Configuring Procedures. Schneider Electric EcoStruxure Augmented Operator Advisor - Builder
Pubblicità
Pubblicità
Builder
Deleting a Procedure
Step
1
2
3
Action
Select the PROCEDURES tab.
In the project structure in the left sidebar, right-click on the procedure to remove and choose
Remove .
Result: A confirmation window appears.
Click Remove .
Configuring Procedures
Configuring a Procedure
To configure a procedure:
70 EIO0000003006.12
Step
1
Action
Select the PROCEDURES tab and click configure.
Result: A procedure diagram is displayed: in the Diagram column of the procedure to
Builder
2
3
4
5
Drag and drop the required step icons from the toolbar onto the procedure chart.
Connect the steps together, page 72
.
Configure the steps:
•
•
Multiple choice steps, page 74
•
When the procedure is complete, save your changes.
Result: The procedure is added to the list of procedures.
Tips for Working with Procedures
Click and drag a step to move a step to a different position.
Click a step to select it. You can then configure its properties in the right sidebar, or press
Delete to remove it from the procedure.
EIO0000003006.12
71
Builder
Use the central scroll button on the mouse to zoom in or out of the procedure.
Connecting Standard Steps, Multiple Choice Steps, and
Subprocedures
Step
1
Action
Move the mouse over the step.
Result: Two connection handles appear. A standard step has 2 connection handles:
2 Move the mouse over the top connection handle and drag the mouse towards another step in the procedure until an arrow appears. For example, to connect a standard step to the Start step:
72 EIO0000003006.12
Builder
Step
3
Action
Similarly, you can move the mouse over the bottom connection handle and drag down to make a connection to the next step to be executed. For example:
4 Multiple choice steps have 3 connection handles:
• One to connect to the previous step.
• One to connect to the next step when Option 1 evaluates to “true”.
• One to connect to the next step when Option 2 evaluates to “true”.
Refer to
Configuring a Multiple Choice Step, page 74 .
Configuring a Standard Step
Step
1
2
3
EIO0000003006.12
Action
Click the standard step box to select it and display its properties in the right sidebar.
Type the step label: the text that appears when the procedure step appears on the tablet.
Optionally, type a short description of the step. This description appears when the list of procedures is displayed.
73
Builder
Step
4
5
6
7
8
Action
In the Sticker box, enter the action to be performed by the operator.
Select the sticker position. This is the area of the tablet screen that the sticker appears on. For example, choose Top right to display the step in the top right corner of the tablet.
Optionally, select Attach content and define any content to associate with the step. This can be to open a document or an external application, or to display the real-time value of a variable.
Optionally, select Attach to scene if you only want the
step to appear when the operator user is in front of a specific scene, page 75 .
NOTE: When the step is executed, the points of interest of the scene attached to the step will
only be visible if they are associated to that step, page 76 .
Click Validate .
Configuring a Multiple Choice Step
Step
1
2
3
4
5
6
7
Action
Click the multiple choice step box to select it and display its properties in the right sidebar.
Type the step label: the text that appears when the procedure step appears on the tablet.
Optionally, type a short description of the step. This description appears when the list of procedures is displayed.
In the Sticker box, enter the question that the operator is to reply to, and the two reply options,
Option 1 and Option 2 .
When the operator taps the left option, the step connected to the left connection handle appears next.
When the operator taps the right option, the step connected to the right connection handle appears next.
Select the sticker position. This is the area of the tablet screen that the sticker appears on. For example, choose Top right to display the step in the top right corner of the tablet.
Optionally, select Attach to scene if you only want the
step to appear when the operator user is in front of a specific scene, page 75 .
NOTE: When the step is executed, the points of interest of the scene attached to the step will only be visible if they are
associated to that step, page 76 .
Click Validate .
74 EIO0000003006.12
Builder
Configuring a Subprocedure
A subprocedure is a previously created procedure that is run before continuing with the next step.
Step
1
2
3
4
5
Action
Click the subprocedure box to select it and display its properties in the right sidebar.
Type the step name.
Optionally, type a short description of the step. This description appears when the list of procedures is displayed.
Select an existing procedure to run.
Click Validate .
Attaching a Scene to a Procedure Step
You can attach a scene to a procedure step.
The required scene must first be made available in the relevant area that is found in the
PROCEDURES tab:
Step
1
2
3
Action
Select the PROCEDURES tab.
Under Scenes , in the left sidebar, select the area where you want the scene to be available.
4
Click in the toolbar.
Either select an existing scene from the list, or you can create a new scene to be added.
You can then attach the scene to your procedure step as follows:
Step
1
2
3
4
Action
Select the PROCEDURES tab.
Select the required procedure in the left sidebar.
Select the step where the scene will be attached.
Select the checkbox Attach to scene and choose the scene from the list.
EIO0000003006.12
75
Builder
Step
5
6
Action
Optionally, activate Full screen to display the attached scene in full screen without needing to recognize it.
Click Validate .
Result: The attached scene is displayed in the bottom right corner of the main screen.
Adding Points of Interest to a Scene in a Procedure Step
Points of interest are not shared between the SCENES tab and the PROCEDURES tab.
You can add points of interest to a scene that will only be visible when the scene is used in a procedure:
Step
1
2
3
Action
Select the PROCEDURES tab.
Select the required scene in the scene structure in the left sidebar.
Drag and drop one of the icons from the toolbar onto the scene image:
Text .
List .
Variable .
4
5
Image .
Configure the point of interest.
Repeat steps 1 and 2 to add other points of interest to the scene.
Associating the Points of Interest of an Attached Scene to a Step
76
Only points of interest that are associated to a step are visible when that step is executed.
You can associate or disassociate points of interest to a step as follows:
EIO0000003006.12
Builder
Step
1
2
3
4
5
Action
Select the PROCEDURES tab.
Select the required procedure in the left sidebar.
Result: The associated diagram appears.
In the diagram, select a step with an attached scene.
Result: The attached scene is displayed in the bottom right corner of the main screen.
Click the attached scene.
Result: The attached scene and its points of interest are displayed.
NOTE:
• Points of interest that are not yet attached to the step are semi-transparent.
• You can also filter which points of interest are displayed in the scene. Select an option in the Point of interest filter box:
◦ All (default value)
◦ Displayed in step
◦ Associated to step
Right-click on a point of interest to create or cancel an association with the step.
NOTE: You can also add new points of interest to the attached scene.
Removing a Scene from a Procedure Step
Step
1
2
3
4
5
Action
Select the PROCEDURES tab.
Select the procedure in the project structure in the left sidebar.
Select the step.
Clear the checkbox Attach to scene .
Click Validate .
EIO0000003006.12
77
Scarica
Pubblicità