LED Enhanced Sign Installation. Carmanah R820-E, R829-E, R920-E, R247-E, F series, R829-F, E Series, R920-F
Add to My manuals75 Pages
advertisement
E / F SERIES USER MANUAL
4.0 FIXTURE, PUSH BUTTON, & BATTERY INSTALLATION
4.3 LED Enhanced Sign Installation
1. Use banding and sign brackets (not included) to mount the sign on the pole.
2. Open the junction box on the back of the LED Enhanced Sign. Set the screws safely aside.
3. Loosen the cable gland and feed the LED cable into the junction box far enough that the cable gland can properly seal.
4. Tighten the cable gland.
5. Use two twist-on wire connectors or splice terminals to attach the LED harness to the yellow and white
LED wires inside the connection box. Observe the following polarities:
6. Positive:
7. Negative:
Red from solar engine to Yellow in LED Enhanced Sign
Black from solar engine to White in LED Enhanced Sign
8. Close the connection box.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected]
| carmanahtraffic.com
36
advertisement
Related manuals
advertisement
Table of contents
- 2 Table of Contents
- 4 1.0 Warnings and Precautions
- 4 Warranty Disclaimer
- 4 Standards
- 4 Safety and Usage Precautions
- 6 System Components
- 7 2.0 Introduction
- 7 About the E and F Series
- 8 Radio Communication
- 8 R920-E and R920-F: Pedestrian Crosswalk with RRFB Light Bars
- 10 R820-E and R820-F: Pedestrian Crosswalk with Circular Beacons
- 11 R829-E and R829-F: School Zone Flashing Beacon
- 12 R247-E and R247-F: 24-Hour Flashing Beacon
- 13 RRFB Light Bars: Overview
- 13 Circular Beacons: Overview
- 14 LED Enhanced Signs: Overview
- 14 Third-Party Devices: Overview
- 16 3.0 Solar Engine Installation
- 16 Tools and Materials Required
- 17 Solar Engine Mounting to Round Post
- 18 Solar Engine Mounting to Square Post with Universal Cast Mount
- 19 Solar Engine Mounting to Square Post with Steel Mount
- 20 Solar Engine Mounting to Side of Post
- 21 Reinforced Signal Head for Integrated Solar Engine / Signal Head
- 22 Integrated Solar Engine with Signal Head – Round Post
- 24 Integrated Solar Engine with Signal Head – Square Steel Post
- 26 Integrated Solar Engine with Signal Head – Square Wood Post
- 28 Integrated Solar Engine with Signal Head – Side of Post
- 30 4.0 Fixture, Push Button, & Battery Installation
- 30 RRFB Light Bar Installation
- 35 Circular Beacon Installation
- 36 LED Enhanced Sign Installation
- 37 Push Button Installation
- 39 Battery Installation
- 43 5.0 Installation of Optional Accessories
- 43 Calendar Upload / Override Switch Kit Installation
- 44 RTC Time Switch Installation (F Series only)
- 45 Information Display Company Time Switch Installation (F Series only)
- 46 Applied Information or FCU Modem Kit Installation (F Series only)
- 48 3PD Time Switch Supplementary Information
- 50 DC Relay Kit Installation (F Series only)
- 51 Polara XAV Controller Kit Installation (F Series only)
- 52 Campbell Guardian Audible Push Button Kit Installation (F Series only)
- 52 6.0 Energy Management System Programming and Testing
- 52 EMS On-Board User Interface Operation
- 65 R920-E/F Programming
- 65 R820-E/F Programming
- 65 R829-E/F Programming
- 65 R247-E/F Programming
- 66 7.0 Commissioning Checklist
- 67 8.0 Maintenance and Product Care
- 67 Fuse Replacement
- 68 Battery Replacement
- 68 EMS Replacement
- 70 EMS Recycling
- 71 9.0 Troubleshooting
- 72 BIST Error Codes
- 74 10.0 Customer Service and Warranty
- 74 Additional Products
- 75 Glossary