7.4 Service Dialing Failure. Huawei Technologies QISGRFU-1900

Add to My manuals
129 Pages

advertisement

7.4 Service Dialing Failure. Huawei Technologies QISGRFU-1900 | Manualzz

BTS3900(A) GSM

Commissioning Guide 7 FAQs for BTS Commissioning

7.4 Service Dialing Failure

This describes the fault symptom and analyzes the cause of the service dialing failure. It also provides the fault handling suggestions.

Fault Symptom

Service dialing failure may occur in either of the following cases: l l

Location update failure

Service dialing failure

Cause Analysis and Handling Suggestion

Table 7-4

lists the possible causes and related suggestions.

Table 7-4 Possible causes and handling suggestions for service dialing failure

Cause of the Fault Handling Suggestion

The MS is faulty.

Replace the MS with a new one.

The CS domain or the PS domain on the CN side is not ready.

Keep the CS domain and the PS domain ready.

7.5 Low GPRS Data Transmission Rate

This describes the fault symptom and analyzes the cause of low GPRS data transmission rate.

Fault Symptom

During the service test, the following problems may occur: low GPRS data rate in the PS domain of the newly added BTS, or a high BER on the Abis interface.

Cause Analysis

The possible causes are as follows: l

The E1 cable is not properly grounded. You can enable the grounding status of the E1 cable by setting the DIP switch SW2 on the GTMU .

Table 7-5

describes the DIP switch SW2 .

Table 7-5 Description of the DIP switch SW2 on the GTMU

Setting of DIP Bit

1

ON

2

ON

3

ON

4

ON

Description

The E1 cable is grounded.

OFF OFF OFF OFF The E1 cable is not grounded.

Issue 02 (2009-04-20) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

7-7

7 FAQs for BTS Commissioning

BTS3900(A) GSM

Commissioning Guide l l l

If...

Only one end of the E1 cable is grounded,

Then...

The E1 cable is grounded properly.

Both ends of the E1 cable are grounded, The E1 cable is not grounded properly.

The data configuration negotiated between the BSC and the BTS is not consistent.

The cell signals are weak.

The MS capability is limited.

7-8 Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

Issue 02 (2009-04-20)

BTS3900(A) GSM

Commissioning Guide 8 Commissioning Record Data Sheet

8

Commissioning Record Data Sheet

Issue 02 (2009-04-20)

This describes the data sheet that is used to record the process and result of the BTS commissioning.

Table 8-1 Data sheet for BTS commissioning

Site Name

BTS Model

Commissioning

Time

Commissioning

Engineer

Scenario □ Transmission available scenario □ Transmission unavailable scenario

□ Successful □ Failed Commissioning

Result

Commissioning Item

Commissioning

Preparation Phase

Commis sioning

Phase

Transmis sion

Unavaila ble Phase

The resources required for commissioning are available.

The commissioning requirements are met.

You have logged in to the BTS through the SMT.

The BTS board and logical objects are available.

The current software version is correct.

Conclusion Handling

Exceptional Case

Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

8-1

8 Commissioning Record Data Sheet

The transmission between the

BBU and the RXU is normal.

No other alarms are reported except the alarms related to the transmission.

The hardware connections are correct.

Site management rights are released.

The transmission between the BBU and the

BSC is available.

Transmis sion

Availabl e Phase

(on the

LMT)

The transmission between the

BBU and the RXU and the transmission between the BBU and the BSC is normal.

The transmission between cascaded BTSs is normal.

The transmission between

BTSs in ring topology is normal.

The board configuration is correct and the boards are in normal operation.

The current software version is correct.

The hardware installation and the data configuration are consistent with each other.

Optional

Commiss ioning

Task

No alarms related to the BTS are reported.

The CS service test is successful.

The PS service test is successful.

The environment monitoring alarm is reported normally.

The VSWR is correct. Record the value of the VSWR.

The output power of the TRX is normal. Record the value of the output power per carrier.

8-2 Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

BTS3900(A) GSM

Commissioning Guide

Issue 02 (2009-04-20)

BTS3900(A) GSM

Commissioning Guide 8 Commissioning Record Data Sheet

The antenna system is properly connected.

The result of the carrier loopback test is normal.

The result of the channel loopback test is normal.

The DIP switch settings are correct.

Commis sioning

Result

Unsolved Problems

After

Commissioning

Unsolved Problems Impact

Issue 02 (2009-04-20) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

8-3

BTS3900(A) GSM

Commissioning Guide 9 Communication Ports Used by the GBTS

9

Communication Ports Used by the GBTS

Table 9-1

lists the communication port used by the GBTS

Table 9-1 The Communication Port Used by GBTS

Prot ocol

Side

A

Side

A

Ports

(Liste ning)

Side B Side

B

Ports

(Lau nch)

Service

TCP GBT

S

700 SMT 1024-

65535

It will be used by SMT for local maintenance before GBTS connects in the network

-

Authe nticati on

Issue 02 (2009-04-20) Huawei Proprietary and Confidential

Copyright © Huawei Technologies Co., Ltd.

9-1

advertisement

Related manuals

advertisement

Table of contents