advertisement
![4.5.4 Firmware Upgrade. Planet POE-2400, POE-1200 | Manualzz 4.5.4 Firmware Upgrade. Planet POE-2400, POE-1200 | Manualzz](http://s1.manualzz.com/store/data/003392338_1-b3c95b72887b90b2f7e2b26bb9163a60-360x466.png)
4.5.4 Firmware Upgrade
This section provides firmware upgrade of PoE Injector Hub, after choose this function and the following screen appears in
Figure 4-17 . Please press “Update” button to continue following firmware upgrade process.
Figure 4-17 Firmware Upgrade screen
Please wait for two seconds and the page will show to next firmware upgrade web page, the screen in Figure 4-18 appears.
Figure 4-18 Firmware Upgrade screen
Please press “Browser” to locate the latest firmware of PoE Injector Hub that deposit in your PC and press “Upgrade” to start the firmware upgrade process. The screen in Figure 4-19 appears.
25
Figure 4-19 Firmware Upgrade screen
Do not power off the PoE Injector Hub until the update progress is complete.
Do not quit the Firmware Upgrade page without press the “Upgrade” button - after the image is loaded. Or the system won’t apply the new firmware. Users have to repeat the firmware upgrade processes again.
4.6 Logout
Press this function; the Web interface will go back to login screen. The screens in Figure 4-20 and Figure 4-21 appear.
Figure 4-20 Logout dialogues screen
26
Figure 4-21 Login screen
27
advertisement
Related manuals
advertisement
Table of contents
- 4 1. INTRODUCTION
- 8 2. INSTALLATION
- 8 2.1.1 Injector Front Panel
- 9 2.1.2 LED Indicators
- 9 2.1.3 Injector Rear Panel
- 10 2.2.1 Desktop Installation
- 11 2.2.2 Rack Mounting
- 12 2.2.3 Network Application Installation
- 13 2.2.4 Power over Ethernet Powered Device
- 14 3 MANAGEMENT
- 14 3.3.1 Web Management
- 16 3.3.2 PLANET Smart Discovery Utility
- 18 4 WEB CONFIGURATION
- 20 4.3.1 System Information
- 20 4.3.2 IP Configuration
- 21 4.3.3 Password Setting
- 24 4.5.1 System Reboot
- 25 4.5.2 Configuration Setting
- 27 4.5.3 Alert Trap Configuration
- 28 4.5.4 Firmware Upgrade
- 31 5. POWER OVER ETHERNET OVERVIEW
- 33 6. THE POE PROVISION PROCESS
- 35 7 TROUBLESHOOTING
- 36 APPENDIX A
- 39 APPENDIX B