Installation Checklist

After installation, security check should be conducted using the following checklist.

Table 11: Installation checklist

NO STANDARDS AND REQUIREMENTS PASS NOTES

1 Constructed according to the design plan

2 The system cabinets are fixed with expansive screws

3 The cabinets are aligned

4 The installation equipment is clean

5 The installation equipment facilitates wiring

6 Cable wiring is covert

7 Cable is wired with consideration of the wiring of other systems

8 Cable pipe is laid in cable trenching

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No

9 Cable labels are clear and accurate

10 Connector coat peeling is tidy and consistent

11 Type O or U terminal is used for the connection of signal lines

12 Cable lug is reasonably used in cable connection

Yes/No

Yes/No

Yes/No

Yes/No

13 SPD earth, DC power earth and protective earth are connected correctly Yes/No

14

Leeway is left for the length of connection cable and the cable wiring is covert

Yes/No