Implementation methodology. Schneider Electric PL7 Junior/Pro - Premium PLC Application-specific functions - Step-by-step axis control
Pubblicità
Pubblicità
Implementation methodology
2
Implementation methodology for step by step axes control
Structural breakdown of the implementation methodology of a step by step axis
The following flowchart summarizes the different implementation phases. In order to fully understand the different phases, please also look at the Introductory example
TLX DS 57 PL7 40E 09.2000
19
Methodology
20
(See
Introductory example, p. 23) which complements this flowchart.
In local mode
Configuration editor
1
Registering the module in the
PLC configuration
2
Configuration of axis parameters
Configuration editor
Configuration and adjustment modes
Design
3
Programming movements (2)
Program editor
(1)
4
Transferring the application to
PLC memory
In connected mode
5
Adjustment and
Debugging
6
Adjusting axes parameters
Tests and debugging
Configuration editor
Adjustment mode
Configuration editor
Debugging mode
Documentation editor
Folder editor
7
In connected mode
Operation
8
Operation
CCX 17
TLX DS 57 PL7 40E 09.2000
Methodology
(1) If before the programming phase, you want to switch into manual mode, the moving part on different axes, it is possible to miss out step 3. On the other hand, steps 1, 2, 4, 5 and
6 are mandatory.
(2) The programming phase can be preceded by a phase of variable pre-symbolization, carried out using the variables editor. Pre-symbolization allows you to automatically generate the axes control module symbols.
TLX DS 57 PL7 40E 09.2000
21
Methodology
22
TLX DS 57 PL7 40E 09.2000
Scarica
Pubblicità