Power-up and testing

5. After all detectors have been individually inspected, run a

Sensitivity report, using the Reports command.

Addressable analog detectors on a 3-AADC(1)

Module circuit

1. Verify that all components are installed using accepted workmanship standards.

2. Individually activate each detector. Verify that the appropriate Alarm and location message is displayed on the

LCD module. Verify that the detector initiates the appropriate system responses.

3. Duct mounted detectors should be tested to verify that minimum/maximum airflow requirements are met.

4. Remove the detector from its base. Verify that the appropriate Trouble and location message is displayed on the

LCD module.

5. After all detectors have been individually inspected, run a

Sensitivity report, using the Reports command.

Traditional 2-wire smoke detectors connected to

3-IDC8/4 modules

1. Verify that all components are installed using accepted workmanship standards.

2. Individually activate each detector. Verify that the appropriate Alarm and location message is displayed on the

LCD module. Verify the detector circuit initiates the appropriate system responses.

3. Duct mounted detectors should be tested to verify that minimum/maximum airflow requirements are met.

4. Remove the detector from its base. Verify that the appropriate circuit Trouble and location message is displayed on the LCD module.

Conventional 2-wire smoke detectors connected to SIGA-UM modules

1. Verify that all components are installed using accepted workmanship standards.

2. Verify that jumper JP1 on each SIGA-UM module is set to position 1/2.

3. Individually activate each detector. Verify that the appropriate Alarm and location message is displayed on the