Commissioning Guide 8 Commissioning Record Data Sheet
8
Commissioning Record Data Sheet
Issue 02 (2009-04-20)
This describes the data sheet that is used to record the process and result of the BTS commissioning.
Table 8-1 Data sheet for BTS commissioning
Site Name
BTS Model
Commissioning
Time
Commissioning
Engineer
Scenario □ Transmission available scenario □ Transmission unavailable scenario
□ Successful □ Failed Commissioning
Result
Commissioning Item
Commissioning
Preparation Phase
Commis sioning
Phase
Transmis sion
Unavaila ble Phase
The resources required for commissioning are available.
The commissioning requirements are met.
You have logged in to the BTS through the SMT.
The BTS board and logical objects are available.
The current software version is correct.
Conclusion Handling
Exceptional Case
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8-1
8 Commissioning Record Data Sheet
The transmission between the
BBU and the RXU is normal.
No other alarms are reported except the alarms related to the transmission.
The hardware connections are correct.
Site management rights are released.
The transmission between the BBU and the
BSC is available.
Transmis sion
Availabl e Phase
(on the
LMT)
The transmission between the
BBU and the RXU and the transmission between the BBU and the BSC is normal.
The transmission between cascaded BTSs is normal.
The transmission between
BTSs in ring topology is normal.
The board configuration is correct and the boards are in normal operation.
The current software version is correct.
The hardware installation and the data configuration are consistent with each other.
Optional
Commiss ioning
Task
No alarms related to the BTS are reported.
The CS service test is successful.
The PS service test is successful.
The environment monitoring alarm is reported normally.
The VSWR is correct. Record the value of the VSWR.
The output power of the TRX is normal. Record the value of the output power per carrier.
8-2 Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
BTS3900(A) GSM
Commissioning Guide
Issue 02 (2009-04-20)
BTS3900(A) GSM
Commissioning Guide 8 Commissioning Record Data Sheet
The antenna system is properly connected.
The result of the carrier loopback test is normal.
The result of the channel loopback test is normal.
The DIP switch settings are correct.
Commis sioning
Result
Unsolved Problems
After
Commissioning
Unsolved Problems Impact
Issue 02 (2009-04-20) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8-3
advertisement
Related manuals
advertisement
Table of contents
- 3 Contents
- 5 Figures
- 9 Tables
- 11 About This Document
- 15 1 Changes in BTS3900(A) GSM Commissioning Guide
- 17 2 General Requirements for the Commissioning
- 18 2.1 Commissioning Resources
- 19 2.2 Commissioning Prerequisites
- 21 3 Commissioning Procedure
- 27 4 Commissioning the BTS (Transmission Available)
- 28 4.1 Starting the LMT
- 30 4.2 Checking the Transmission and Networking
- 31 4.2.1 Checking the Transmission Between the RRU and the BBU or Between the BBU and the BSC on the LMT
- 32 4.2.2 Checking the Transmission Between Cascaded BTSs
- 34 4.2.3 Checking the Transmission Between BTSs in Ring Topology
- 37 4.3 Checking Software Version and Data Configuration
- 37 4.3.1 Checking the Board Configuration and Status on the LMT
- 39 4.3.2 Checking the Current Software Version on the LMT
- 40 4.3.3 Checking the Consistency Between Hardware Installation and Data Configuration
- 45 4.4 Checking the Alarm Information of the BTS (on the LMT)
- 48 4.5 Commissioning the BTS Services
- 49 4.5.1 Testing the CS Services
- 51 4.5.2 Commissioning PS Services
- 52 4.6 Checking the BTS Environment Alarms
- 52 4.6.1 BTS Environment Alarm Types
- 54 4.6.2 Checking the Environment Monitoring Alarms on the LMT
- 61 5 Commissioning the BTS (Transmission Unavailable)
- 62 5.1 Starting the Site Maintenance Terminal
- 62 5.1.1 Setting the IP Address of the Site Maintenance Terminal PC
- 63 5.1.2 Locally Connecting the SMT PC to the BTS
- 63 5.1.3 Logging in to the BTS at the Local End
- 65 5.2 Configuring the Basic Data of the BTS
- 66 5.2.1 Obtaining the Site Management Rights
- 67 5.2.2 Configuring the Boards of the BTS on the SMT
- 71 5.2.3 Configuring Logical Objects of the BTS on the SMT
- 83 5.3 Checking the Active Software Version on the SMT
- 85 5.4 Checking the Transmission Between the BBU and RFU on the BTS Side
- 86 5.5 Checking the Running Status of the BTS
- 86 5.5.1 Checking the State of the BTS LEDs
- 89 5.5.2 Checking the Alarm Information of the BTS on the SMT
- 92 5.6 Checking the Hardware Connection of the BTS
- 95 6 Optional Commissioning Tasks
- 96 6.1 Commissioning the Antenna System
- 96 6.1.1 Measuring the VSWR
- 97 6.1.2 Monitoring the Output Power of TRXs
- 99 6.1.3 Checking the Antenna Connection
- 100 6.2 Performing the Loopback Test
- 100 6.2.1 Performing the Carrier Loopback Test
- 102 6.2.2 Performing Channel Loopback Tests
- 103 6.3 Checking the DIP Switch Settings of the Boards
- 104 6.4 Locally Checking the Transmission Between the BBU and the BSC
- 106 6.5 Checking the Transmission Between Cascaded TRXs
- 108 6.6 Checking TRXs in Ring Topology
- 117 7 FAQs for BTS Commissioning
- 118 7.1 Failed Communication Between the SMT and the BTS
- 118 7.2 Faulty E1 Link
- 122 7.3 Failure of an MS to Search the Network
- 123 7.4 Service Dialing Failure
- 123 7.5 Low GPRS Data Transmission Rate
- 125 8 Commissioning Record Data Sheet
- 129 9 Communication Ports Used by the GBTS