advertisement
Installation
AllSync Plus Clock Installation
& Operation Manual
Plastic Double Dial Clock Installation
Warning:
The AllSync Plus plastic double dial clock should be mounted according to these instructions to meet UL clock listing.
1. Remove the AllSync Plus plastic double dial clock from packaging.
General Operation
2. Using UL approved wire nuts, make connections between flying leads and wiring inside electrical box. a. Black wire should be connected to hot (run) wire from the
master. b. Red wire should be connected to the correction line from the
master clock.
c. White wire should be connected to the neutral line.
d. Green wire should be connected to earth ground.
Note: All wiring connections should be made in accordance to local and national electrical codes
3. Remove box plate from double dial clock by removing acorn nuts at base of clock.
4. Bundle wires inside electrical box.
5. Attach box plate to electrical box.
6. Connect clock to box plate using acorn nuts removed in step 3.
12
© American Time
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 6 Electrical Connections
- 7 Plastic Surface Mount Clock Installation
- 9 Metal Surface Mount Clock Installation
- 10 Metal Round Double Dial Clock Installation
- 12 Plastic Double Dial Clock Installation
- 13 Metal Square Double Dial Clock Installation
- 14 AllSync Plus Startup Routine
- 16 AllSync Plus accuracy
- 16 Movement corrections
- 17 Start Up Example Operation
- 20 AllSync Plus Flush Metal Case Specifications
- 22 AllSync Plus Flush Plastic Case Specifications
- 24 AllSync Plus Dual Motor Metal Case Specifications
- 26 AllSync Plus Dual Motor Plastic Case Specifications
- 28 AllSync Plus Surface & Double Dial Metal Case Specifications
- 30 AllSync Plus Surface & Double Dial Plastic Case Specifications