8.0 Maintenance and Product Care. Carmanah R820-E, R829-E, R920-E, R247-E, F series, R829-F, E Series, R920-F
Add to My manuals75 Pages
advertisement
![8.0 Maintenance and Product Care. Carmanah R820-E, R829-E, R920-E, R247-E, F series, R829-F, E Series, R920-F | Manualzz 8.0 Maintenance and Product Care. Carmanah R820-E, R829-E, R920-E, R247-E, F series, R829-F, E Series, R920-F | Manualzz](http://s3.manualzz.com/store/data/065078878_1-df0b8670eea0229e6bd2fbd94d1f36dc-360x466.png)
8.0 Maintenance and Product Care
E / F SERIES USER MANUAL
8.0 MAINTENANCE AND PRODUCT CARE
The E and F Series solar engines are designed to operate reliably for years with virtually no need for maintenance. Carmanah recommends routine inspections of the solar panels to ensure that they are unobstructed by anything that may prevent effective solar charging, including:
• Dirt and dust
• Snow
• Leaves
• Debris
• Shade that may have developed after installation due to adjacent plant growth.
The frequency of the inspections depends on location and local weather patterns. A yearly visual inspection of the solar engine is typically sufficient. The system is designed to be maintenance free, but maximum system performance is achieved when the LED lenses and solar panels are clean. When inspecting the interior, ensure that the vent screens are undamaged and that the vents are clear and allow airflow.
8.1 Fuse Replacement
It is important to ensure both fuses are working. With two fuses in the system, it is possible for one fuse to be blown while the system continues to operate normally using the remaining battery. In this event, the available battery capacity, and therefore system autonomy, will be half of what it should be, and the single working battery will be working harder and cycling deeper than it should be, which will shorten its service life. To replace the fuse:
1. Remove any metal jewelry and keep any tools or other conductive objects away from the exposed fuses or battery terminals.
2. Check all wiring for any faults that may have caused the fuse to blow.
Fuse holders
3. Pull the yellow rubber fuse holders apart and check the fuses.
4. Replace a blown fuse with an identical 3AG (1/4" x 1-1/4") fast-acting 7A fuse, Littelfuse part number
0312007.MXP (or equivalent).
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected]
| carmanahtraffic.com
67
advertisement
Related manuals
advertisement
Table of contents
- 2 Table of Contents
- 4 1.0 Warnings and Precautions
- 4 Warranty Disclaimer
- 4 Standards
- 4 Safety and Usage Precautions
- 6 System Components
- 7 2.0 Introduction
- 7 About the E and F Series
- 8 Radio Communication
- 8 R920-E and R920-F: Pedestrian Crosswalk with RRFB Light Bars
- 10 R820-E and R820-F: Pedestrian Crosswalk with Circular Beacons
- 11 R829-E and R829-F: School Zone Flashing Beacon
- 12 R247-E and R247-F: 24-Hour Flashing Beacon
- 13 RRFB Light Bars: Overview
- 13 Circular Beacons: Overview
- 14 LED Enhanced Signs: Overview
- 14 Third-Party Devices: Overview
- 16 3.0 Solar Engine Installation
- 16 Tools and Materials Required
- 17 Solar Engine Mounting to Round Post
- 18 Solar Engine Mounting to Square Post with Universal Cast Mount
- 19 Solar Engine Mounting to Square Post with Steel Mount
- 20 Solar Engine Mounting to Side of Post
- 21 Reinforced Signal Head for Integrated Solar Engine / Signal Head
- 22 Integrated Solar Engine with Signal Head – Round Post
- 24 Integrated Solar Engine with Signal Head – Square Steel Post
- 26 Integrated Solar Engine with Signal Head – Square Wood Post
- 28 Integrated Solar Engine with Signal Head – Side of Post
- 30 4.0 Fixture, Push Button, & Battery Installation
- 30 RRFB Light Bar Installation
- 35 Circular Beacon Installation
- 36 LED Enhanced Sign Installation
- 37 Push Button Installation
- 39 Battery Installation
- 43 5.0 Installation of Optional Accessories
- 43 Calendar Upload / Override Switch Kit Installation
- 44 RTC Time Switch Installation (F Series only)
- 45 Information Display Company Time Switch Installation (F Series only)
- 46 Applied Information or FCU Modem Kit Installation (F Series only)
- 48 3PD Time Switch Supplementary Information
- 50 DC Relay Kit Installation (F Series only)
- 51 Polara XAV Controller Kit Installation (F Series only)
- 52 Campbell Guardian Audible Push Button Kit Installation (F Series only)
- 52 6.0 Energy Management System Programming and Testing
- 52 EMS On-Board User Interface Operation
- 65 R920-E/F Programming
- 65 R820-E/F Programming
- 65 R829-E/F Programming
- 65 R247-E/F Programming
- 66 7.0 Commissioning Checklist
- 67 8.0 Maintenance and Product Care
- 67 Fuse Replacement
- 68 Battery Replacement
- 68 EMS Replacement
- 70 EMS Recycling
- 71 9.0 Troubleshooting
- 72 BIST Error Codes
- 74 10.0 Customer Service and Warranty
- 74 Additional Products
- 75 Glossary