Connector Module Installation
5.1
Installation
Please note: The module should only be installed by trained personnel.
DANGER!
The device contains hazardous voltages.
1. Pull out the mains plug of the OpenCom 130 / 150.
2. Open the housing cover of the OpenCom 130 / 150.
3. On the module board, remove the protective covers of the two S
2M
slots (A) and (B).
S
2M
slots
B
A
Activity LED
PCM LAN 1 LAN 2
Position of the S
2M
slots on the module board
4. Insert the S
2M
module into the slots, making sure you insert the LED side of the module into the upper slot (B).
69
S
2M
Connector Module
1 2
3 4
S
2M
LEDs
S
2M
slot
(Underside of the module board)
Installation
Position of the LEDs on the
S
2M
module
5. Wire the S
2M
port of the connector module to the NT or the other PBX according to the following drawing. Make sure the RX and TX lines are crossed over (connect the RX lines of the OpenCom 130 / 150 to the TX lines of the other PBX).
PBX 1, S
2M
Rx+ RxTx+ Tx-
Rx+ RxTx+ Tx-
PBX 2, S
2M
(Pressure clamps)
Example of the wiring of the S2M port for two OpenCom 130 / 150s
On the OpenCom 150 the pressure terminal is a 5-pin connector. The additional terminal is used to connect the shielding of a shielded line. The shielding has to be stripped as short as possible (approx. 3 mm).
6. If necessary, check to make sure that the NT is fed by its own power supply.