10 | Heat Recovery Package
To identify a Flash Code number, count the number of consecutive flashes.
Every time the module powers up, the last ALERT
Flash Code that occurred prior to shut down is displayed for one minute.Heat Recovery Package
HEAT RECOVERY PACKAGE
Water Tank Preparation
1. Turn off electrical or fuel supply to the water heater.
2. Attach garden hose to water tank drain connection and run other end of hose out doors or to an open drain.
3. Close cold water inlet valve to water heater tank.
4. Drain tank by opening drain valve on the bottom of the tank, then open pressure relief valve or hot water faucet.
SM CS Series Heat Pump
5. Once drained the tank should be flushed with cold water until the water leaving the drain hose is clear and free of sediment.
6. Close all valves and remove the drain hose.
7. Install HR water piping.
Concentric water fitting (p/n 520-105) is recommended.
HR Water Piping
All hot water piping MUST be a minimum of 3/8t
O.D. copper tube to a maximum distance of fifteen
(15) feet. For distances beyond fifteen feet but not exceeding sixty (60) feet use 1/2” copper tube.
Separately insulate all exposed surface of both connecting water lines with 3/8” wall closed cell insulation. Install isolation valves on supply and
return to the heat recovery. (Figure #8)
Hot
Water
Supply
Cold
Water
Supply
T/P Valve
Water Out
Retrun from HRP
Isolation Valves
Tank Drain Valve
Concentric Fitting
Part #520105
Drain Valve
(Optional)
Water In
Supply to HRP
NOTE: Diagram for illustration purposes only.
Ensure access to Heat Pump is not restricted.
Figure # 8
8 733 920 846 (2015/01) Subject to change without prior notice SM CS Series Heat Pump
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 3 Model Nomenclature
- 3 Key to Symbols
- 3 Safety Warnings
- 4 Standard SM CS package
- 4 GENERAL DESCRIPTION
- 4 MOVING AND STORAGE
- 4 INITIAL INSPECTION
- 4 LOCATION
- 4 Condensing Section
- 5 Air Handler
- 5 PIPING
- 6 ELECTRICAL
- 6 Safety Devices and the UPM Controller
- 10 OPTIONS
- 10 Heat Recovery Package (HRP)
- 10 DPS Water Flow Proving
- 10 Pump Relay
- 10 Comfort Alert Module
- 11 HEAT RECOVERY PACKAGE
- 11 Water Tank Preparation
- 11 HR Water Piping
- 12 Water Tank Refill
- 12 Initial Start-Up
- 13 SEQUENCE OF OPERATION
- 13 Cooling Mode
- 13 Heating Mode
- 15 APPLICATION CONSIDERATIONS
- 15 Well Water Systems
- 16 Cooling Tower/Boiler Systems
- 18 Geothermal Systems
- 19 SYSTEM CHECKOUT
- 19 UNIT START-UP
- 20 MAINTENANCE
- 21 UNIT CHECK-OUT SHEET
- 22 TROUBLESHOOTING
- 25 Unit Lockouts
- 26 OPERATING TEMPERATURES AND PRESSURES
- 31 WATER SIDE PRESSURE DROP TABLE
- 32 WIRING DIAGRAMS
- 33 DIMENSIONAL DRAWINGS
- 34 SPARE PARTS LIST
- 35 CS Parts List - Cabinet
- 36 CS Parts List -Refrigeration/Electrical
- 39 Notes