advertisement
IQ Commercial Envoy Installation and Operation
IQ Commercial Envoy Operation
IQ Commercial Envoy Displays and Controls
You can track system installation progress with the Enphase Installer Toolkit mobile app.
The LEDs on the IQ Commercial Envoy are solid green when a function is enabled or performing as expected, flashing when an operation is in progress, or solid amber when troubleshooting with Installer
Toolkit is required.
—
Network Communications LED:
Green when IQ Commercial Envoy is connected to Enlighten.
—
AP Mode LED:
Green when Envoy’s AP Wi-Fi network is available.
—
AP Mode Button:
Press to enable Envoy’s AP Mode for connecting with a mobile device. Hold for 5 seconds to start WPS connection to a router.
—
Power Production LED:
Green when microinverters are producing power.
—
Device Communications LED:
Green when devices are communicating with IQ
Commercial Envoy.
—
Device Scan Button:
Press to start/stop a 15-minute scan for devices over the power line.
IQ
Commercial Envoy LED States
LED State
All
Network
Communications
AP mode
Power production
Device
Communications
Description
Flashing amber in unison The IQ Commercial Envoy is booting up
Flashing green sequentially Software update in progress
Solid green
Flashing green
Solid amber
Off
Solid green
Off
Solid green
Flashing green
Solid Amber
Off
Solid Green
Flashing Green
Solid Amber
Off
Communicating with Enlighten
WPS connection in progress or the IQ Commercial
Envoy is attempting to connect to Enlighten
Local network connection only
No network connection
AP mode enabled:
Envoy Wi-Fi network available
AP mode disabled:
Envoy Wi-Fi network unavailable
All communicating microinverters are producing
Microinverter update in progress
At least one microinverter is not producing
Microinverters are not communicating
(low light or night time)
All devices are communicating
Device scan in progress
At least one device is not communicating
Devices are not communicating
(low light or night time)
23 © 2018 Enphase Energy Inc. 141-00041 Rev 01
IQ Commercial Envoy Installation and Operation
LED Behavior at Initial Start Up
When the IQ Commercial Envoy starts up for the first time, it goes through the initial boot sequence. During this initial boot sequence, all the IQ Commercial Envoy LEDs flash amber. Soon after connecting to the
Internet, the IQ Commercial Envoy may retrieve a software update, and the LEDs flash green sequentially during the update.
WARNING!
Risk of Equipment Damage. Do not remove power from the IQ Commercial
Envoy if the LEDs are flashing green sequentially. This indicates that a software update is in progress.
Initial Communications Check
The IQ Commercial Envoy normally indicates no Internet connection for two to three minutes after the first start up. It then sends the first report to Enlighten. When Enlighten responds, the Network Communications
LED lights solid green, indicating an Internet connection to Enlighten.
More about Device Communications States
A detected device (microinverter or battery) is one that has been discovered via the Envoy’s device scan or provisioned via Installer Toolkit or Enlighten.
The states of the Device Communications LED have slightly different meanings, depending on whether the installer has provided an expected number of microinverters. If you have NOT provided the expected number of microinverters either through the Activation form or in Installer Toolkit, the LED displays as described in the
No expected number provided
column. If you have provided the expected number of microinverters in the Activation form or in Installer Toolkit, this LED displays as described in the
Expected number provided
column. If the Envoy has been provisioned with the serial numbers of the microinverters, this displays as described in the
With provisioning
column.
State No expected number provided
Expected number provided With provisioning
Solid Green
•
Solid Amber
•
All
discovered
devices are communicating.
The
expected
number of devices was discovered and all are communicating.
At least one of the discovered devices is not communicating.
The number of devices communicating is not equal to the number expected (e.g., 0/12, 1/12,
11/12, or 13/12).
All of the
provisioned
devices are communicating.
The devices that are communicating are not the same as those provisioned.
Initiate a New Scan for Microinverters
The IQ Commercial Envoy identifies each device by its unique serial number. If you add more microinverters to an existing system or replace a microinverter or the IQ Commercial Envoy, you can run a scan to detect the new devices. To initiate a scan after you add new microinverters to an existing Enphase system, perform the following steps.
1.
Press the
Device Scan
button. The IQ Commercial Envoy begins a 15-minute scan to identify all of the microinverters deployed at the site. The Device Communications LED flashes green during the scan. Alternatively, you can initiate a scan using Installer Toolkit.
2.
Log into Enlighten to check for the new microinverter and use Array Builder to add the new microinverter to the virtual array.
3.
After the microinverter is detected, it is best to disable the scan. To do this, press the IQ
Commercial Envoy
Device Scan
button again.
24 © 2018 Enphase Energy Inc. 141-00041 Rev 01
advertisement
Related manuals
advertisement
Table of contents
- 1 Enphase IQ Commercial Envoy
- 2 Contact Information
- 2 FCC Compliance
- 2 Other Information
- 2 This Class B digital apparatus complies with Industry Canada ICES-003.
- 2 For third-party license information, refer to enphase.com/licenses.
- 2 For Enphase patent information, refer to enphase.com/company/patents/.
- 2 For warranty text, refer to enphase.com/warranty.
- 2 Copyright © 2018 Enphase Energy Inc. All rights reserved.
- 2 Audience
- 3 Table of Contents
- 5 SAFETY
- 5 Read this First
- 5 Safety Instructions
- 6 The Enphase IQ Commercial Envoy
- 6 How the Enphase Microinverter System Works
- 7 Installation Planning and Preparation
- 8 Pre-installation Checks
- 8 Review the following pre-installation checks before you install the IQ Commercial Envoy.
- 8 Plan the Power Connection
- 8 Plan the Internet Connection
- 8 Download the Installer Toolkit App
- 9 Metering Considerations
- 9 To install the production CT
- 9 Box Contents
- 9 Required Items
- 9 Optional Items
- 10 System Capacity
- 10 Create the Map and Install the PV Modules and Microinverters
- 11 Installation Sequence
- 12 Installing the IQ Commercial Envoy – Part 1
- 12 1. Choose a Location for the IQ Commercial Envoy
- 13 2. Wire the IQ Commercial Envoy for Power and Metering
- 13 2A. Provide a Power Connection
- 14 2B. Install CTs for Metering
- 15 Install the CT for Production Metering
- 15 Install CTs for Consumption Metering (Optional)
- 16 Extend Consumption CT Leads, If Needed
- 16 3. Energize and Update the IQ Commercial Envoy
- 17 Installing the IQ Commercial Envoy – Part 2
- 17 4. Detect the Devices
- 17 Use one of the following methods to detect devices (Enphase Microinverters and/or Enphase Batteries).
- 17 Method A: Provision Devices with Installer Toolkit
- 17 Method B: Discover Devices with Installer Toolkit
- 18 Method C: Discover Devices with the IQ Commercial Envoy
- 18 With All Methods
- 18 5. Verify Configuration and Enable the Meters
- 19 6. Connect to Enlighten
- 19 Method A: Integrated Wi-Fi
- 20 Method B: Enphase Mobile Connect Modem
- 20 Method C: Ethernet Cable
- 21 Method D: Power Line Communication Bridges
- 21 If the Internet Connection Fails
- 21 7. Send System Summary Report
- 22 8. Activate Monitoring
- 22 Method A: If the IQ Commercial Envoy is Associated with a System in Installer Toolkit
- 22 Method B: If the IQ Commercial Envoy is NOT associated with a System in Installer Toolkit
- 22 View System Performance in Enlighten
- 23 IQ Commercial Envoy Operation
- 23 IQ Commercial Envoy Displays and Controls
- 23 You can track system installation progress with the Enphase Installer Toolkit mobile app.
- 23 IQ Commercial Envoy LED States
- 24 LED Behavior at Initial Start Up
- 24 Initial Communications Check
- 24 More about Device Communications States
- 24 Initiate a New Scan for Microinverters
- 25 Connecting to IQ Commercial Envoy
- 25 Connect Using the Installer Toolkit App
- 25 Method A: Use the Site’s Wireless Router to Connect to the IQ Commercial Envoy
- 25 Method B: Create a Wireless Access Point
- 26 Complete the Connection to IQ Commercial Envoy with Installer Toolkit
- 26 Once your mobile device and the Envoy are on the same LAN, you can connect to the IQ Commercial Envoy.
- 27 Refer to enphase.com/installer-toolkit/ for more information on the Enphase Installer Toolkit.
- 28 Connect Remotely Using Enlighten
- 29 Connect Using the IQ Commercial Envoy Local Interface
- 29 View Production Readings
- 30 View or Change Monitoring Settings
- 30 View Cellular Connection Information
- 30 View or Change Ethernet Settings
- 31 View or Change Wi-Fi Settings
- 32 Diagnose Network Connection
- 32 Select Diagnostic Tools to ping the Envoy, check network connectivity, and check the network route.
- 33 View Microinverter Information
- 33 View Envoy Information
- 33 Open a Connection for Enphase Troubleshooting
- 34 Troubleshooting
- 34 The following sections describe possible problems and solutions.
- 34 Device Detection Issues
- 34 Troubleshoot power line communication issues as follows.
- 34 Issue: Installer Toolkit Shows “Cross Domain Traffic Reported”
- 34 This means that communications from other Envoy(s) have been detected. To prevent this issue:
- 34 Issue: Device Communications LED is Solid Amber
- 34 Issue: Installer Toolkit Detects Fewer Microinverters than Expected
- 35 Issue: No Microinverters are Reporting
- 35 Check for the following conditions.
- 35 Issue: Installer Toolkit Indicates that Scanning is Inhibited
- 35 Power Production Issues
- 35 Issue: Power Production LED is solid amber
- 36 Internet Connection Issues
- 36 Issue: Network Communications LED is Amber or Off
- 36 Issue: Wi-Fi Problems
- 37 Issue: Cellular Modem Connection Status “Not Connected”
- 37 Issue: IQ Commercial Envoy is not Connecting with a New Router
- 38 Local Networking Considerations
- 38 DHCP versus Static IP Addressing
- 38 MAC Filtering
- 38 Firewall Settings
- 39 Microinverter Issues
- 39 Clear “DC Resistance Low - Power Off” Condition
- 41 Replacing an IQ Commercial Envoy
- 41 If Enphase Customer Support authorizes an IQ Commercial Envoy replacement (RMA), perform the following steps.
- 43 Technical Data