7 Starting the application. Schneider Electric FTX117, Terminal
Publicitate
Publicitate
7
Starting the application
7.1
General
The TSX PLC editor is used to start the application in the PLC. The program must, to TSX).
The mode is accessed using eeeee 11111
.
It offers the following options for starting
Reference of connected the application : PLC status :
PLC
RUN or STOP
TSX PLC Editor
• 0 Inf Information on PLC status
• 1 Run/Stop
TSX: STOP
App=Exec
TSX 07 31-16
-
1Run 2Ini 3Rtc
• 2 Ini Initialize the application
• 3 Rtc Program schedule blocks (see Section 5)
Application status :
Executable, not executable, or not recognized
• 4 Clk Set the internal clock.
7.2
Setting the time and date (4 Clk) m4
This option sets the time and date in the PLC. This operation must be performed when
• Select the day of the week using
• Access selection of the day using day using the numeric keypad.
• Access selection of the month using the month using or .
• Access selection of the year using
• Access selection of the time using
• Confirm the setting using zzzzz
.
>>>>>
¨¨¨¨¨
or
<<<<<
.
, and enter the
, and select
-
Fr 10 Mar1994
17:26:48
STP= 2 Jan 1996
2 17:07:23
, and enter it using the numeric keypad.
, and enter it using the numeric keypad.
Note : The lower two lines of the screen display the last date and time the PLC stopped.
A code shows the reason for the stop :
• 1= RUN changed to STOP by the terminal
• 2= stop on a software fault (watchdog timeout)
• 4= power outage
• 5= stop on hardware fault
___________________________________________________________________________
7/1
C
C
7.3
Initialize (2 Ini) m 2
This command initializes the PLC application. It should be used before the application is first set to RUN or after every modification of the application. The zzzzz
22222
accesses the initialization confirmation
starts initialization.
TSX->Ini?
Y:Enter N:Esc m 1
7.4
mmmmm
After
11111 zzzzz
accesses the PLC RUN confirmation screen
starts PLC RUN (or STOP) mode.
is pressed, the PLC state (RUN or STOP) will be displayed on the PLC operations screen.
TSX->RUN?
Y:Enter N:Esc
It is also possible to check the operating state of the PLC on the front panel :
• The RUN indicator lamp flashes when the PLC is in
STOP.
• The RUN indicator lamp is lit continuously when the
PLC is in RUN.
• The RUN indicator lamp is not lit and the error indicator lamp is flashing.
TSX : RUN
APP : Exec
TSX 07 31-16
1Run 2Ini 3Rtcr
Note : If the RUN or STOP command does not take effect, check that an input has not been configured to control the PLC RUN/STOP command. In this case the input takes priority over the terminal.
7.5
Information (0 Inf) m 0
This screen gives, in addition to the information on the TSX editor initial screen, information on the
PLC status :
• OK : if no hardware fault is detected
• ! : if a hardware fault is detected
TSX : RUN
APP : Exec
TSX 07 31-16
Mod0=OK
___________________________________________________________________________