- No category
advertisement
Chapter 6: Optional Equipment Installation
Figure 6-4. User Connectors on standard Joint 2. IP-65 Joint 2 on right.
NOTE: The connectors shown in Figure 6-4 are not available on the outside of this
link for the IP-65 version Cobra s800 Inverted. Refer to User Connectors on page
NOTE: See Connecting Digital I/O to the System on page 43 for information on the
IO Blox connector. Also refer to the
Adept IO Blox User's Guide
for details.
User Electrical Lines
There is a 25-pin male connector (24 conductor) on the robot user panel on the back of Joint 1
for user electrical lines (see Figure 6-3). This connector is wired directly to a 25-pin female
connector on the top of the outer link (see Figure 6-4). These connectors can be used to run user
electrical signals from the user panel, through the robot, and up to the outer link.
NOTE: The connectors shown in Figure 6-4 are not available on the outside of this
link for the IP-65 version of the Cobra s800 Inverted. Refer to User Connectors on page 133.
Wire Specifications: Wire size: 0.1 mm
2
(27 AWG), Pin Numbers 1-24, 12 pairs, twisted in pairs as 1&2, 3&4, 5&6, .... 23&24. Maximum current per line: 1 Amp.
6.4 Internal User Connectors
The internal user connectors, OP3/4, EOAPWR, and ESTOP, can be accessed with the outer
Adept Cobra s800 Inverted Robot User's Guide, Rev H1
Page 78 of 142
Chapter 6: Optional Equipment Installation
Figure 6-5. Internal User Connectors - OP3/4, EOAPWR, ESTOP
WARNING: When the outer link cover is removed, you see the label shown above. Do not remove the J3-ENC or
J4-ENC encoder cable connectors from their sockets. If they are removed, the calibration data will be lost and the robot must be run through a factory recalibration process, which requires special software and tools.
Figure 6-6. SOLND Connector
Adept Cobra s800 Inverted Robot User's Guide, Rev H1
Page 79 of 142
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 11 Adept Cobra s800 Inverted™ Robots
- 12 Adept AIB™, eAIB™
- 13 Adept SmartController
- 16 Manufacturer’s Declaration of Compliance (MDOC)
- 16 Adept Robot Safety Guide
- 18 Related Manuals
- 18 Adept Document Library
- 20 Before Unpacking
- 20 Upon Unpacking
- 21 Mounting Surface
- 22 Mounting Procedure
- 29 PC Requirements
- 31 Specifications for 24 VDC Power
- 31 Details for 24 VDC Mating Connector
- 32 Creating 24 VDC Cable
- 32 Installing 24 VDC Robot Cable
- 34 Specifications for AC Power
- 36 Details for AC Mating Connector
- 36 Creating the 200-240 VAC Cable
- 37 Installing AC Power Cable to Robot
- 37 Ground the Robot Base
- 38 Grounding Robot-Mounted Equipment
- 41 Programmable E-Stop Delay
- 42 Brake Release Button
- 45 Using Digital I/O on Robot XIO Connector
- 46 Optional I/O Products
- 46 XIO Input Signals
- 48 XIO Output Signals
- 50 XIO Breakout Cable
- 52 Verifying Installation
- 53 Turning on Power and Starting Adept ACE
- 54 Enabling High Power
- 54 Verifying E-Stop Functions
- 54 Verify Robot Motions
- 57 Lubrication Procedure
- 60 Removing the AIB or eAIB Chassis
- 64 Installing a New AIB or eAIB Chassis
- 65 Safety Commissioning Utilities
- 67 E-Stop Configuration Utility
- 68 E-Stop Verification Utility
- 68 Teach Restrict Configuration Utility
- 69 Teach Restrict Verification Utility
- 71 Battery Replacement Time Periods
- 71 Battery Replacement Procedure
- 73 Installing an Encoder Battery in the Inner Link
- 75 Removing the Flange
- 76 Installing the Flange
- 76 User Air Lines
- 78 User Electrical Lines
- 80 SOLND Connector
- 80 OP3/4 Connector
- 81 EOAPWR Connector
- 82 Internal User Connector Output Specifications
- 82 ESTOP Connector
- 85 Introduction
- 86 Tools Required
- 86 Procedure
- 90 Introduction
- 90 Tools Required
- 90 Procedure
- 93 Recommended Vendors for Mating Cables and Connectors
- 94 Joint 1 Adjustable Hardstops
- 98 Joint 2 Adjustable Hardstops
- 117 Introduction
- 119 Bellows Replacement
- 121 Lubrication
- 124 Outer link
- 124 AIB/eAIB Cable Seal
- 124 Controller
- 124 Hard Stop, Rotation Range
- 126 Removing the Cable Entry Housing Cover
- 128 Installing the Cable Entry Housing Cover
- 128 Removing the Cable Entry Housing Body
- 128 Installing the Cable Entry Housing Body
- 128 Removing Outer Link Cover
- 130 Installing Outer Link Cover
- 131 Sealing the Tool Flange
- 132 Pressurizing the Robot
- 133 User Electrical and DeviceNet
- 134 User Air Lines
- 134 Robot Solenoid Option
- 134 Replacing IP-65 Bellows