Installation
2 Installation
2.1 Installation Process
178.4
163.2
71.7
C
D
M3 x 0.5
20
6 mm min. (4x)
M4 x 0.7
6 mm min. (4x)
34
•
•
•
The following is needed:
A Phillips screwdriver for installation of the M12 protection bracket
Four M5 × 0.8 screws conforming to the table above
Installation tool for mounting screws
1. Unpack and check the delivery. If damage is found, notify the supplier.
Note:
Place the operator panel on a stable surface during installation.
Dropping the operator panel or letting it fall may cause damage.
2. Attach UL certified and approved cables to the operator panel. Approved cables include:
–
–
–
900-1616-01 cable TxBR-2 M12 female 4p to blank 3 meter (pwr) [EX]
900-1618-01 cable TxBR-2 M12 male 4p to blank 3 meter (lan) [EX]
900-1621-01 cable TxBR-2 M12 male 8p to blank 3 meter (com) [EX]
Other lengths may also be available; please contact Beijer Electronics for details.
Beijer Electronics, MAEN276 11
Installation
3. Drill the correct hole pattern in panel outlined above or install unit on VESA compliant mounting bracket.
–
Connect cable A to the terminal, using 14-20 AWG (2.08–0.52 mm 2 ),
180–220 N-cm torque.
Note:
Use minimum 85°C copper conductors only.
12 Beijer Electronics, MAEN276
advertisement
Related manuals
advertisement
Table of contents
- 7 1 Safety Precautions
- 7 General
- 7 Hazardous Materials
- 8 Disposal Requirements Under WEEE Regulations
- 8 UL and cUL Installation
- 9 IECEx/ATEX Certificate and Dust Rating
- 9 Conditions of Safe Use for Zone 2/22 ATEX/IECEx
- 9 During Installation
- 10 During Use
- 10 Service and Maintenance
- 10 Dismantling and Scrapping
- 11 2 Installation
- 11 Installation Process
- 13 Protective Connector Shield Installation Process
- 14 Connections to the Controller
- 14 Other Connections and Peripherals
- 15 3 Technical Data
- 17 4 Chemical Resistance
- 17 Metal Casing
- 19 5 Operator Panel Drawings
- 19 Connectors
- 19 Power Supply
- 19 COM A
- 20 LAN A / LAN B
- 20 COM B
- 21 BoX2 extreme Outline
- 23 6 Additional Installation Tips
- 23 Grounding the operator panel
- 23 To Achieve Better EMC Protection
- 25 Safety
- 26 Galvanic Isolation
- 27 Cable and Bus Termination RS