Maintenance
5.1 Updating the Software
The UPS’s firmware can be reinstalled or updated to the latest version with this procedure.
Tools and Materials Required
• RS-232 connection to UPS (See Section 4.1).
• uBug12 software installed on your computer (http://www.technologicalarts.ca).
• Alpha Technologies firmware installed where you can access it with your computer
(available for download at www.alpha.com). The firmware is packaged as a .zip file so you will have to un-zip it and extract the .sx firmware file.
Procedure
1. Turn the UPS off (See Section 3.2.2).
Connect RS-232 if it isn’t connected.
2. Press the SELECT button. While pressing the button down, turn on the battery circuit breaker.
The LCD panel shows “Alpha XP ISP.”
3. Start uBug12.
4. Type (all lower case) con(1 space)1(or the number of the computer’s com port you are using) and press ENTER. The screen shows “connected” when the connection is made.
Alpha XP ISP
V0.0.0.1
2: Screen shows “Connected”.
1: Enter the Com Port.
5. Type (all lower case) fbulk and press
ENTER.
The erase pop-up appears. It disappears when the UPS’s memory is erased.
2: Erase pop-up appears.
1: Type fbulk.
Doc# 017-201-B0 Rev 05/07 47
FXM UPS Operator's Manual
6. Type (all lower case) fload(1 space);b and press ENTER.
A pop-up appears asking you to locate the new firmware. Look for a “sx record”
(*.sx). Select this new firmware. The fload pop-up appears.
1: Type fload ;b.
When the software is finished loading into the UPS, the pop-up shows “Loaded OK: xx seconds.”
7. Type (all lower case) exit and press
ENTER.
The uBug12 screen disappears. Turn the battery breaker off.
Firmware is loaded.
2: Look for a .sx file.
8. Turn the battery circuit breaker on.
If the reprogramming was successful, the
LCD’s logo screen appears. If it wasn’t, it shows “Alpha XP ISP” as shown in step
2. Try installing the firmware again.
Firmware Replacement Finished
Alpha
FXM
48
120/60/N
LINE
Doc# 017-201-B0 Rev 05/07
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 5 1 Introduction
- 6 1.1 Safety Checklists
- 6 1.1.1 UPS Safety Checklist
- 7 1.1.2 Battery Safety Checklist
- 8 1.2 Unpacking and Inspection Checklist
- 9 1.3 The FXM Front Panel
- 15 2 Installation
- 16 2.1 Site Preparation Checklists
- 17 2.2 Mounting the UPS
- 18 2.3 Wiring the External Batteries
- 20 2.4 Wiring the UPS
- 21 2.5 ATS/GTS Option
- 22 3 Operation
- 23 3.1 Operating the Control Panel
- 25 3.2 Turning the UPS On and Off
- 27 3.3 Replacing the Batteries
- 28 3.4 Operating the UPS
- 30 3.5 Making Measurements
- 32 3.6 Troubleshooting the UPS
- 34 3.7 Viewing the 25-Event Log
- 35 4 Communication
- 36 4.1 Wiring the RS-232 Port
- 37 4.2 Using the Main Menu
- 37 4.2.1 Main Menu Screen
- 38 4.2.2 RS-232 Menu Tree
- 39 4.2.3 Line Status
- 39 4.2.4 Output Status
- 40 4.2.5 Fault and Alarm Displays
- 41 4.3 Adjusting and Controlling the UPS
- 42 Clock
- 42 4.4.1 Programming the Dry Contacts
- 43 4.4.2 Setting the Timer Contact
- 43 4.4.3 Setting the Date and Time
- 44 4.5 100-Event Log
- 45 4.6 Novus User Software
- 45 4.6.1 Introduction
- 45 for the .NET Framework
- 46 4.6.3 Installation and Set Up
- 47 4.6.4 Operation
- 50 5 Maintenance
- 51 5.1 Updating the Software
- 53 Specifications
- 55 Index
- 58 Warrant