11.1.2 Tower specifications

Versions

Designation

Length of tower

Hub height

, bottom flange

, top

Weight

Segments:

Height [m]

Weight [t]

No. of platforms extr. gust (5 sec)

Wind class (GL) /

Wind zone (DiBT)

Corrosion protection

Ascent

Steel towers

E-40/S/42/2 E-40/S/44/2/01 E-40/S/44/2/02 E-40/S/49/3

42.0 m

44 m

2.606 mm

44.2 m

46 m

2.948 mm

44.2 m

46 m

2.710 mm

49.0 m

50 m

2.738 mm

1.200 mm

35.9 t

2

21/ 21

11.7/ 24.2

4

1.200 mm

35 t

2

22.5/ 21.7

12/ 23

3

1.200 mm

32 t

2

22.5 /21.7

12 /20

3

1.200 mm

43.8 t

3

21/ 21/ 7

11.7/ 20.3/ 11.8

5

70 m/s

I /

IV

70 m/s

I /

IV

56 m/s

II /

III

54.8 m/s

II /

III zinc spraying (zinc epoxy coating), with threefold top coat on the outside and twofold top coat inside safety climbing ladder installed inside the tower

Versions

Designation

Length of tower

Hub height

, bottom flange

, top

Weight

Segments:

Height [m]

Weight [t]

No. of platforms extr. gust (5 sec)

Wind class (GL) /

Wind zone (DiBT

Corrosion protection

Ascent

Steel towers

E-40/S/53/2 E-40/S/53/3 E-40/S/56/3 E-40/S/63/3

53.4 m

55 m

2.948 mm

1.200 mm

53.4 m

55 m

2.948 mm

1.200 mm

56.0 m

58 m

2.948 mm

1.200 mm

63 m

65 m

3.228 mm

1.200 mm

44 t

2

36 t

3

28.4/ 25.0

18.0/ 18.0 / 17.4

53.4 t

3

61.5 t

3

21.0/ 21.0/ 14.0 21.0/ 21.0/ 21.0

17/ 27

3

56 m/s

7.6/ 10.8/ 17.6

4

50 m/s

11.7/ 20.3/ 21.4 11.7/ 20.3/ 29.5

4

55.6 m/s

4

56.3 m/s

II /

III

II /

III zinc spraying (zinc epoxy coating), with threefold top coat on the outside and twofold top coat inside safety climbing ladder installed inside the tower