advertisement
▼
Scroll to page 2
of 113
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 6 Non Disclosure Agreement
- 7 About This Manual
- 7 Introduction
- 7 General Requirements
- 7 References
- 7 Symbols
- 8 System Overview
- 10 Description
- 12 Placing The Basic System Into Operation
- 12 Unpacking
- 12 Anti-Static Precautions
- 12 Working On The System
- 12 The Cabinet
- 12 Mounting The Cabinet
- 13 Operational Parameters
- 13 Cabling Recommendations
- 14 Power Supplies and AC Mains Installation
- 16 Current Limiter, Fuse Board
- 17 Brigade / PSU Monitor Board
- 19 Brigade / PSU Monitor Board & Battery Connections
- 19 Brigade / PSU Monitor Board Auxiliary 27 Volt Power
- 19 Brigade / PSU Monitor Board DBA / MCP & Door Switch Connections
- 19 Brigade PSU Monitor Board ASE Fault Brigade Box Connection
- 20 Connecting a Bell / Sounder to the Brigade / PSU Monitor Board
- 20 Warning System Connections
- 20 Brigade / PSU Monitor Board Relay Output Connections
- 21 Main Board BRD85MBA
- 22 Front Panel Board
- 24 Main CPU BRD85CPU
- 25 Slave CPU
- 26 RS232 Modem / Programming / Debug Interfacing
- 26 Ancillary Services
- 27 Conventional Zone Board
- 28 Addressable Loop Termination Board
- 29 Boards
- 31 16/16 Input / Output Board
- 32 16 Way Input Board
- 32 Serial Relay Board
- 33 Fire Fan Module BRD25FCB
- 33 Fan Termination Board BRD25FTB
- 34 Zone & General Indicator Card
- 36 Printer
- 36 Indicators and Buttons
- 37 Maintenance
- 38 Printer Connections and Jumpering
- 38 Printer 5 Volt Power Supply ( 302-713 )
- 39 Expanding the System Through Networking
- 39 Communications: Controller Interface Card
- 39 Communications: Network Interface Card
- 40 Expansion Board ( 302-688 )
- 40 Expansion Controller
- 41 Networking
- 43 Liquid Crystal Display Repeater Panel
- 44 Terminal
- 44 Operation
- 44 Access levels
- 45 Specifications
- 45 Overview
- 46 Operational & Key Features
- 46 Mechanical
- 47 Installation & Cabling
- 48 Setting the Address
- 49 Terminal Controller Configuration in ConfigManager
- 49 Terminal Reporting Parameters in ConfigManager
- 50 Terminal Controls
- 52 Terminal Indicators
- 54 LCD Screen Format
- 55 Trouble Shooting Chart
- 56 Agent Release Control
- 56 Operation
- 59 Controlled Access
- 60 Local Control Station
- 63 Agent Release Termination Board BRD25ATB
- 64 Interface Wiring
- 66 Warning Signs
- 68 Occupant Warning Systems
- 73 Brigade Devices
- 73 ASE ( Vic Metro ) Brigade Box
- 73 Brigade Box ( Deltec WA, SA, TAS,QLD )
- 74 Operation
- 74 The Control Panel
- 77 Function And Menu
- 77 The Default LCD Display
- 77 Accessing Functions and Menus
- 77 Function Menu and Access Levels
- 77 Forgotten Passwords
- 78 The Main Menu
- 78 Status Menu
- 80 Testing Menu
- 80 Alarm Test
- 80 Fault Test
- 80 Lamp Test
- 81 Main Functions
- 81 Setting the Function Date Facility
- 81 Setting the Function Time Facility
- 81 Setting the Function Daynight Facility
- 81 Function Logs Facility
- 82 The Function Test Facility
- 83 Function Manual I/O Control
- 83 Function Access ( Level II ) / Passwords ( Level III )
- 84 Function Programming
- 84 Conventional Zone Programming
- 85 Device Programming
- 85 Input Programming
- 85 Output Programming
- 86 Manual Control Point ( MCP )
- 86 Sub Address
- 86 Watchdog
- 86 Self Learn
- 86 Extra Devices Detected
- 87 Mismatch Detected
- 87 Incoming Fire Alarm Signal
- 89 Accessing a Loop, Sensor or Zone
- 89 List of Compatible Devices
- 89 Short Circuit Isolation
- 90 Compatible Devices
- 92 Certification Information
- 93 Statement of Compliance
- 95 Installation Details
- 96 Commissioning Test Report
- 97 Procedure
- 97 System Information
- 101 Troubleshooting Chart
- 102 Address Setting
- 103 Battery Capacity Calculation
- 109 Glossary of Terms
- 110 Definitions
- 111 Quick Reference Guides