![Connections to the Controller. Beijer Electronics BoX2 extreme | Manualzz Connections to the Controller. Beijer Electronics BoX2 extreme | Manualzz](http://s1.manualzz.com/store/data/068142386_1-5917d613805a384790bbad5b31a6eca9-360x466.png)
Installation
Note:
The protective connector shield is required to be used on all applications.
2.1.2
Connections to the Controller
For information about the cables to be used when connecting the operator panel to the controller, please refer to the help file for the driver in question.
2.1.3
Other Connections and Peripherals
Cables, peripheral equipment and accessories must be suitable for the application and its environment. For further details or recommendations, please refer to the supplier.
14 Beijer Electronics, MAEN276
advertisement
Related manuals
Download
PDF
advertisement
Table of contents
- 7 1 Safety Precautions
- 7 General
- 7 Hazardous Materials
- 8 Disposal Requirements Under WEEE Regulations
- 8 UL and cUL Installation
- 9 IECEx/ATEX Certificate and Dust Rating
- 9 Conditions of Safe Use for Zone 2/22 ATEX/IECEx
- 9 During Installation
- 10 During Use
- 10 Service and Maintenance
- 10 Dismantling and Scrapping
- 11 2 Installation
- 11 Installation Process
- 13 Protective Connector Shield Installation Process
- 14 Connections to the Controller
- 14 Other Connections and Peripherals
- 15 3 Technical Data
- 17 4 Chemical Resistance
- 17 Metal Casing
- 19 5 Operator Panel Drawings
- 19 Connectors
- 19 Power Supply
- 19 COM A
- 20 LAN A / LAN B
- 20 COM B
- 21 BoX2 extreme Outline
- 23 6 Additional Installation Tips
- 23 Grounding the operator panel
- 23 To Achieve Better EMC Protection
- 25 Safety
- 26 Galvanic Isolation
- 27 Cable and Bus Termination RS