrahigh.
• Contact the local power
company if the grid
voltage exceeds the
permissible range.
• Modify the undervoltage
protection threshold, LVRT
or disable the
undervoltage protection
function after obtaining
the consent of the local
power company if the grid
frequency is within the
permissible range.
3. Check whether the AC
breaker and the output
cables are connected
securely and correctly if the
problem persists.
305
No.
5
Fault
Grid 10min
Overvoltage
Protection
Cause
The moving average
of grid voltage in
10min exceeds the
range of safety
requirements.
306
Troubleshooting
Suggestions:
1. If the problem occurs
occasionally, the utility
grid may be abnormal
temporarily.The inverter
will recover automatically
after detecting that the
utility grid is normal.
2. Check if the grid voltage is
running at a high voltage
for a long time.If it occurs
frequently, please check if
the grid voltage is within
the allowable range.
• Contact the local power
company if the grid
voltage exceeds the
permissible range.
• If the grid voltage is within
the allowable range,
please modify the Grid
10min Overvoltage
protection value with the
consent of the local power
operator.
No.
6
Fault
Grid overfrequency
protection
Cause
Utility grid
exception.The actual
grid frequency
exceeds the
requirement of the
local grid standard.
307
Troubleshooting
Suggestions:
1.If the problem occurs
occasionally, the utility grid
may be abnormal
temporarily.The inverter will
recover automatically after
detecting that the utility grid
is normal.
2.If the problem occurs
frequently, check whether
the grid frequency is within
the permissible range.
• Contact the local power
company if the grid
frequency exceeds the
permissible range.
• Modify the grid
overfrequency protection
threshold after obtaining
the consent of the local
power company if the grid
frequency is within the
permissible range.
No.
7
Fault
Grid underfrequency
protection
Cause
Utility grid
exception.The actual
grid frequency is
lower than the
requirement of the
local grid standard.
Troubleshooting
Suggestions:
1.If the problem occurs
occasionally, the utility grid
may be abnormal
temporarily.The inverter will
recover automatically after
detecting that the utility grid
is normal.
2.If the problem occurs
frequently, check whether
the grid frequency is within
the permissible range.
• Contact the local power
company if the grid
frequency exceeds the
permissible range.
Modify the grid
overfrequency protection
threshold after obtaining the
consent of the local power
company if the grid
frequency is within the
permissible range.
308
No.
8
Fault
Grid Frequency
Unstable
Cause
Utility grid
exception.The actual
grid frequency
change rate does
not meet the
requirement of the
local grid standard
309
Troubleshooting
Suggestions:
1.If the problem occurs
occasionally, the utility grid
may be abnormal
temporarily.The inverter will
recover automatically after
detecting that the utility grid
is normal.
2.If the problem occurs
frequently, check whether
the grid frequency is within
the permissible range.
• Contact the local power
company if the grid
frequency exceeds the
permissible range.
• Contact the dealer or the
after-sales service if the
grid frequency is within
the permissible range.
No.
9
Fault
Grid Phase Unstable
Cause
Utility grid
exception.Grid
voltage phase
change rates do not
meet local grid
standards.
310
Troubleshooting
Suggestions:
1.If the problem occurs
occasionally, the utility grid
may be abnormal
temporarily.The inverter will
recover automatically after
detecting that the utility grid
is normal.
2.If the problem occurs
frequently, check whether
the grid frequency is within
the permissible range.
• Contact the local power
company if the grid
frequency exceeds the
permissible range.
• Contact the dealer or the
after-sales service if the
grid frequency is within
the permissible range.
No.
10
11
Fault
Anti-islanding
Protection
LVRT Undervoltage
Cause
The utility grid is
disconnected.The
utility grid is
disconnected
according to the
safety regulations,
but the grid voltage
is maintained due to
the loads.
Utility grid
exception.The
duration of the grid
voltage abnormality
exceeds the time
specified for high
and low penetration.
311
Troubleshooting
Suggestions:
1.If the problem occurs
occasionally, the utility grid
may be abnormal
temporarily.The inverter will
recover automatically after
detecting that the utility grid
is normal.
2.If the problem occurs
frequently, check whether
the grid frequency is within
the permissible range.
• Contact the local power
company if the grid
frequency exceeds the
permissible range.
• Contact the dealer or the
after-sales service if the
grid frequency is within
the permissible range.
No.
12
13
14
15
Fault
HVRT Overvoltage
Grid Waveform
Abnormal
电⽹缺相保护
Grid Phase Loss
Grid Voltage
Imbalance
Cause
Troubleshooting
Suggestions:
Utility grid
exception.The
duration of the grid
voltage abnormality
exceeds the time
specified for high
and low penetration.
1.If the problem occurs
occasionally, the utility grid
may be abnormal
temporarily.The inverter will
recover automatically after
detecting that the utility grid
is normal.
2.If the problem occurs
frequently, check whether
the voltage and frequency of
the power grid are within
the permissible range and
stable.If no, contact the local
power operator; If yes,
please contact the local
service center.
Utility grid
exception.Abnormal
grid voltage
detection triggers a
fault.
Utility grid
exception.There is a
single phase drop in
the grid voltage.
Excessive differences
in grid phase
voltages.
312
1.If the problem occurs
occasionally, the utility grid
may be abnormal
temporarily.The inverter will
recover automatically after
detecting that the utility grid
is normal.
2.If it occurs frequently,
please check whether the
voltage and frequency of the
power grid are within the
permissible range and
stable, if not, please contact
your local power operator; if
yes, please contact your
dealer or after-sales service
center.
No.
16
17
18
19
Cause
Troubleshooting
Suggestions:
Grid Phase Sequence
Abnormal
Abnormal wiring of
inverter and grid:
wiring out of
sequence
1.Check whether the wiring
of Inverter and Utility grid is
in positive sequence.After
the wiring is corrected (e.g.,
by swapping any two phase
wires), the fault will
automatically disappear.
2.If the wiring is correct and
fault persists, please contact
the dealer or GoodWe
Customer Service Center.
Grid Rapid Shutdown
Protection
Quickly shut down
the output upon
detecting the grid
disconnected
operating condition..
1.The fault automatically
disappears after the grid
power supply is restored.
Neutral Line Loss
(Split Grid)
Phase separation
Utility grid neutral
line loss
1.The alarm is automatically
cleared after the grid power
supply is restored.
2.Check whether the AC
cable is connected and the
AC breaker is on.
EMS/Forced Off-Grid
EMS Issue a forced
off-grid command,
but the off-grid
function is not
enabled.
Enable off-grid function
Fault
313
No.
20
21
22
Fault
GFCI Protection
(30mA)
GFCI Protection
(60mA)
GFCI Protection
(150mA)
Cause
Troubleshooting
Suggestions:
The input insulation
impedance becomes
low when the
inverter is working.
1.If the problem occurs
occasionally, it may be
caused by a cable
exception.The inverter will
recover automatically after
the problem is solved.
2.Check whether the
impedance between the PV
string and PE is too low if
the problem occurs
frequently or persists.
The input insulation
impedance becomes
low when the
inverter is working.
1.If the problem occurs
occasionally, it may be
caused by a cable
exception.The inverter will
recover automatically after
the problem is solved.
2.Check whether the
impedance between the PV
string and PE is too low if
the problem occurs
frequently or persists.
The input insulation
impedance becomes
low when the
inverter is working.
1.If the problem occurs
occasionally, it may be
caused by a cable
exception.The inverter will
recover automatically after
the problem is solved.
2.Check whether the
impedance between the PV
string and PE is too low if
the problem occurs
frequently or persists.
314
No.
23
24
25
Fault
GFCI Protection
(300mA)
DCI Protection Level 1
DCI Protection Level 2
Cause
Troubleshooting
Suggestions:
The input insulation
impedance becomes
low when the
inverter is working.
1.If the problem occurs
occasionally, it may be
caused by a cable
exception.The inverter will
recover automatically after
the problem is solved.
2.Check whether the
impedance between the PV
string and PE is too low if
the problem occurs
frequently or persists.
The DC component
of the output current
exceeds the safety
range or default
range.
1.If the exception is caused
by an external fault, the
inverter will recover
automatically after solving
the problem.
2.If the problem occurs
frequently and the PV
station cannot work
properly, contact the dealer
or the after-sales service.
The DC component
of the output current
exceeds the safety
range or default
range.
1.If the exception is caused
by an external fault, the
inverter will recover
automatically after solving
the problem.
2.If the problem occurs
frequently and the PV
station cannot work
properly, contact the dealer
or the after-sales service.
315
No.
26
27
28
Cause
Troubleshooting
Suggestions:
Low Insulation
Resistance
1.The PV string is
short-circuited to PE.
2.The installation
environment of PV
strings is relatively
humid for a long
time and the
insulation of PE
cable is poor.
1.Check the impedance of
the PV string to the
ground.If there is a short
circuit phenomenon, please
check the short circuit point
and rectify it.
2.Check whether the PE
cable is connected correctly.
3.If it is confirmed that the
impedance is indeed lower
than the default value in
cloudy and rainy days,
please reset the "insulation
impedance protection
value".
Grounding Abnormal
1.The PE cable of the
inverter is not
connected.
2.When the output
of PV String is
grounded, the
output side of
Inverter is not
connected to an
isolation
transformer.
1.Please confirm if the PE
cable of the inverter is
properly connected.
2.In the scenario where the
output of PV String is
grounded, please confirm
whether an isolation
transformer is connected on
the output side of Inverter.
L-PE Short Circuit
Output phase line to
PE low impedance or
short circuit
Detect output phase line to
PE impedance, identify
locations with low
impedance and repair them.
Fault
316
No.
29
30
31
Fault
DCV Protection Level
1
DCV Protection Level
2
Hard Export Limit
Protection
Cause
Troubleshooting
Suggestions:
Abnormal
fluctuation of load
1.If the exception is caused
by an external fault, the
inverter will recover
automatically after solving
the problem.
2.If the problem occurs
frequently and the PV
station cannot work
properly, contact the dealer
or the after-sales service.
Abnormal
fluctuation of load
1.If the exception is caused
by an external fault, the
inverter will recover
automatically after solving
the problem.
2.If the problem occurs
frequently and the PV
station cannot work
properly, contact the dealer
or the after-sales service.
Abnormal
fluctuation of load
1.If the exception is caused
by an external fault, the
inverter will recover
automatically after solving
the problem.
2.If the problem occurs
frequently and the PV
station cannot work
properly, contact the dealer
or the after-sales service.
317
No.
Fault
Cause
Troubleshooting
Suggestions:
Internal Comm Loss
Reference specific
subcode reasons
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
33
Multiple GFCI Failures
North American
safety regulations
require multiple
failures can not be
automatically
recovered, you need
to manually or wait
for 24h recovery
1.Check if the PV String to
ground impedance is too
low.
34
North American
safety regulations
require multiple
failures can not be
Multiple AFCI Failures
automatically
recovered, you need
to manually or wait
for 24h recovery
35
Inverter external
device
communication loss,
may be peripheral
power supply
problems,
communication
protocol mismatch,
not configure the
appropriate
peripheral, etc..
32
External Comm Loss
318
1.After the machine is re-ongrid, check whether the
voltage current of each
circuit is abnormally reduced
to zero;
2.Check whether the DC side
terminal is securely
connected.
Judgement is based on the
actual model and the
detection enable bit, some
models do not support the
peripheral will not be
detected.
No.
36
37
38
39
Cause
Troubleshooting
Suggestions:
1.Prevent the
Inverter from
continuous overload
output.
1.Disconnect some off-grid
loads to reduce the off-grid
output Power of the
Inverter.
2.Prevent damage to
the load caused by
Inverter output
overvoltage.
1.If it occurs occasionally, it
may be caused by load
switching and does not
require manual intervention.
2.If the problem occurs
frequently, contact the
dealer or the after-sales
service.
On-grid PWM Sync
Fault
On-grid PWM Sync
Fault
Abnormal
occurrence in carrier
synchronization ongrid
1.Check if the
synchronization line
connection is normal.
2.Check whether the masterslave settings are normal.
3.Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
External Box Failure
Excessive waiting
time for Box cut
relay when switching
on-grid to off-grid
1.Check whether the Box is
working properly;
2.Check whether the Box
communication wiring is
correct;
Fault
Back-up Output
Overload
Back-up Output
Overvoltage
319
Cause
Troubleshooting
Suggestions:
1.This fault will
always be displayed
when the generator
is not connected.
2.During generator
operation, failure to
meet generator
safety regulations
will trigger this fault.
1.Ignore the fault when the
generator is not connected.
2.The occurrence of fault in
the generator under fault
conditions is normal.After
the generator recovers, wait
for a period of time, and the
fault will automatically clear.
3.The fault will not affect the
normal operation of the offgrid mode.
4.The generator and Utility
grid are connected
simultaneously and meet
the safety requirements,
with utility grid taking
priority for on-grid,
operating in the Utility grid
on-grid state.
External STS Failure
Inverter and STS
connection cable
abnormality
Check that the harness
connection wire sequence
between the inverter and
STS corresponds in one-toone sequence.
CT Loss
CT connecting wire
disconnection
(required by
Japanese safety
regulations)
1.Check whether the CT
wiring is correct;
No.
40
41
42
Fault
Generator Failure
320
No.
Fault
43
Export Limit
Protection
44
Bypass Over Load
45
Black Start Failure
Cause
Troubleshooting
Suggestions:
1.Inverter fault
reporting and grid
disconnection
2.Meter
communication
instability
3.Reverse flow
conditions occur
1.Check if there are any
other error messages in
Inverter.If so, perform
targeted troubleshooting.
2.Check if meter connection
is normal.
3.If the problem occurs
frequently and the PV
station cannot work
properly, contact the dealer
or the after-sales service.
Parallel
communication
cable is not securely
connected or parallel
operation IO Chip
damage
Parallel
communication
cable is not securely
connected or some
units are not online.
Check whether the parallel
communication cable is
firmly connected, and then
check whether the IO chip is
damaged, if so, replace the
IO chip.
Check whether all machines
are power on and whether
the parallel communication
cables are securely
connected.
46
Parallel I/O Check
Abnormal
47
Parallel CAN Comm
Abnormal
48
Parallel Grid Line
Reversed
/Paralell Grid Line
Reversed
Some machines have
grid wires reversed
Rewire the grid.
from others.
49
Parallel Back-up Line
Reversed
Some machines have
backup cables
Reconnect the backup cable.
reversed.
321
No.
Fault
50
Inverter Soft Start
Failure
51
Off grid AC Ins Volt
High
Cause
Inverter soft start
failure during offgrid cold start
52
AC HCT Check
Abnormal
The sampling of the
AC HCT is abnormal.
53
AC HCT Failure
The sampling of HCT
is abnormal.
54
GFCI HCT Check
Abnormal
The sampling of the
GFCI HCT is
abnormal.
322
Troubleshooting
Suggestions:
Check machine inverter
module for damage
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
No.
55
56
57
Fault
Cause
Troubleshooting
Suggestions:
GFCI HCT Failure
GFCI HCT is
abnormal.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Relay Check
Abnormal
Relay abnormal,
reasons are as
follows:
1.Relay abnormality
(relay short circuit)
2.The relay sampling
circuit is abnormal.
3.The AC cable is
connected
improperly, like a
virtual connection or
short circuit.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Relay Failure
1.Relay abnormality
(relay short circuit)
2.The relay sampling
circuit is abnormal.
3.The AC cable is
connected
improperly, like a
virtual connection or
short circuit.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
323
No.
58
59
60
Fault
Cause
Troubleshooting
Suggestions:
AFCI Failure (String
17~32)
1.The DC side
connection terminal
is loose;
2.The DC side
connection terminals
are falsely
connected;
3.The DC cable core
breakage and false
connection.
1.After the machine is re-ongrid, check whether the
voltage current of each
circuit is abnormally reduced
to zero;
2.Check whether the DC side
terminal is securely
connected.
AFCI Failure (String
33~48)
1.The DC side
connection terminal
is loose;
2.The DC side
connection terminals
are falsely
connected;
3.The DC cable core
breakage and false
connection.
1.After the machine is re-ongrid, check whether the
voltage current of each
circuit is abnormally reduced
to zero;
2.Check whether the DC side
terminal is securely
connected.
Flash R/W Abnormal
Causes are possibly
as follows:
Flash content has
changed; flash life is
exhausted;
1.Upgrade the latest version
of the program.
2.Contact the dealer or the
after-sales service.
324
No.
61
62
63
Fault
Cause
Troubleshooting
Suggestions:
AFCI Failure (String
1~16)
1.The DC side
connection terminal
is loose;
2.The DC side
connection terminals
are falsely
connected;
3.The DC cable core
breakage and false
connection.
1.After the machine is re-ongrid, check whether the
voltage current of each
circuit is abnormally reduced
to zero;
2.Check whether the DC side
terminal is securely
connected.
AFCI Check Failure
The arc-pulling
module does not
detect an arc-pulling
fault during the arcpulling self-test.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
AC Terminal
Overtemperature
AC terminal
temperature is too
high, causes are
possibly as follows:
1.The inverter is
installed in a place
with poor
ventilation.
2.The ambient
temperature
exceeds 60℃.
3.A fault occurs in
the internal fan of
the inverter.
325
No.
64
65
Fault
Cause
Cabinet
Overtemperature
Cavity temperature
is too high, causes
are possibly as
follows:
1.The inverter is
installed in a place
with poor
ventilation.
2.The ambient
temperature
exceeds 60℃.
3.A fault occurs in
the internal fan of
the inverter.
Inv Module
Overtemperature
Inverter module
temperature is too
high, causes are
possibly as follows:
1.The inverter is
installed in a place
with poor
ventilation.
2.The ambient
temperature
exceeds 60℃.
3.A fault occurs in
the internal fan of
the inverter.
326
Troubleshooting
Suggestions:
1.Check whether the
ventilation of the inverter
installation location is good
and whether the ambient
temperature exceeds the
maximum allowable
ambient temperature range.
2.If the ventilation is poor or
the ambient temperature is
too high, please improve the
ventilation and heat
dissipation conditions.
3.Contact the dealer or aftersales service if both the
ventilation and the ambient
temperature are normal.
No.
66
67
Fault
Cause
Boost Module
Overtemperature
Boost module
temperature is too
high, causes are
possibly as follows:
1.The inverter is
installed in a place
with poor
ventilation.
2.The ambient
temperature
exceeds 60℃.
3.A fault occurs in
the internal fan of
the inverter.
AC Capacitor
Overtemperature
Output filter
capacitor
temperature is too
high, causes are
possibly as follows:
1.The inverter is
installed in a place
with poor
ventilation.
2.The ambient
temperature
exceeds 60℃.
3.A fault occurs in
the internal fan of
the inverter.
327
Troubleshooting
Suggestions:
No.
68
69
70
Fault
Relay Failure 2
Cause
Troubleshooting
Suggestions:
Relay abnormal,
reasons are as
follows:
1.Relay abnormality
(relay short circuit)
2.The relay sampling
circuit is abnormal.
3.The AC cable is
connected
improperly, like a
virtual connection or
short circuit.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
PV IGBT Short Circuit
Causes are possibly
as follows:
1.IGBT short circuit
2.The inverter
sampling circuit is
abnormal.
PV IGBT Open Circuit
1.A software
problem caused the
wave not to be sent:
2.The drive circuit is
abnormal:
3.IGBT open circuit
328
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
No.
Fault
Cause
71
NTC Abnormal
Abnormal NTC
temperature sensor
72
PWM Abnormal
Abnormal waveform
appears in PWM
73
CPU Interrupt
Abnormal
CPU Interruption
anomaly occurred
74
Microelectronic
Failure
Functional safety
detects an anomaly.
329
Troubleshooting
Suggestions:
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
No.
Fault
Cause
75
PV HCT Failure
Abnormal boost
current sensor
76
1.5V Ref Abnormal
The reference circuit
is abnormal.
77
0.3V Ref Abnormal
The reference circuit
is abnormal.
78
CPLD Version Error
CPLD version
identification error
CPLD Comm Failure
CPLD and DSP
communication
content error or
timeout
79
330
Troubleshooting
Suggestions:
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
No.
Fault
80
Model Type Error
81
SVG Precharge Failure
82
SVG Mode PID
Prevention Failure
83
DSP Version Error
84
BUS Overvoltage
85
P-BUS Overvoltage
86
N-BUS Overvoltage
87
BUS Overvoltage
(Slave CPU 1)
BUS/Overvoltage(Slav
e CPU 1)
88
89
Cause
Troubleshooting
about model
recognition error
SVG Precharge
hardware failure
PID prevent
hardware anomaly
DSP version
identification error
Troubleshooting
Suggestions:
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Contact the dealer or the
after-sales service.
Contact the dealer or the
after-sales service.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
P-BUS Overvoltage
(Slave CPU 1)
N-BUS Overvoltage
(Slave CPU 1)
331
No.
90
91
92
93
94
95
Fault
Cause
BUS Overvoltage
(Slave CPU 2)
P-BUS Overvoltage
(Slave CPU 2)
N-BUS Overvoltage
(Slave CPU 2)
P-BUS Overvoltage
(CPLD)
BUS
overvoltage.Causes
are possibly as
follows:
1.The PV voltage is
too high.
2.The sampling of
the inverter BUS
voltage is abnormal.
3.The isolation of the
transformer of the
inverter is poor, so
two inverters
influence each other
when connected to
the grid.One of the
inverters reports DC
Overvoltage.
N-BUS Overvoltage
(CPLD)
MOS Continuous
Overvoltage
1.Software issue
causes the inverter
drive to shut down
earlier than the
flyback drive.
2.Inverter drive
circuit abnormality
causes failure to turn
on.
3.The PV voltage is
too high.
4.Mos sampling
anomaly.
332
Troubleshooting
Suggestions:
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
No.
96
97
98
Fault
Cause
Bus Short Circuit
1.The hardware is
damaged.
Bus Sample Abnormal
1.Bus voltage
sampling hardware
failure.
DC Sample Abnormal
1.Bus voltage
sampling hardware
failure.
2.Battery voltage
sampling hardware
failure.
3.Dcrly relay failure.
333
Troubleshooting
Suggestions:
If the inverter continues to
be off-grid after a BUS shortcircuit fault occurs, please
contact your dealer or aftersales service center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
No.
99
100
101
Fault
Cause
Troubleshooting
Suggestions:
PV Input Overvoltage
PV input voltage is
too high.Causes are
possibly as follows:
Incorrect
photovoltaic array
configuration, with
too many PV Battery
panels connected in
series in the string,
causing the string's
open-circuit voltage
to exceed the
maximum operating
voltage of the
Inverter.
Check the serial connection
of the PV array.Make sure
that the open circuit voltage
of the PV string is not higher
than the maximum
operating voltage of the
inverter.The inverter alarm
disappears automatically
when the PV array is
configured correctly.
PV Continuous
Hardware
Overcurrent
1.The module
configuration is not
proper.
2.The hardware is
damaged.
PV Continuous
Software Overcurrent
1.The module
configuration is not
proper.
2.The hardware is
damaged.
334
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
No.
102
103
104
Fault
Cause
FlyCap Software
Overvoltage
FlyCap
overvoltage.Causes
are possibly as
follows:
1.The PV voltage is
too high.
2.The sampling of
the inverter FlyCap
voltage is abnormal.
FlyCap Hardware
Overvoltage
FlyCap
overvoltage.Causes
are possibly as
follows:
1.The PV voltage is
too high.
2.The sampling of
the inverter FlyCap
voltage is abnormal.
FlyCap Undervoltage
FlyCap
undervoltage.Causes
are possibly as
follows:
1.PV Energy deficit;
2.The sampling of
the inverter FlyCap
voltage is abnormal.
335
Troubleshooting
Suggestions:
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
No.
Fault
Cause
FlyCap Precharge
Failure
FlyCap pre-charge
failure.Causes are
possibly as follows:
1.PV Energy deficit;
2.The sampling of
the inverter FlyCap
voltage is abnormal.
FlyCap Precharge
Abnormal
1.Unreasonable
control loop
parameters
2.The hardware is
damaged.
107
PV String Overcurrent
(String 1~16)
Causes are possibly
as follows:
1.String overcurrent.
2.String current
sensor abnormality.
108
PV String Overcurrent
(String 17~32)
As above.
109
PV String Reversed
(String 1~16)
The PV strings are
connected reversely.
105
106
336
Troubleshooting
Suggestions:
Check whether PV strings
are connected reversely.
Troubleshooting
Suggestions:
No.
Fault
Cause
110
PV String Reversed
(String 17~32)
The PV strings are
connected reversely.
Check whether PV strings
are connected reversely.
111
PV String Loss (String
1~16)
String fuse
disconnected (if
applicable).
Check if the fuse is blown.
112
PV String Loss (String
17~32)
String fuse
disconnected (if
applicable).
Check if the fuse is blown.
337
No.
113
Fault
Cause
Troubleshooting
Suggestions:
PV Input Mode Error
There are three
modes of PV access
modes, taking the
four-way MPPT as an
example:
1.Parallel mode: i.e.
AAAA mode
(homogenous
mode), PV1-PV4
homogenous, fourway PV connected to
the same PV panel.
2.Partial parallel
mode: i.e. AACC
mode, PV1 and PV2
are connected in the
same source, PV3
and PV4 are
connected in the
same source.
3.Independent
mode: i.e. ABCD
mode (nonhomologous), PV1,
PV2, PV3, PV4 are
connected
independently, and
each of the four-way
PV is connected to a
photovoltaic panel.
This fault is reported
if the actual access
mode of the PV does
not match the PV
Check that the PV access
mode is set correctly (ABCD,
AACC, AAAA) and reset the
PV access mode in the
correct way.
1.Confirm that the actual
access to each PV is properly
connected.
2.If the PV has been
connected correctly, check
whether the currently
set “PV Access Mode”
corresponds to the actual
access mode through APP or
screen.
3.If the currently set “PV
access mode” does not
match the actual access
mode, you need to set
the “PV access mode” to a
mode that matches the
actual situation through APP
or screen, and then
disconnect the PV and AC
power supply and restart
after the setup is completed.
4.After the setting is
completed, if the current "PV
access mode" is consistent
with the actual access mode,
but this fault is still reported,
please contact the dealer or
after-sales service center.
338
No.
Fault
Cause
Troubleshooting
Suggestions:
access mode set by
the device.
114
PV String Reversed
(String 33~48)
The PV strings are
connected reversely.
115
PV String Loss (String
33~48)
String fuse
disconnected (if
applicable).
116
117
PV String Overcurrent
(String 33~48)
BAT 1 Precharge
Failure
Causes are possibly
as follows:
1.String overcurrent.
2.String current
sensor abnormality.
Battery 1 precharge
circuit failure (burnt
precharge resistor,
etc.)
339
Check whether PV strings
are connected reversely.
Check if the fuse is blown.
As above.
Check whether the precharging circuit is good,
whether the battery voltage
and bus voltage are
consistent after powering up
the battery only, if not,
please contact the dealer or
GoodWe after-sales service
center.
No.
118
119
120
121
122
123
Cause
Troubleshooting
Suggestions:
BAT 1 Relay Failure
Battery 1 relay does
not operate
properly.
After the battery is powered
up, check if the battery relay
works and if you hear a
closing sound, if it does not
work, please contact your
dealer or GoodWe aftersales service center.
BAT 1 Overvoltage
Battery 1 access
voltage exceeds the
rated range of the
machine.
Verify that the battery
voltage is within the rated
range of the machine.
Fault
BAT 2 Precharge
Failure
Battery 2 precharge
circuit failure (burnt
precharge resistor,
etc.)
BAT 2 Relay Failure
Battery 2 relay does
not operate
properly.
BAT 2 Overvoltage
BAT 1 Reversed
Battery 2 access
voltage exceeds the
rated range of the
machine.
Battery 1 positive
and negative are
connected
reversedly.
340
Check whether the precharging circuit is good,
whether the battery voltage
and bus voltage are
consistent after powering up
the battery only, if not,
please contact the dealer or
GoodWe after-sales service
center.
After the battery is powered
up, check if the battery relay
works and if you hear a
closing sound, if it does not
work, please contact your
dealer or GoodWe aftersales service center.
Verify that the battery
voltage is within the rated
range of the machine.
Check the battery and
machine terminals for
positive and negative
consistency.
No.
Fault
124
BAT 2 Reversed
125
BAT Connection
Abnormal
125
127
Bat Overtemperature
Ref Voltage Abnormal
128
AC SPD Fault
129
DC SPD Fault
Cause
Battery 2 positive
and negative are
connected
reversedly.
Battery abnormal
connection
Battery temperature
is too high.Causes
are possibly as
follows:
1.The inverter is
installed in a place
with poor
ventilation.
2.The ambient
temperature
exceeds 60℃.
3.A fault occurs in
the internal fan of
the inverter.
The reference circuit
is abnormal.
AC side lightning
protection device
failure.
DC side lightning
protection device
failure.
341
Troubleshooting
Suggestions:
Check the battery and
machine terminals for
positive and negative
consistency.
Check whether the battery is
working properly.
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
Replace AC side lightning
protection devices.
Replace DC side lightning
protection devices.
No.
130
131
132
Fault
Cause
Internal Fan
Abnormal
Internal fan
abnormality.Causes
are possibly as
follows:
1.Abnormal fan
power supply.
2.Mechanical
exception (blocking).
3.Fan aging damage.
External Fan
Abnormal
External fan
abnormality.Causes
are possibly as
follows:
1.Abnormal fan
power supply.
2.Mechanical
exception (blocking).
3.Fan aging damage.
PID Abnormal
PID hardware failure
or high PV voltage
PID pause
342
Troubleshooting
Suggestions:
Disconnect the AC output
side switch and the DC input
side switch.After 5 minutes,
close the AC output side
switch and the DC input side
switch.If fault persists,
please contact the dealer or
GoodWe after-sales service
center.
PID pause warning caused
by high PV voltage does not
need to be dealt with, PID
hardware failure can be
cleared by turning the PID
switch off and on again to
clear the PID fault, replace
the PID unit.
No.
133
134
Fault
Cause
Trip-Switch Trip
Warning
Causes are possibly
as follows:
1.An overcurrent or
PV reversal has
occurred causing the
disconnect switch to
trip;
PV IGBT Short Circuit
Warning
Causes are possibly
as follows:
1.An overcurrent
occurs causing the
disconnect switch to
trip;
343
Troubleshooting
Suggestions:
Contact the dealer or the
after-sales service.The
reason for disconnection, for
the occurrence of PV short
circuit or reverse
connection, it is necessary to
check whether there is a
historical PV short circuit
warning or historical PV
reverse connection warning,
and if there is, it is necessary
for the maintenance
personnel to check the
corresponding PV
situation.After checking that
there are no faults you can
manually close the
disconnect switch and clear
this warning via the APP
interface clear history faults
operation.
Contact the dealer or the
after-sales
service.Maintenance
personnel need to follow the
historical PV short circuit
warning sub-code to check
whether there is any fault in
the short-circuited Boost
hardware and external
strings; after checking there
is no fault, the warning can
be cleared by clearing the
historical fault operation
through the APP interface.
No.
135
Fault
PV String Reversed
Warning (String 1~16)
Cause
Causes are possibly
as follows:
1.The PV reverse
connection has
occurred causing the
disconnecting switch
to trip;
136
PV String Reversed
Warning(String
17~32)
Causes are possibly
as follows:
1.The PV reverse
connection has
occurred causing the
disconnecting switch
to trip;
344
Troubleshooting
Suggestions:
Contact the dealer or the
after-sales
service.Maintenance
personnel need to follow the
historical PV reverse
connection warning subcode
to check whether the
corresponding string is
reverse connected and
whether there is pressure
difference in the PV panel
configuration; after the
check is complete and there
is no fault, the warning can
be cleared by clearing the
historical fault operation
through the APP interface.
Contact the dealer or the
after-sales
service.Maintenance
personnel need to follow the
historical PV reverse
connection warning subcode
to check whether the
corresponding string is
reverse connected and
whether there is pressure
difference in the PV panel
configuration; after the
check is complete and there
is no fault, the warning can
be cleared by clearing the
historical fault operation
through the APP interface.
Cause
Troubleshooting
Suggestions:
Flash R/W Error
Flash R/W Error
Causes are possibly
as follows:
Flash content has
changed; flash life is
exhausted;
1.Upgrade the latest version
of the program.
2.Contact the dealer or the
after-sales service.
138
Meter Comm Loss
This warning may be
reported after
enabling the antibackflow
function.Possible
causes:
1.Meter not
connected;
2.The
communication wire
connecting the
meter to the inverter
is wired incorrectly.
Check the wiring of the
meter and connect the
meter correctly, if the fault
still exists after checking,
contact the dealer or the
after-sales service.
139
PV Type Identification
Failure
PV panel recognizes
hardware anomaly
140
PV String Mismatch
PV string
mismatches.Two
sets of string opencircuit voltages
under the same
MPPT have different
configurations.
141
CT Loss
CT Loss
142
CT Reversed
CT Reversed
143
PE Loss
Ground wire not
connected.
No.
137
Fault
345
Contact the dealer or the
after-sales service.
Check the open-circuit
voltage of the two strings,
and configure the strings
with the same open-circuit
voltage under the same
MPPT, as long time string
mismatch is a potential
safety hazard.
Check whether the CT wiring
is correct;
Check whether the CT wiring
is correct;
Check the ground wire.
No.
Fault
144
PV String Terminal
Overtemperature
(String 1~8)
145
PV String Terminal
Overtemperature
(String 9~16)
146
PV String Terminal
Overtemperature
(String 17~20)
147
PV String Reversed
Warning (String
33~48)
148
Battery 1 low voltage
149
Battery 2 low voltage
Cause
Troubleshooting
Suggestions:
37176 Register PV
Terminal
Temperature Alarm
Subcode 1 has a set
position.
37177 Register PV
Terminal
Temperature Alarm
Subcode 2 has a set
position.
37178 Register PV
Terminal
Temperature Alarm
Subcode 3 has a set
position.
Causes are possibly
as follows:
1.The PV reverse
connection has
occurred causing the
disconnecting switch
to trip;
Battery voltage
below set value.
Battery voltage
below set value.
346
Contact the distributor or
after-sales service center;
Maintenance personnel
need to follow the historical
PV reverse connection
warning subcode to check
whether the corresponding
string is reverse connected
and whether there is
pressure difference in the PV
panel configuration; after
the check is complete and
there is no fault, the warning
can be cleared by clearing
the historical fault operation
through the APP interface.
No.
150
Fault
Cause
Low battery supply
voltage
Troubleshooting
Suggestions:
Battery not
charging, voltage
below shutdown
voltage
11.5.2.3 Battery Fault (LX A5.0-30)
Alarm state
When the battery ALM indicator turns red, troubleshoot the issue by referring to
the SOC indicator's display status.
No.
1
SOC
Indicator
Fault
Solutions/measures to address the issue
Battery
overvoltage
protection
Battery
undervoltage
protection
1. Check whether the Charging Current
Limit of the inverter is 0 through SolarGo.
If yes, please confirm whether the
communication cable connection
between the battery and the inverter is
reliable and the communication is normal.
2. Power off and wait for 5 minutes, then
restart to confirm if the fault persists.
3. If the fault is not restored, please contact
the after-sales service center.
347
No.
2
3
4
SOC
Indicator
Fault
Solutions/measures to address the issue
Overcurrent
protection
1. Check if the battery model is correct
through SolarGo and confirm if the realtime current of the battery is greater than
the Charging/Discharging Current Limit.
Please contact the after-sales service
center.
2. When it is less than the
Charging/Discharging Current Limit., turn
off the battery or upgrade the program,
restart to confirm whether the fault
persists.
3. If the fault is not restored, please contact
the after-sales service center.
Over
temperature
protection
Low
temperature
protection
Pole over
temperature
protection
Balancing fault
Low SOH fault
5
Precharge
failure
6
Wire harness
exception
Power off and wait for 60 minutes, wait for
the temperature to recover. If the problem
persists after restarting, please contact the
after-sales service center.
Power off and wait for 30 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
1. Confirm if the battery output terminal is
connected in reverse to the inverter.
2. Power off and wait for 30 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
Confirm if the battery switch is closed. If the
battery switch is closed and the problem
still exists. Please contact the after-sales
service center.
348
No.
7
SOC
Indicator
Fault
Solutions/measures to address the issue
Relay or MOS
over
temperature
Diverter over
temperature
Power off and wait for 30 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
Other BMS
faults: output
port over
temperature
fault
1. Check if the battery power cable is
connected tightly.
Power off and wait for 5 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
Other
protections:
MOS cannot be
closed
Other
protections:
MOS adhesion
Power off and wait for 5 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
10
Other
protections:
Cluster Fault
1. Confirm whether the type and installation
position of the terminal resistor used are
correct.
2. Confirm whether the communication
cable between batteries, the cable
between batteries and inverters are
reliable and the communication is normal.
3. If the fault is not restored, please contact
the after-sales service center.
11
1. Confirm whether the communication
Other
cable between batteries, the cable
protections:
between batteries and inverters are
Communication
reliable and the communication is normal.
loss with
2. If the fault is not restored, please contact
inverter
the after-sales service center.
8
9
349
No.
12
13
14
15
SOC
Indicator
Fault
Solutions/measures to address the issue
Other
protections:
BMU
communication
failure
1. Confirm whether the type and installation
position of the terminal resistor used are
correct.
2. Confirm whether the communication
cable between batteries, the cable
between batteries and inverters are
reliable and the communication is normal.
3. Power off and wait for 5 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
Other
protections: Air
switch
adhesion fault
Other
protections:
software fault
Other
protections:
Hardware
overcurrent
fault
Other
protections:
Microelectronic
s fault
16
Power off and wait for 5 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
Restart the battery. If the problem persists
after restarting, please contact the aftersales service center.
1. Upgrade software
Heating film
abnormal
2. Power off and wait for 5 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
11.5.2.4 Battery Fault (GW14.3-BAT-LV-G10)
When the battery alarm indicator light turns red
350
, the outer marquee flashes
red, and the operation light turns off, combine the SOC indicator light display status
to locate and troubleshoot the fault.
No.
SOC
Indicator
Fault
Battery
overvoltage
protection
1
2
Battery
undervoltage
protection
Overcurrent
protection
Over
temperature
protection
3
Low
temperature
protection
Pole over
temperature
protection
4
Solutions/measures to address the
issue
1. Check whether the inverter charging
current limit is 0 via SolarGo. If it is 0,
confirm that the communication line
between the battery and the inverter is
connected reliably and that communication
is normal.
2. Shut down and leave for 5 minutes, then
restart and confirm whether the fault
persists.
3. If the fault is not restored, please contact
the after-sales service center.
1. Check the battery model through
SolarGo to confirm whether the real-time
current of the battery is greater than the
charging current limit or discharge current
limit value. If so, please contact the aftersales service center.
2. If the current is less than the limit, shut
down the battery or upgrade the program,
then restart to confirm whether the fault
persists.
3. If the fault is not resolved, please contact
after-sales service.
Power off and wait for 60 minutes, wait for
the temperature to recover. If the problem
persists after restarting, please contact the
after-sales service center.
Balancing fault
351
Low SOH fault
5
Precharge
failure
6
Wire harness
exception
Relay or MOS
over
temperature
7
Output port
overheating
8
MOS OpenCircuit Fault
9
MOS adhesion
10
Cluster Fault
Power off and wait for 30 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
1. Check whether the battery output
terminal is connected to the inverter in
reverse.
2. Shut down and wait for 5 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
Check whether the battery circuit breaker
is closed. If the battery circuit breaker is
closed and the problem persists, please
contact the after-sales service center.
Power off and wait for 30 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
1. Check whether the battery power cord is
securely connected.
2. Turn off the device and leave it for 5
minutes. If the problem persists after
restarting, please contact the after-sales
service center.
Power off and wait for 5 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
1. Confirm that the type and installation
location of the terminal resistor are correct.
2. Confirm that the communication lines
between batteries and between batteries
and inverters are connected reliably and
that communication is normal.
3. If the fault persists, please contact the
after-sales service center.
352
11
Inconsistent
software and
hardware
versions
12
BMU
communicatio
n fault
13
Open contact
sticking fault
14
Software fault
15
Hardware
overcurrent
fault
Restart the battery. If the problem persists
after restarting, please contact the aftersales service center.
Power off and wait for 5 minutes. If the
problem persists after restarting, please
contact the after-sales service center.
Restart the battery. If the problem persists
after restarting, please contact the aftersales service center.
Microelectroni
c Fault
16
Heating film
abnormal
1. Upgrade the software.
2. Shut down the computer and leave it idle
for 5 minutes. If the problem persists after
restarting, please contact the after-sales
service center.
11.5.3 Operation After Fault Clearance
In the energy conservation system, after some fault clearances complete, further
operations are needed for the system to restore normal work.
11.5.3.1 Clear AFCI Alarm
[Software]: SolarGo App
[Clearance method]
1. Home > Settings > Advanced Settings > DC AFCI
2. Tap [Clear AFCI Alarm].
353
354
12 Technical Parameters
12.1 Inverter Parameters
Technical Data
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
Battery Type *1
LFP (LiFePO₄) /Leadacid
LFP (LiFePO₄) /Leadacid
LFP (LiFePO₄) /Leadacid
Nominal
Battery Voltage
(V)
48
48
48
Battery voltage
range (V)
40~60
40~60
40~60
Start-up
Voltage (V)
30
30
30
Number of
Battery Input
1
1
1
Max.
Continuous
Charging
Current (A)
135
175
220
Max.
Continuous
Discharging
Current (A)
135
175
220
Max Charging
Power (kW)
6
8
10
Max
Discharging
Power (kW)
6.6
8.8
11
12
16
20
Battery Side
PV Side
Max. Input
Power (kW)
355
Technical Data
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
Max. Input
Voltage (V) *2
1000
1000
1000
MPPT
Operating
Voltage Range
(V) *3
150-850
150-850
150-850
MPPT
Operating
Voltage Range
at Nominal
Power (V)
300~850
300~850
300~850
Start-up
Voltage (V)
180
180
180
Nominal Input
Voltage (V)
620
620
620
Max. MPPT
Current (A)
20/20
20/20
20/20/20
Max. MPPT
Short Circuit
Current(A)
26/26
26/26
26/26/26
Number of
MPPTs
2
2
3
Number of
Strings per
MPPT
1+1
1+1
1+1+1
Nominal Power
(kW)
6.0
8.0
10.0
Max. Power
(kW)
6.6
8.8
11.0
Nominal Power
at 40 ℃ (kW)
6.0
8.0
10.0
AC Side (On-grid)
356
Technical Data
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
Max. Power at
40 ℃ (kW) *5
6.0
8.0
10.0
Nominal
Apparent
Power Output
to Grid (kVA)
6.0
8.0
10.0
Max. Apparent
Power to Utility
Grid (kVA)
6.6
8.8
11.0
Nominal
Apparent
Power from
Grid(kVA)
6.0
8.0
10.0
Max. Apparent
Power from
Grid (kVA)
48.3
48.3
48.3
400/380, 3L/N/PE
400/380, 3L/N/PE
400/380, 3L/N/PE
Voltage Range
(V)
170~290
170~290
170~290
Nominal
Frequency (Hz)
50/60
50/60
50/60
Frequency
Range (Hz)
45~65
45~65
45~65
Max. Current to
Grid (A)
9.6@230V
10@220V
12.8@230V
13.4@220V
15.9@230V
16.7@220V
Max. Current
From Grid (A)
70
70
70
Nominal
Current From
Grid (A)
9.1@220V
8.7@230V
12.1@220V
11.6@230V
15.2@220V
14.5@230V
Nominal
Voltage (V)
357
Technical Data
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
Max. Output
Fault Current
(Peak and
Duration) (A)
99
99
99
Inrush Current
(Peak and
Duration) (A)
300A/2ms
300A/2ms
300A/2ms
Nominal
Current to Grid
(A)
9.1@220V
8.7@230V
12.1@220V
11.6@230V
15.2@220V
14.5@230V
Power Factor
~1 (Adjustable
from0.8 leading~0.8
lagging)
~1 (Adjustable
from0.8 leading~0.8
lagging)
~1 (Adjustable
from0.8 leading~0.8
lagging)
THDI
<3%
<3%
<3%
Maximum
Output
Overcurrent
Protection (A)
70
70
70
Type of voltage
a.c.
a.c.
a.c.
Nominal
Output
Apparent
Power (kVA)
6.0
8.0
10.0
Max. Output
Apparent
Power(VA)
6.6 (12.0, 10s)
8.8 (16.0, 10s )
11.0 (20.0, 10s )
Max. Output
Apparent
Power with
Grid (kVA)
48.3
48.3
48.3
Back-up Side
358
Technical Data
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
Nominal
Output Current
(A)
9.1@220V
8.7@230V
12.1@220V
11.6@230V
15.2@220V
14.5@230V
Max Output
Current(Byapss
)
70
70
70
Max. Fault
Current (Peak
and Duration)
(A)
99A/100ms
99A/100ms
99A/100ms
Inrush Current
(Peak and
Duration) (A)
300A/2ms
300A/2ms
300A/2ms
Maximum
Overcurrent
Protection (A)
70
70
70
Nominal
Output Voltage
(V)
400/380, 3L/N/PE
400/380, 3L/N/PE
400/380, 3L/N/PE
Nominal
Output
Frequency (Hz)
50/60
50/60
50/60
Nominal
Apparent
Power (kVA)
20.0
20.0
20.0
Max. Apparent
Power (kVA)
20.0
20.0
20.0
Nominal
Voltage (V)
400/380
400/380
400/380
Input Voltage
Range (V)
170~290
170~290
170~290
Nominal
Frequency (Hz)
50/60
50/60
50/60
Generator Side
359
Technical Data
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
Frequency
Range (Hz)
45~55/55~65
45~55/55~65
45~55/55~65
Max. Current
(A)
30.3
30.3
30.3
Max. Efficiency
97.8%
97.8%
97.8%
European
Efficiency
97.0%
97.1%
97.3%
Max. Battery to
AC Efficiency
95.5%
95.5%
95.5%
MPPT
Efficiency
99.9%
99.9%
99.9%
PV String
Current
Monitoring
Integrated
Integrated
Integrated
PV Insulation
Resistance
Detection
Integrated
Integrated
Integrated
Residual
Current
Monitoring
Integrated
Integrated
Integrated
PV Reverse
Polarity
Protection
Integrated
Integrated
Integrated
Battery
Reverse
Polarity
Protection
Optional
Optional
Optional
Anti-islanding
Protection
Integrated
Integrated
Integrated
AC Overcurrent
Protection
Integrated
Integrated
Integrated
Efficiency
Protection
360
Technical Data
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
AC Short Circuit
Protection
Integrated
Integrated
Integrated
AC Overvoltage
Protection
Integrated
Integrated
Integrated
DC Switch
Integrated
Integrated
Integrated
AC Switch
NA
NA
NA
DC Surge
Protection
Type II
Type II
Type II
AC Surge
Protection
Type II
Type II
Type II
AFCI *8
Optional
Optional
Optional
Rapid
Shutdown
Optional
Optional
Optional
Remote
Shutdown
Integrated
Integrated
Integrated
Operating
Temperature
Range (℃)
-35~+60
-35~+60
-35~+60
Operating
Environment
Outdoor
Outdoor
Outdoor
Relative
Humidity
0~95%
0~95%
0~95%
4000
4000
4000
Smart Fan Cooling
Smart Fan Cooling
Smart Fan Cooling
User Interface
LCD
LCD
LCD
Communicatio
n with BMS
CAN
CAN
CAN
General Data
Max. Operating
Altitude (m)
Cooling
Method
361
Technical Data
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
Communicatio
n
WIFI+LAN+Bluetoot
h, 4G, RS486, CAN
WIFI+LAN+Bluetoot
h, 4G, RS487, CAN
WIFI+LAN+Bluetoot
h, 4G, RS488, CAN
Communicatio
n Ptotocols
Modbus RTU(RS485),
Modbus
TCP/IP(Ethernet),
Sunspec Modbus
RTU
Modbus RTU(RS485),
Modbus
TCP/IP(Ethernet),
Sunspec Modbus
RTU
Modbus RTU(RS485),
Modbus
TCP/IP(Ethernet),
Sunspec Modbus
RTU
Weight (kg)
42.2
42.2
45.3
Dimension (
W×H×D mm)
756**551*258
756**551*258
756**551*258
Noise Emission
(dB)
<45
<45
<45
Non-isolated
Non-isolated
Non-isolated
Power Selfconsumption at
Night (W)
<15
<15
<15
Ingress
Protection
Rating
IP66
IP66
IP66
Anti-corrosion
Class
C4
C4
C4
DC Connector
MC4
MC4
MC4
AC Connector
Tube Terminal
Tube Terminal
Tube Terminal
Environmental
Category
4K4H
4K4H
4K4H
III
III
III
Overvoltage
Category
DC II / AC III
DC II / AC III
DC II / AC III
Protective
Class
I
I
I
Topology
Pollution
Degree
362
Technical Data
GW6K-ET-L-G10
GW8K-ET-L-G10
GW10K-ET-L-G10
Storage
Temperature
(℃)
-40~+85
-40~+85
-40~+85
Battery:A PV:C
Battery:A PV:C
Battery:A PV:C
AC:C Com:A
AC:C Com:A
AC:C Com:A
Mounting
Method
Wall Mounted
Wall Mounted
Wall Mounted
Active Antiislanding
Method
AFDPF + AQDPF *9
AFDPF + AQDPF *9
AFDPF + AQDPF *9
Type of
Electrical
Supply System
Three phase Grid
Three phase Grid
Three phase Grid
Country of
Manufacture
China
China
China
Decisive
Voltage
Classification
(DVC)
Certification
Grid Standards
NRS 097-2-1, IEC 62116, IEC 61727, IEC 61683, IEC 62891, IEC
60068, EN50530
Safety
Regulation
EMC
Technical Data
IEC 62109-1, IEC 62109-2
IEC 62920, IEC 61000-6-2, IEC 61000-6-4, IEC 61000-2-2,EN300328,
EN 301489, EN IEC 62311,EN62479
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
Battery Type *1
LFP (LiFePO₄)
/Lead-acid
LFP (LiFePO₄)
/Lead-acid
LFP (LiFePO₄)
/Lead-acid
Nominal Battery
Voltage (V)
48
48
48
Battery Side
363
Technical Data
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
Battery voltage
range (V)
40~60
40~60
40~60
Start-up Voltage
(V)
30
30
30
Number of Battery
Input
1
2
2
Max. Continuous
Charging Current
(A)
250
165/165
208/208
Max. Continuous
Discharging
Current (A)
250
165/165
208/208
Max Charging
Power (kW)
12
15
20
Max Discharging
Power (kW)
13.2
16.5
22
Max. Input Power
(kW)
24
30
40
Max. Input Voltage
(V) *2
1000
1000
1000
150-850
150-850
150-850
300~850
350~850
350~850
PV Side
MPPT Operating
Voltage Range (V)
*3
MPPT Operating
Voltage Range at
Nominal Power (V)
364
Technical Data
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
Start-up Voltage
(V)
180
180
180
Nominal Input
Voltage (V)
620
620
620
Max. MPPT
Current (A)
20/20/20
20/20/20/20
20/20/20/20
Max. MPPT Short
Circuit Current (A)
26/26/26
26/26/26/26
26/26/26/26
Number of MPPTs
3
4
4
Number of Strings
per MPPT
1+1+1
1+1+1+1
1+1+1+1
Nominal Power
(kW)
12.0
15.0
20.0
Max. Power (kW)
13.2*4
16.5*4
22.0*4
Nominal Power at
40 ℃ (kW)
12.0
15.0
20.0
Max. Power at
40 ℃ (kW) *5
12.0
15.0
20.0
Nominal Apparent
Power Output to
Grid (kVA)
12.0
15.0
20.0
Max. Apparent
Power to Utility
Grid (kVA)
13.2
16.5
22.0
AC Side (On-grid)
365
Technical Data
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
Nominal Apparent
Power from
Grid(kVA)
12.0
15.0
20.0
Max. Apparent
Power from Grid
(kVA)
48.3
48.3
48.3
Nominal Voltage
(V)
400/380, 3L/N/PE
400/380, 3L/N/PE
400/380, 3L/N/PE
Voltage Range (V)
170~290
170~290
170~290
Nominal
Frequency (Hz)
50/60
50/60
50/60
Frequency Range
(Hz)
45~65
45~65
45~65
19.1@230V *6
23.9@230V *6
31.9@230V*6
20@220V
25@220V
33.3@220V
Max. Current From
Grid (A)
70
70
70
Nominal Current
From Grid (A)
18.2@220V
17.4@230V
22.7@220V
21.7@230V
30.3@220V
29@230V
Max. Output Fault
Current (Peak and
Duration) (A)
99
99
99
Inrush Current
(Peak and
Duration) (A)
300A/2ms
300A/2ms
300A/2ms
Nominal Current
to Grid (A)
18.2@220V
17.4@230V
22.7@220V
21.7@230V
30.3@220V
29.0@230V
Max. Current to
Grid (A)
366
Technical Data
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
Power Factor
~1 (Adjustable
from0.8
leading~0.8
lagging)
~1 (Adjustable
from0.8
leading~0.8
lagging)
~1 (Adjustable
from0.8
leading~0.8
lagging)
THDI
<3%
<3%
<3%
Maximum Output
Overcurrent
Protection (A)
70
70
70
Type of voltage
a.c.
a.c.
a.c.
12.0
15.0
20.0
13.2 (24.0, 10s)
16.5 (30.0, 10s)
22.0 (40.0, 10s)
Max. Output
Apparent Power
with Grid (kVA)
48.3
48.3
48.3
Nominal Output
Current (A)
18.2@220V
17.4@230V
22.7@220V
21.7@230V
30.3@220V
29@230V
Max Output
Current (Byapss)
70
70
70
Max. Fault Current
(Peak and
Duration) (A)
99A/100ms
99A/100ms
99A/100ms
Back-up Side
Nominal Output
Apparent Power
(kVA)
Max. Output
Apparent
Power(VA)
367
Technical Data
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
Inrush Current
(Peak and
Duration) (A)
300A/2ms
300A/2ms
300A/2ms
Maximum
Overcurrent
Protection (A)
70
70
70
Nominal Output
Voltage (V)
400/380, 3L/N/PE
400/380, 3L/N/PE
400/380, 3L/N/PE
Nominal Output
Frequency (Hz)
50/60
50/60
50/60
Nominal Apparent
Power (kVA)
20.0
20.0
20.0
Max. Apparent
Power (kVA)
20.0
20.0
20.0
Nominal Voltage
(V)
400/380
400/380
400/380
Input Voltage
Range (V)
170~290
170~290
170~290
Nominal
Frequency (Hz)
50/60
50/60
50/60
Frequency Range
(Hz)
45~55/55~65
45~55/55~65
45~55/55~65
Max. Current (A)
30.3
30.3
30.3
Max. Efficiency
97.8%
97.9%
97.8%
European
Efficiency
97.3%
97.3%
97.4%
Max. Battery to AC
Efficiency
95.5%
95.5%
95.5%
Generator Side
Efficiency
368
Technical Data
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
MPPT Efficiency
99.9%
99.9%
99.9%
PV String Current
Monitoring
Integrated
Integrated
Integrated
PV Insulation
Resistance
Detection
Integrated
Integrated
Integrated
Residual Current
Monitoring
Integrated
Integrated
Integrated
PV Reverse Polarity
Protection
Integrated
Integrated
Integrated
Battery Reverse
Polarity Protection
Optional *7
Optional *7
Optional *7
Anti-islanding
Protection
Integrated
Integrated
Integrated
AC Overcurrent
Protection
Integrated
Integrated
Integrated
AC Short Circuit
Protection
Integrated
Integrated
Integrated
AC Overvoltage
Protection
Integrated
Integrated
Integrated
DC Switch
Integrated
Integrated
Integrated
AC Switch
NA
NA
NA
DC Surge
Protection
Type II
Type II
Type II
AC Surge
Protection
Type II
Type II
Type II
AFCI *8
Optional
Optional
Optional
Protection
369
Technical Data
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
Rapid Shutdown
Optional
Optional
Optional
Remote Shutdown
Integrated
Integrated
Integrated
Operating
Temperature
Range (℃)
-35~+60
-35~+60
-35~+60
Operating
Environment
Outdoor
Outdoor
Outdoor
Relative Humidity
0~95%
0~95%
0~95%
Max. Operating
Altitude (m)
4000
4000
4000
Cooling Method
Smart Fan Cooling
Smart Fan Cooling
Smart Fan Cooling
User Interface
LCD
LCD
LCD
Communication
with BMS
CAN
CAN
CAN
Communication
WIFI+LAN+Bluetoo
th, 4G, RS489, CAN
WIFI+LAN+Bluetoo
th, 4G, RS490, CAN
WIFI+LAN+Bluetoo
th, 4G, RS492, CAN
Modbus
RTU(RS485),
Modbus
RTU(RS485),
Modbus
RTU(RS485),
Modbus
TCP/IP(Ethernet),
Sunspec Modbus
RTU
Modbus
TCP/IP(Ethernet),
Sunspec Modbus
RTU
Modbus
TCP/IP(Ethernet),
Sunspec Modbus
RTU
Weight (kg)
45.3
49.7
51.2
Dimension (
W×H×D mm)
756**551*258
756**551*258
756**551*258
Noise Emission
(dB)
<45
<45
<45
General Data
Communication
Ptotocols
370
Technical Data
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
Non-isolated
Non-isolated
Non-isolated
Power Selfconsumption at
Night (W)
<15
<15
<15
Ingress Protection
Rating
IP66
IP66
IP66
Anti-corrosion
Class
C4
C4
C4
DC Connector
MC4
MC4
MC4
AC Connector
Tube Terminal
Tube Terminal
Tube Terminal
Environmental
Category
4K4H
4K4H
4K4H
Pollution Degree
III
III
III
DC II / AC III
DC II / AC III
DC II / AC III
Protective Class
I
I
I
Storage
Temperature (℃)
-40~+85
-40~+85
-40~+85
Battery:A PV:C
Battery:A PV:C
Battery:A PV:C
AC:C Com:A
AC:C Com:A
AC:C Com:A
Mounting Method
Wall Mounted
Wall Mounted
Wall Mounted
Active Antiislanding Method
AFDPF + AQDPF *9
AFDPF + AQDPF *9
AFDPF + AQDPF *9
Type of Electrical
Supply System
Three phase Grid
Three phase Grid
Three phase Grid
Topology
Overvoltage
Category
Decisive Voltage
Classification
(DVC)
371
Technical Data
GW12K-ET-L-G10
GW15K-ET-L-G10
GW20K-ET-L-G10
Country of
Manufacture
China
China
China
Certification
Grid Standards
NRS 097-2-1, IEC 62116, IEC 61727, IEC 61683, IEC 62891, IEC
60068, EN50530
Safety Regulation
IEC 62109-1, IEC 62109-2
EMC
IEC 62920, IEC 61000-6-2, IEC 61000-6-4, IEC 61000-22,EN300328, EN 301489, EN IEC 62311,EN62479
*1: The Li-lon battery usually contain two mainstream type: LFP and Ternary Lithium
battery.
*2: When the input voltage is greater than 980V, the inverter will enter standby
mode, and when the voltage returns to below 950V the inverter will return to normal
operation.
*3: Please refer to the user manual for the MPPT Voltage Range at Nominal Power.
*4: For Brazil, the Max. power is the same with the Nominal Power.
*5: For Brazil, the Active Output Power is not allowed to exceed the Nominal Power.
*6: For Brazil, for GW12K-ET-L-G10, GW15K-ET-L-G10 and GW20K-ET-L-G10, the Max.
Current to Grid is 18.2A@220V, 22.7A@220V and 30.3A@220V respectively.
*7: For Brazil, for GW12K-ET-L-G10, GW15K-ET-L-G10 and GW20K-ET-L-G10, the
Battery Reverse Polarity Protection is integrated.
*8: AFCI is integrated in Brazil.
*9: AFDPF: Active Frequency Drift with Positive Feedback, AQDPF: Active Q Drift with
Positive Feedback.
12.2 Battery Technical Data
12.2.1 LX A5.0-30
Technical Parameters
Nominal Capacity
(kWh)
Usable Energy (kWh) *1
LX A5.0-30
Cell Type
LFP (LiFePO4)
5.12
5
372
Technical Parameters
Operating Voltage
Range (V)
Nominal Charge
Current (A)*2
Max. Charge Current
(A) *2*3
Nominal Discharge
Current (A)*3
Max. Discharge Current
(A) *2*3
Max. Pulse Discharge
Current (A)
Max. Discharge Power
(W) *2 *3
Communication
Operating
Temperature (℃)
LX A5.0-30
43.2~ 58.24
60
90
100
150
<200 (30s)
7200
CAN
Charge: 0<T≤55℃
Discharge: -20<T≤55℃
Max. Storage Time
Max. Operating
Altitude (m)
Weight (kg)
12 Months (maintenance-free)
Dimension (W×H×D
mm)
442/133* 520 (core part)
483/133* 559 (max. dimensions)
Ingress Protection
Rating
IP20
Scalability
Mounting Method
4000
44
Supports up to 30 in parallel connection (150kWh) (Handin-hand/Busbar)
standard rack/floor mounted, wall-mounted
Round-trip Efficiency *1
Cycle Life
≥96%
>6000 @25±2℃0.5C 70%SOH 90%DOD
Safety
IEC62619, IEC63056, N140
EMC
EN IEC 61000--6--1, EN IEC 61000--6--2, EN IEC 61000--6-3, EN IEC 61000--6--4
Transportation
UN38.3, ADR
Environment
ROHS
373
Technical Parameters
LX A5.0-30
Life (Year)
≥25
*1: Test conditions: 100% DOD, 0.2C charge & discharge at 25°C±2 ℃, at the
beginning of life.
*2: Max. charge / discharge current may be variant with vary among different
inverter models.
*3: Recommend/Max.Charging/Discharging Current/ Nominal/Max.Power*
derating will occur related to temperature and SOC.
12.2.2 GW14.3-BAT-LV-G10
Technical Parameters
GW14.3-BAT-LV-G10
Nominal Energy (kWh)
14.3
Usable Energy (kWh) *1
≥ 13.8 Kwh
Type
LFP (LiFePO4)
Nominal Voltage (V)
51.2
Max. Continuous Charging
Current (A)
Max. Continuous Discharging
Current (A)
Maximum Input Power
(System) (kW)*2
Maximum Output Power
(System) (kW)*2
Peak Output Power (System)
(kW)*2
Charging Temperature Range
(℃)
224
260
12KW
12KW @13.2KW(10min)
20KW (15S)
0℃<T≤55℃
Discharging Temperature
Range (℃)
-20℃<T≤55℃
Relative Humidity
5~95%
Max. Operating Altitude (m)
4000
Noise Index (dB)
<45
Communication
CAN RS485
Weight (kg)
125
374
Technical Parameters
Dimension (W×H×D mm)
GW14.3-BAT-LV-G10
885 x 530 x 246 mm
918.6 mm x 530 x 246 mm (including base)
Optional Feature Configuration
Heating module, guide wheel
Ingress Protection Rating
IP20
Storage Temperature (℃)
-20~+45
0°C < T ≤ 45°C (Standard configuration supports ambient
temperature)
Ambient Temperature
10°C < T ≤ 35°C (Recommended ambient temperature)
-20°C < T ≤ 45°C (Optional device system supports ambient
temperature)
-20-35℃ ≤ 12months
Max. Storage Time
35-45℃≤ 6 months
Scalability
16P
Mounting Method
Floor-standing, wall-mounted
Manufacturing Nation
Standard and Certification
China
Safety
IEC 62619, IEC 63056, IEC 60730-1,
N140, RETIE
EMC
EN IEC61000-6-1, EN IEC61000-6-2, EN
IEC61000-6-3, EN IEC61000-6-4
Transpo
rtation
UN38.3, ADR, MSDS
*1: Test conditions: Battery system in early stage of service life, at an ambient
temperature of 25±2°C, discharged at a rate of 0.2P to 100% depth of discharge
(discharge voltage range: 2.85V to 3.6V).The available energy is determined by its
initial design value.However, the actual usable energy may vary due to factors such
as charging and discharging rates, environmental conditions (such as temperature
changes), and influences during transportation and storage.
*2: Maximum input power, maximum output power, and peak output power may
be reduced due to temperature changes and state of charge (SOC) effects.
12.3 Smart Meter Technical Data
375
12.3.1 GM330
Technical Parameters
Type of Electrical Supply System
Nominal Voltage LN (V)
Nominal Voltage LL (V)
Input Data
Voltage
Voltage Range
Nominal Voltage
Frequency (Hz)
Current
CT Ratio
Communication
Communication Distance (m)
User Interface
Voltage/Current
Accuracy
Active Energy
Reactive Energy
Power Consumption (w)
Dimension (W×H×D)
Mechanical
Weight (g)
Parameters
Mounting Method
Ingress Protection Rating
Operating Temperature Range
(℃)
Environmental Storage Temperature Range
Parameters
(℃)
Relative Humidity (No
Condensing)
Max. Operating Altitude (m)
GM330
Three-phase
220/230
380/400
0.88Un-1.1Un
50/60
nA:5A
RS485
1000
4 LEDs, Reset Button
Class 0.5
Class 0.5
Class 1
<5
72*85*72
240
Rail Installation
IP20
-30~70
-30~70
0~95%
3000
12.4 Smart Dongle Technical Data
12.4.1 WiFi/LAN Kit-20
Technical Parameters
Output Voltage (V)
WiFi/LAN Kit-20
5
376
Technical Parameters
Power Consumption (W)
Communication Interface
Ethernet
Communication Wireless
Parameters
Bluetooth
WiFi/LAN Kit-20
<2
USB
10M/100Mbps Self-adaption
IEEE 802.11 b/g/n @2.4 GHz
Bluetooth V4.2 BR/EDR and Bluetooth
LE standard
Dimension (W×H×D
mm)
Weight (g)
Mechanical
Parameters
Ingress Protection
Rating
Mounting Method
Operating Temperature Range (℃)
Storage Temperature Range (℃)
Relative Humidity
Max. Working Altitude (m)
48.3*159.5*32.1
82
IP65
USB port insertion and removal
-30~+60
-40~+70
0-95%
4000
377
13 Appendix
13.1 FAQ
13.1.1 How to Conduct Auxiliary Detection for Smart Meters/CT?
Meter detection function, which can detect whether the CT of the meter is connected
correctly and the current operation status of the meter and CT.
• Approach 1:
1. Access the detection page through Home > Settings > Electricity Meter/ CT
Auxiliary Detection.
2. Click "Start Detection" and wait for the detection to complete. Then, view the
detection results.
• Approach 2:
1. Access the detection page through > [System Setup] > [Quick Setting] >
[Meter/CT Assisted Test].
2. Click "Start Detection" and wait for the detection to complete. Then, view the
detection results.
13.1.2 How to Upgrade the Device Version
Through the firmware information, you can view or upgrade the DSP version, ARM
version, BMS version, and smart dongle software version of the inverter. Some smart
dongles do not support software version upgrade via SolarGo App, and the actual
situation shall prevail.
• Upgrade prompt:
When the user opens the APP, an upgrade prompt will pop up on the homepage, and
the user can choose whether to upgrade or not. If you choose to upgrade, you can
complete the upgrade by following the prompts on the interface.
• Regular upgrade:
Access the firmware information viewing interface through "Home" > "Settings"
> "Firmware Information"
Click "Check for Updates". If there is a new version, complete the upgrade according
378
to the prompts on the interface.
• Forced Upgrade:
The APP will push upgrade information, and users need to upgrade according to the
prompts to continue using the app. You can complete the upgrade by following the
prompts on the interface.
Inverter Software Version Upgrade
• To connect USB flash drive for local software upgrading.
• Before upgrading the device using a USB flash drive, please contact the after-sales
service center to obtain the software upgrade package and upgrade method.
13.2 Abbreviations
Abbreviation
Ubatt
Ubatt,r
Ibatt,max (C/D)
EC,R
UDCmax
UMPP
IDC,max
ISC PV
PAC,r
Sr (to grid)
Smax (to grid)
Sr (from grid)
Smax (from grid)
UAC,r
FAC,r
English Description
Battery Voltage Range
Nominal Battery Voltage
Max. Charging Current
Max. Discharging Current
Rated Energy
Max. Input Voltage
MPPT Operating Voltage
Range
Max. Input Current per MPPT
Max. Short Circuit Current per
MPPT
Nominal Output Power
Nominal Apparent Power
Output to Utility Grid
Max. Apparent Power Output
to Utility Grid
Nominal Apparent Power
from Utility Grid
Max. Apparent Power from
Utility Grid
Nominal Output Voltage
Nominal AC Grid Frequency
379
Chinese Description
电池电压范围
额定电池电压
最⼤充/放电电流
额定能量
最⼤输⼊电压
MPPT 电压范围
每路 MPPT 最⼤输⼊电流
每路 MPPT 最⼤短路电流
额定输出功率
额定并⽹输出视在功率
最⼤并⽹输出视在功率
从电⽹买电额定输出视在功率
从电⽹买电最⼤输出视在功率
额定输出电压
输出电压频率
Abbreviation
IAC,max(to grid)
IAC,max(from
grid)
P.F.
Sr
Smax
IAC,max
UAC,r
FAC,r
Toperating
IDC,max
UDC
UDC,r
UAC
UAC,r
Toperating
Pmax
PRF
PD
PAC,r
F (Hz)
ISC PV
Udcmin-Udcmax
UAC,rang(L-N)
Usys,max
Haltitude,max
English Description
Max. AC Current Output to
Utility Grid
Max. AC Current From Utility
Grid
Power Factor
Back-up Nominal apparent
power
Max. Output Apparent Power
(VA)
Max. Output Apparent Power
without Grid
Max. Output Current
Nominal Output Voltage
Nominal Output Freqency
Operating Temperature
Range
Max. Input Current
Input Voltage
DC Power Supply
Power Supply/AC Power
Supply
Power Supply/Input Voltage
Range
Operating Temperature
Range
Max Output Power
TX Power
Power Consumption
Power Consumption
Frequency
Max. Input Short Circuit
Current
Range of input Operating
Voltage
Power Supply Input Voltage
Max System Voltage
Max. Operating Altitude
380
Chinese Description
最⼤并⽹输出电流
最⼤输⼊电流
功率因数
离⽹额定视在功率
最⼤输出视在功率
最⼤输出电流
最⼤输出电压
额定输出电压频率
⼯作温度范围
最⼤输⼊电流
输⼊电压
直流输⼊
输⼊电压范围/交流输⼊
输⼊电压范围/交流输⼊
⼯作温度范围
最⼤功率
发射功率
功耗
功耗
频率
最⼤输⼊短路电流
⼯作电压范围
适配器输⼊电压范围
最⼤系统电压
最⾼⼯作海拔⾼度
Abbreviation
PF
THDi
THDv
C&I
SEMS
MPPT
PID
Voc
Anti PID
PID Recovery
PLC
Modbus TCP/IP
Modbus RTU
SCR
UPS
ECO mode
TOU
ESS
PCS
RSD
EPO
SPD
ARC
DRED
RCR
AFCI
English Description
Power Factor
Total Harmonic Distortion of
Current
Total Harmonic Distortion of
Voltage
Commercial & Industrial
Smart Energy Management
System
Maximum Power Point
Tracking
Potential-Induced
Degradation
Open-Circuit Voltage
Anti-PID
PID Recovery
Power-line Commucation
Modbus Transmission Control
/ Internet Protocol
Modbus Remote Terminal
Unit
Short-Circuit Ratio
Uninterruptable Power Supply
Economical Mode
Time of Use
Energy Stroage System
Power Conversion System
Rapid shutdown
Emergency Power Off
Surge Protection Device
zero injection/zero export
Power Limit / Export Power
Limit
Demand Response Enabling
Device
Ripple Control Receiver
AFCI
381
Chinese Description
功率因数
电流谐波
电压谐波
⼯商业
智慧能源管理系统
最⼤功率点跟踪
电位诱发衰减
开路电压
防PID
PID修复
电⼒线载波通信
基于TCP/IP层的modbus
基于串⾏链路的modbus
短路⽐
不间断电源
经济模式
使⽤时间
储能系统
电能转换系统
快速关断
紧急关断
防雷保护
防逆流
命令响应设备
AFCI直流拉弧保护
Abbreviation
GFCI
RCMU
FRT
HVRT
LVRT
EMS
BMS
BMU
BCU
SOC
SOH
SOE
SOP
SOF
SOS
DOD
English Description
Ground Fault Circuit
Interrupter
Residual Current Monitioring
Unit
Fault Ride Through
High Voltage Ride Through
Low Voltage Ride Through
Energy Management System
Battery Management System
Battery Measure Unit
Battery Control Unit
State of Charge
State of Health
State Of Energy
State Of Power
State Of Function
State Of Safety
Depth of discharge
Chinese Description
接地故障分断器
残余电流监控装置
故障穿越
⾼电压穿越
低电压穿越
能量管理系统
电池管理系统
电池采集单元
电池控制单元
电池的荷电状态
电池健康度
电池剩余能量
电池充放电能⼒
电池的功能状态
安全状态
放电深度
13.3 Explanation of Terms
• Overvoltage Category Definition
Category I: applies to equipment connected to a circuit where measures have
been taken to reduce transient overvoltage to a low level.
Category II: applies to fixed downstream equipment. For example, appliances,
portable tools and other plug-connected equipment; Voltage category III is used
if there are special requirements for the reliability and suitability of such
equipment.
Category III: applies to fixed downstream equipment, including the main
distribution board. For example, switchgear and other equipment in an industrial
installation
Category IV: applies to the upstream equipment in the power supply of the
distribution device, including measuring instruments and upstream over-current
protection devices.
• Definition of Types of Damp Places
○
○
○
○
382
Environmental
Parameters
Temperature
Range
Humidity Range
Level
3K3
4K2
4K4H
0~+40℃
-33~+40℃
-33~+40℃
5% to 85%
5% to 85%
4% to 100%
• Definition of Environmental Category:
Outdoor Inverter: The ambient air temperature range is -25 to +60℃, and it is
suitable for environments with pollution degree 3.
Indoor Type II Inverter: The ambient air temperature range is -25 to +40℃, and
it is suitable for environments with pollution degree 3.
Indoor Type I Inverter: The ambient air temperature range is 0 to +40℃, and it
is suitable for environments with pollution degree 2.
• Definition of Pollution Degree Categories:
Pollution Degree 1: No pollution or only dry non-conductive pollution.
○
○
○
○
○
○
○
Pollution Degree 2: In general, there is only non-conductive pollution, but the
transient conductive pollution caused by occasional condensation must be taken
into account.
Pollution Degree 3: There is conductive pollution, or the non-conductive
pollution becomes conductive pollution due to condensation.
Pollution Degree 4: Persistent conductive pollution, such as pollution caused by
conductive dust or rain and snow.
13.4 Battery SN Code Meaning
Bits 11-14 of the product SN code are the production time code.
The above picture has a production date of 2023-08-08
• The 11th and 12th digits represent the last two digits of the year of manufacture,
e.g., 2023 is represented by 23.
383
• The 13th digit is the month of production, e.g., August is represented by 8;
as follows:
Month
1~9
10
11
12
Month
1~9
A
B
C
• The 14th digit is the date of production, e.g., the 8th day is indicated by 8;
priority is given to the use of numerical representation, e.g., 1~9 indicates the
1st~9th day, A indicates the 10th day, and so on. The letters I and O are not used to
avoid confusion. The details are as follows:
Production Date
1
2
3
4
5
6
7
8
9
Code
1
2
3
4
5
6
7
8
9
Production Date
10
11
12
13
14
15
16
17
18
Code
A
B
C
D
E
F
G
H
J
Production Date
21
22
23
24
25
26
27
28
29
Code
M
N
P
Q
R
S
T
U
V
384
">