- No category
advertisement
Chapter 6: Optional Equipment Installation
SOLND Connector Circuit
+24VDC
Signal 3001
For optional Robot Solenoid Kit installation, or other user supplied devices.
Pin 1
Load
(equivalent circuit)
GND
Pin 2
Signal 3002
Pin 3
Pin 4
GND
Load
OP3/4 Connector Circuit
+24VDC
Signal 3003
For optional second set of solenoids, or other user supplied devices.
Pin 1
Load
(equivalent circuit)
GND
Pin 2
Signal 3004
Pin 3
Pin 4
GND
Load
Figure 6-7. OP3/4 and SOLND Circuits
EOAPWR Connector
This 4-pin connector (see the following table) provides 24 VDC power and ground for user
applications. See the following table for the pinouts and Table 6-4 for the output specifications.
Pin #
1
2
3
4
Table 6-3. EOAPWR Connector Pinout
Pin Location Description
current specs)
Ground
current specs)
Ground
2
4
1
3
EOAPWR Connector as viewed on robot
Mating Connector:
AMP/Tyco #172167-1, 4-pin Mini-Universal Mate-N-Lok
AMP/Tyco #770985-1, Pin Contact, Mini-Univ. Mate-N-Lok
Adept Cobra s800 Inverted Robot User's Guide, Rev H1
Page 81 of 142
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 11 Adept Cobra s800 Inverted™ Robots
- 12 Adept AIB™, eAIB™
- 13 Adept SmartController
- 16 Manufacturer’s Declaration of Compliance (MDOC)
- 16 Adept Robot Safety Guide
- 18 Related Manuals
- 18 Adept Document Library
- 20 Before Unpacking
- 20 Upon Unpacking
- 21 Mounting Surface
- 22 Mounting Procedure
- 29 PC Requirements
- 31 Specifications for 24 VDC Power
- 31 Details for 24 VDC Mating Connector
- 32 Creating 24 VDC Cable
- 32 Installing 24 VDC Robot Cable
- 34 Specifications for AC Power
- 36 Details for AC Mating Connector
- 36 Creating the 200-240 VAC Cable
- 37 Installing AC Power Cable to Robot
- 37 Ground the Robot Base
- 38 Grounding Robot-Mounted Equipment
- 41 Programmable E-Stop Delay
- 42 Brake Release Button
- 45 Using Digital I/O on Robot XIO Connector
- 46 Optional I/O Products
- 46 XIO Input Signals
- 48 XIO Output Signals
- 50 XIO Breakout Cable
- 52 Verifying Installation
- 53 Turning on Power and Starting Adept ACE
- 54 Enabling High Power
- 54 Verifying E-Stop Functions
- 54 Verify Robot Motions
- 57 Lubrication Procedure
- 60 Removing the AIB or eAIB Chassis
- 64 Installing a New AIB or eAIB Chassis
- 65 Safety Commissioning Utilities
- 67 E-Stop Configuration Utility
- 68 E-Stop Verification Utility
- 68 Teach Restrict Configuration Utility
- 69 Teach Restrict Verification Utility
- 71 Battery Replacement Time Periods
- 71 Battery Replacement Procedure
- 73 Installing an Encoder Battery in the Inner Link
- 75 Removing the Flange
- 76 Installing the Flange
- 76 User Air Lines
- 78 User Electrical Lines
- 80 SOLND Connector
- 80 OP3/4 Connector
- 81 EOAPWR Connector
- 82 Internal User Connector Output Specifications
- 82 ESTOP Connector
- 85 Introduction
- 86 Tools Required
- 86 Procedure
- 90 Introduction
- 90 Tools Required
- 90 Procedure
- 93 Recommended Vendors for Mating Cables and Connectors
- 94 Joint 1 Adjustable Hardstops
- 98 Joint 2 Adjustable Hardstops
- 117 Introduction
- 119 Bellows Replacement
- 121 Lubrication
- 124 Outer link
- 124 AIB/eAIB Cable Seal
- 124 Controller
- 124 Hard Stop, Rotation Range
- 126 Removing the Cable Entry Housing Cover
- 128 Installing the Cable Entry Housing Cover
- 128 Removing the Cable Entry Housing Body
- 128 Installing the Cable Entry Housing Body
- 128 Removing Outer Link Cover
- 130 Installing Outer Link Cover
- 131 Sealing the Tool Flange
- 132 Pressurizing the Robot
- 133 User Electrical and DeviceNet
- 134 User Air Lines
- 134 Robot Solenoid Option
- 134 Replacing IP-65 Bellows