SM CS Series Heat
Water Tank Refill
1. Open the cold water supply to the tank.
2. Open a hot water faucet to vent air from the system until water flows from the faucet, then close.
3. Depress the hot water tank pressure relief valve handle to ensure there is no air remaining in the tank.
4. Carefully inspect all plumbing for water leaks.
Correct as required.
5. Purge all air from HR by depressing the schrader valve on the HR Unit. Allow all air to bleed out until water appears at the valve.
All piping from HRP to domestic water tank must be copper or any metal of stronger alloy.
Heat Recovery Package | 11
Initial Start-Up
Make sure all valves in heat recovery water piping system are open. NEVER OPERATE
HR PUMP DRY.
1. Turn on the heat pump. The HR pump should not run if the compressor is not running.
2. Turn HR switch to the “ON” position. The pump will operate if entering water temperature to
HR is below 120° F.
3. The temperature difference between the water entering and leaving the heat recovery should be 5° to 15° F.
4. Allow the unit to operate for 20 to 30 minutes to ensure it is functioning properly. The pump should shut off when the water temperature entering the heat recovery reaches 120°F.
6. Before restoring the power or fuel supply to the water heater, adjust the temperature setting on the tank thermostat(s) to ensure maximum utilization of the heat available from the refrigeration system and conserve the most energy. On tanks with both upper and lower elements and thermostats, the lower element should be turned down to 100° F, while the upper element should be adjusted to 120° F.
Depending upon the specific needs of the customer, you may need to adjust the upper element differently. On tanks with a single thermostat lower the thermostat setting to
120° F or the “LOW” position. After thermostat adjustments are completed, replace access cover and restore electrical or fuel supply to water heater.
Revised 01-15 8 733 920 846 (2015/01)
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 3 Model Nomenclature
- 3 Key to Symbols
- 3 Safety Warnings
- 4 Standard SM CS package
- 4 GENERAL DESCRIPTION
- 4 MOVING AND STORAGE
- 4 INITIAL INSPECTION
- 4 LOCATION
- 4 Condensing Section
- 5 Air Handler
- 5 PIPING
- 6 ELECTRICAL
- 6 Safety Devices and the UPM Controller
- 10 OPTIONS
- 10 Heat Recovery Package (HRP)
- 10 DPS Water Flow Proving
- 10 Pump Relay
- 10 Comfort Alert Module
- 11 HEAT RECOVERY PACKAGE
- 11 Water Tank Preparation
- 11 HR Water Piping
- 12 Water Tank Refill
- 12 Initial Start-Up
- 13 SEQUENCE OF OPERATION
- 13 Cooling Mode
- 13 Heating Mode
- 15 APPLICATION CONSIDERATIONS
- 15 Well Water Systems
- 16 Cooling Tower/Boiler Systems
- 18 Geothermal Systems
- 19 SYSTEM CHECKOUT
- 19 UNIT START-UP
- 20 MAINTENANCE
- 21 UNIT CHECK-OUT SHEET
- 22 TROUBLESHOOTING
- 25 Unit Lockouts
- 26 OPERATING TEMPERATURES AND PRESSURES
- 31 WATER SIDE PRESSURE DROP TABLE
- 32 WIRING DIAGRAMS
- 33 DIMENSIONAL DRAWINGS
- 34 SPARE PARTS LIST
- 35 CS Parts List - Cabinet
- 36 CS Parts List -Refrigeration/Electrical
- 39 Notes