AllSync Plus Clock Installation & Operation Guide


Add to my manuals
34 Pages

advertisement

AllSync Plus Clock Installation & Operation Guide | Manualzz

Installation

AllSync Plus Clock Installation

& Operation Manual

Plastic Double Dial Clock Installation

Warning:

The AllSync Plus plastic double dial clock should be mounted according to these instructions to meet UL clock listing.

1. Remove the AllSync Plus plastic double dial clock from packaging.

General Operation

2. Using UL approved wire nuts, make connections between flying leads and wiring inside electrical box. a. Black wire should be connected to hot (run) wire from the

master. b. Red wire should be connected to the correction line from the

master clock.

c. White wire should be connected to the neutral line.

d. Green wire should be connected to earth ground.

Note: All wiring connections should be made in accordance to local and national electrical codes

3. Remove box plate from double dial clock by removing acorn nuts at base of clock.

4. Bundle wires inside electrical box.

5. Attach box plate to electrical box.

6. Connect clock to box plate using acorn nuts removed in step 3.

12

© American Time

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals