AllSync Plus Clock Installation & Operation Guide


Add to my manuals
34 Pages

advertisement

AllSync Plus Clock Installation & Operation Guide | Manualzz

AllSync Plus Clock Installation

& Operation Manual

Installation

Metal Surface Mount Clock Installation

Warning: The AllSync Plus metal surface mount clock should be mounted according to these instructions to meet UL clock listing.

1. Remove the AllSync Plus clock, mounting bracket, and wiring harness (if applicable) from the packaging.

2. Snap female (wall half) connector into mounting bracket.

3. Using UL approved wire nuts, make connections between flying leads and wiring inside electrical box.

a. Black wire should be connected to hot (run) wire from the master.

b. Red wire should be connected to the correction line from the

master clock.

c. White wire should be connected to the neutral line.

d. Green wire should be connected to earth ground.

Note: All wiring connections should be made in accordance to local and national electrical codes.

4. Bundle all wall wiring and female connector wiring inside back box and place mounting bracket over back box opening, bent side up.

5. Screw mounting bracket to electrical box.

6. Connect clock wiring using connector attached to clock.

7. Hang clock on mounting bracket and secure using screw through the top of the clock.

© American Time

9

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals