- No category
advertisement
7.1
Configuration process on the DP master
The configuration process of the frequency inverter with the Profibus communication module CM-PDP is displayed here with the example of a Siemens STEP7 hardware configurator. The process is principally valid for other configurations in an equivalent form.
First, the GSD file VEC_0696.GSD is installed in the hardware configurator (if not already existent). This is done with the menu selection Extras \ Install new GSD.
Here, you enter the path and the name for the GSD file (VEC_0696.GSD).
If the GSD file has been installed, the frequency inverter appears under the selection
PROFIBUS-DP \ Further FIELD DEVICES \ Drives \ ACT 10
From this position, an ACT frequency inverter can now be connected to the required
Profibus phase by Drag & Drop.
The four possible objects PPO1 to PPO4 are now visible under the menu point
ACT 10. The required object is now assigned to the inverter by Drag & Drop.
The screen shot from the STEP7 hardware configuration shows an ACT frequency inverter with the station address 3 and the object PPO2.
10
10 06/05
06/05
advertisement
Related manuals
advertisement
Table of contents
- 6 General safety and application information
- 6 General information
- 6 Proper use
- 7 Transport and storage
- 7 Handling and positioning
- 7 Electrical connection
- 7 Operation information
- 7 Maintenance and service
- 8 Introduction
- 9 Assembly of the Profibus-DP communication module CM-PDP
- 10 Socket occupancy/bus termination/line
- 11 Baud rate setting/line length
- 11 Setting station address
- 11 Setting PPO type
- 12 Configuration process on the DP master
- 13 Commands SYNC / FREEZE
- 13 Available objects / scanning times
- 15 10 Handling of the objects
- 15 Communication channel
- 16 10.1.1 Order identification
- 16 10.1.2 Reply identification
- 16 10.1.3 Fault messages
- 17 10.1.4 Parameters, data set selection and cyclic writing
- 18 10.1.5 Sequence of communication
- 19 10.1.6 Examples of communication
- 21 Process data channel PZD1/PZD
- 21 10.2.1 PZD1, control word / state word
- 22 10.2.2 Control via contacts
- 23 10.2.3 Control via state machine
- 26 Behavior in quick stop
- 26 Behavior in transition
- 27 10.2.4 Control via remote contacts
- 29 10.2.5 PZD2, reference value / actual value
- 30 10.2.6 Variable actual value reporting via PZD2 in PPO1 / PPO
- 32 10.2.7 Actual value report PZD2 to PZD6 in PPO2 / PPO
- 32 10.2.8 PPO-Out data as global sources
- 37 Actual value display of Profibus data
- 39 11 Parameter list
- 39 Actual value
- 39 Parameter
- 40 12 Annex
- 40 Warning messages
- 40 Fault messages
- 41 GSD File – VEC_0696.GSD