Lifting & Moving. Woodstock W1742W

Add to My manuals
72 Pages

advertisement

Lifting & Moving. Woodstock W1742W | Manualzz

W1742W, W1742SW, W1754W, W1754SW (Mfd. Since 05/16)

Lifting.&.Moving

The planer is equipped with four lifting bars that extend in order to lift and place the planer, as shown in

Figure.11

.

The rear wheels and front feet mount to the bottom of the machine. Therefore, the best time to assemble these components is while the machine is elevated safely by the forklift.

When. installing. rear. wheels. and. front. feet. in. Steps.

2–3,. machine. MUST. be. fully. supported. by. forklift.

to. prevent. machine. from. falling,. causing. serious.

crushing. injury. or. death.. If. machine. can. not. be.

sufficiently.supported.during.the.next.two.steps,.we.

recommend.temporarily.setting.machine.on..supports.

such.as.4.x.4.blocks.to.raise.it.off.the.ground.

HEAVY LIFT!

Straining or crushing injury may occur from improperly lifting machine or some of its parts. To reduce this risk, get help from other people and use a forklift (or other lifting equipment) rated for weight of this machine.

Lifting

Bar

(1 of 4)

To.lift.and.place.machine,.do.these.steps:

1..

Use forklift to lift machine off pallet (see

Figure.11

).

.

Tip:.

When positioning lift forks, place shop rags or cardboard between forks and cabinet stand to avoid scratching paint.

2..

While machine is elevated, install rear wheels using (2) M8-1.25 X 60 cap screws and (2) 8mm lock washers (see .Figure.12

).

Figure.11.

Lifting planer with forklift.

x 2

Rear Wheel

(1 of 2)

Figure.12.

Rear wheels installed with machine elevated by forklift.

3.

Install both front feet (see Figure.13

).

4.

Set machine down in suitable location.

Front Foot

(1 of 2)

Figure.13.

Front feet installed with machine elevated by forklift.

-17-

advertisement

Related manuals

advertisement