![](http://s3.manualzz.com/store/data/033895922_1-44c96c003dce0c8b7844078745c3ad3b-128x128.png)
advertisement
![RGN 120-260 Manual | Manualzz RGN 120-260 Manual | Manualzz](http://s3.manualzz.com/store/data/033895922_1-44c96c003dce0c8b7844078745c3ad3b-360x466.png)
Installation
Installation
Installation positions for KE...D,Z
90°
Installation position for KE...V
Installing flange and burner
When installing the sliding flange, only tighten screws
1 and 2 otherwise it will not be possible to secure the burner pipe with screw 3. Slide in the burner, adjust to furnace depth and tighten the screws in the following sequence: 3, 4, 5, raising the housing in the process.
Important: Secure the sliding flange so that the clamping screw 3 is positioned at the top.
Checking electrode setting
• Move the burner into the service position as described on Page 23.
• Check the setting of the ignition and ionisation electrodes (see Page 23).
90°
Installing gas assembly
• Remove plastic protective plug.
• Install unions including accompanying seals.
• Observe installation position.
• Check connecting point of gas assembly with noncorrosive foaming agent for leaks and vent gas pipe.
• When venting gas, discharge safely to atmosphere with a hose.
Comply with DVGW-TRGI 1986/96 Section 7,
TRF 1988, DIN 4756 and local regulations.
If proportional pressure control RGN(L)120/260T, with KEV:
Fit the furnace pressure meter tube to the boiler door with the gradient towards the boiler (if required).
Lay the control lines to the KEV to the corresponding ports P
L
and P
F
.
Use the blue PU hoses supplied.
• Lay the control line so that no condensate can flow into the KE.
• Connect hose to furnace pressure meter tube with port P
F
(if required).
• Connect hose to port P
L
with measuring nipple for air pressure on burner base plate.
If this connection is not made, the magnetic valves will not open.
5
advertisement
Related manuals
advertisement
Table of contents
- 3 Overview
- 3 General information / safety information
- 3 Declaration of conformity
- 3 Checking scope of delivery and connection data
- 4 Operating instructions
- 4 Instruction of operating personnel
- 4 Maintenance and customer service
- 4 Key for code designation
- 4 Technical specifications
- 5 Installation
- 5 Installing flange and burner
- 5 Checking electrode setting
- 5 Installing gas assembly
- 6 Establishing electrical connections
- 7 Function
- 7 Control unit DMG
- 8 Air flow setting, dimension "A
- 9 Air flap positioning motor
- 10 Compact gas unit
- 10 Gas pressure monitor
- 11 Start-up
- 11 Adjustment tables RGN 120 / RGL
- 12 Adjustment tables RGN 120T / RGL 120T
- 13 Adjustment tables RGN 260 / RGL
- 14 Adjustment tables RGN 260T / RGL 260T
- 15 Adjusting gas burner and boiler
- 19 Calculation principle for gas burner adjustment
- 21 Design
- 21 Exploded drawing and spare parts/parts list RGN 120 / RGL
- 22 Exploded drawing and spare parts/parts list RGN 260 / RGL
- 23 Service instructions/dimensions
- 23 Service position
- 23 Reference dimensions, ignition and ionisation electrodes
- 24 Measuring ionisation current
- 24 Servicing air pressure monitor
- 25 Wiring diagrams
- 27 Troubleshooting
- 28 Burner overall dimensions / boiler connection dimensions
- 28 Working ranges