QUARTERLY MAINTENANCE. Stratasys FORTUS 900MC

Add to My manuals
72 Pages

advertisement

QUARTERLY MAINTENANCE. Stratasys FORTUS 900MC | Manualzz

QUARTERLY MAINTENANCE

CLEAN THE TIP SENSOR PLUNGER

1. Remove the plunger - gently pull up and out.

2. Remove material residue on the top of the plunger with a razor blade.

3. Replace the plunger in the sensor bracket making sure the flat surface is up.

Tip Sensor Plunger

Tip Sensor Bracket

50

advertisement

Key Features

  • Advanced FDM Technology for High Precision and Detail
  • Wide Range of Engineering-Grade Materials for Diverse Applications
  • Large Build Volume for Large-Scale Projects
  • Heated Build Chamber for Dimensional Stability
  • Intuitive Control Panel for Ease of Use
  • Connectivity Options for Remote Monitoring and Control
  • Integrated Camera for Remote Build Monitoring

Related manuals

Frequently Answers and Questions

What is the maximum build volume of the FORTUS 900MC?
The FORTUS 900MC offers a generous build volume of 914 x 610 x 914 mm (36 x 24 x 36 inches), allowing you to produce large-scale 3D printed objects.
What materials are compatible with the FORTUS 900MC?
The FORTUS 900MC is compatible with a wide range of engineering-grade materials, including ABS-M30, ABS-ESD7, ASA, PC-ABS, ULTEM 1010, ULTEM 9085, and SR-30.
Does the FORTUS 900MC have a heated build chamber?
Yes, the FORTUS 900MC features a heated build chamber that maintains a consistent temperature during printing, minimizing warping and ensuring dimensional stability.

advertisement

Table of contents