advertisement
▼
Scroll to page 2
of
44
![Assembly. ProTeam 107251, 107252 | Manualzz Assembly. ProTeam 107251, 107252 | Manualzz](http://s1.manualzz.com/store/data/006276666_1-c764b108adce7026fcadbd709da21ee7-360x466.png)
Power Nozzle
ASSEMBLY
1.
Insert braces.
2.
Install motor, brush roll, and belt. Be careful. Do not attempt to over-tighten screws.
d b a
Fully assembled power nozzle (bottom view).
3.
Additional components: a) Install sleeve and hose.
b) Install duct cover.
c) Install electronic components, Vacuum Operation Indicator Board, circuit breaker, and power nozzle lockout switch (lockout switch XP models only – not pictured).
d) Attach jumper wire to Vacuum Operation Indicator Board.
e) Make sure components are properly seated in the base.
www.pro-team.com 866.888.2168 26
advertisement
Related manuals
advertisement
Table of contents
- 3 Index
- 4 Disassembly
- 5 Index
- 6 Disassembly
- 7 Bag Lockout Switch Replacement
- 8 Hose Cap Collar Repair
- 9 Quick Release Clip Replacement
- 10 Bag Housing to Motor Housing Assembly
- 11 Index
- 12 Disassembly
- 16 Wand Guide
- 17 Wire Harness Replacement
- 25 Carbon Brushes
- 26 Index
- 27 Assembly
- 28 Power Nozzle to Body Assembly
- 29 Hose Sleeve Replacement
- 30 Pivot Bearing Replacement/Wheel Replacement
- 31 Detent Spring Replacement
- 32 Index
- 34 Assembly
- 37 Handle/New Power Cord & Strain Relief Replacement
- 39 Handle and Power Cord Installation
- 40 Impact Bumper Installation
- 41 Assembly
- 42 Clearing Hose and Wand Obstructions
- 40 www.pro-team.com