![](http://s1.manualzz.com/store/data/004194392_1-07b49c90db8031fd7352f65dc294ec18-128x128.png)
Installation Manual
Add to My manuals186 Pages
The Twin Disc EC300 Marine Control System provides remote operation of engine throttle and transmission engagement. The system is designed for use with current Electronic Throttle and/or Electric Shift propulsion systems used within the pleasure and work-boat markets. The EC300 Control has many special features which provide flexibility and adaptability for use with the vast majority of engine/transmission combinations including options such as Engine Sync, Trolling, Shaft Brake, Mechanical Actuator Output, Transmission Oil Pressure and Oil Temperature Monitoring, and Helm Display.
advertisement
![Installation Manual | Manualzz Installation Manual | Manualzz](http://s1.manualzz.com/store/data/004194392_1-07b49c90db8031fd7352f65dc294ec18-360x466.png)
Twin Disc, Incorporated
Electrical Installation
Multi-Station Single Lever Control Head Wiring Installation
This section is applicable to single engine applications with up to three Single
Lever Control Heads. See Figure 30.
CONTROL STATION 1
PORT
CONTROL STATION 2
PORT
CONTROL STATION 3
PORT
CIRCULAR
CONNECTOR
HARNESS, WIRING
PORT LEVER
3 PLACES
TWIN DISC
INCORPORATED
MODEL EC300
P/N 1020676
BOM
S/N
VOLTAGE 12-24VDC
6
J1
7 6
J2
7 6
J3
7
J4 J5 J6 J7
1 12 1 12 1 12
J8 J9 J10 J11 J12 J13
Figure 30. Single Engine Single Lever Control Head Wiring
EC300 Marine Control System Installation Manual #1024168
67
Electrical Installation
Twin Disc, Incorporated
Each single lever harness is designed to connect to the Control Head at one end, and to the EC300 Control’s J1, J2, or J3 connector at the other end. Use
Connector J1 if only one Single Lever Control Head is used. Use Connectors
J1 and J2 if two Single Lever Control Heads are used.
Install the Control Head harness as follows:
2.
3.
Note: The Control Head may be removed from the dash if this facilitates making the connection. If it is removed, then reinstall it after the connections have been made.
Note: Provide enough length in the harness to allow removal of the Control Head in the future.
Refer to General Electrical Installation Guidelines for harness routing criteria.
1.
Connect the circular connector end of the Control Head harness to the
Control Station 1 (main/most used) Single Lever Control Head.
Note: Align the large connector key with the large keyway and push the connector into place. Then, turn the connector’s collar until the engagement snap is felt.
Ensure that the Single Lever Control Head is firmly mounted.
Route the Control Head harness to the EC300 Control.
4.
5.
6.
7.
Connect the Control Head Harness plug to the J1 receptacle of the
EC300 Control.
If applicable, repeat Steps 1 through 4 for connecting additional Control
Stations using J2 for the second Control Head and J3 for the third Control
Head.
If J2 and/or J3 are not used, install a connector kit into these receptacles to seal the connector. See System Drawing for Connector Plug Kit p/n.
Secure all harnesses to a supporting structure with clamps or cable ties at 406 mm (16 in.) intervals.
68 EC300 Marine Control System Installation Manual #1024168
advertisement
Key Features
- Remote throttle control
- Transmission engagement control
- Engine Sync
- Trolling
- Shaft Brake
- Mechanical Actuator Output
- Transmission Oil Pressure and Oil Temperature Monitoring
- Helm Display
Related manuals
Frequently Answers and Questions
What types of vessels is the EC300 Marine Control System suitable for?
What types of engine/transmission combinations is the EC300 Marine Control System compatible with?
What are some of the special features of the EC300 Marine Control System?
advertisement
Table of contents
- 13 Introduction
- 13 Preface
- 15 General Information
- 16 Replacement Parts
- 17 Safety
- 17 Source of Service Information
- 18 Required Tools
- 19 Basic System Components
- 23 Additional Materials
- 25 Component Installation
- 25 General Component Installation Guidelines
- 27 EC300 Control Installation
- 28 Control Head Installation
- 29 Single/Dual Lever Control Head Assembly
- 35 Control Head Lever Drag Adjustment
- 36 Twin Disc Display Installation
- 38 Speed Sensor Installation
- 40 Installation - Magnetic Pick-Up Engine Speed Sensor
- 42 Installation - Hall Effect Pick-Up Output Speed Sensor
- 43 Installation - Tachometer Signal Generator
- 44 Station Doubler Installation
- 46 Servo Actuator Installation
- 47 Servo Actuator Mounting
- 48 Push-Pull Cable Installation Guidelines
- 49 Push-Pull Cable Installation Kits for Conductive Vessels
- 50 Push-Pull Cable Installation Kits for Nonconductive Vessels
- 52 Push-Pull Cable Mounting Bracket and Cable Installation
- 55 Throttle
- 57 Push-Pull Cable Final Adjustment
- 59 Electrical Installation
- 59 General Electrical Harness Information
- 60 General Electrical Installation Guidelines
- 66 Control Head Harness (J1, J2, or J3) Installation
- 67 Multi-Station Single Lever Control Head Wiring Installation
- 69 Multi-Station Dual Lever Control Head Wiring Installation
- 71 tions
- 73 Station Doublers
- 78 Service Connector (J4)
- 78 Transmission Harness (J5, J6, J7 J8, and J12) Installation
- 79 Control to Bracket Wiring Installation
- 81 Bracket to Transmission Wiring Installation
- 82 Neutral Start Interlock Wiring Installation
- 85 Engine Throttle Wiring Installation
- 88 Prewired Connection Inspection
- 89 Engine Control Harness (J5) Installation
- 91 Neutral Start Interlock Wiring Installtion
- 95 Electronic Control Module Throttle Wiring
- 99 Engine Speed Sensor Harness Installation
- 101 Engine Room Analog Harness (J6) Installation
- 103 Transmission Oil Temperature Sensor Wiring Installation
- 104 PWM Driver Harness (J7) Installation
- 108 Shaft Brake Wiring Installation
- 109 Stabilizer Disable Wiring Installation
- 110 Troll Enable Wiring Installation
- 111 Bridge Signals Harness (J8) Installation
- 112 Ignition Switch Wiring
- 114 Manual Override Switch Wiring
- 116 Tachometer Output Wiring Installation
- 118 Twin Disc Display Harness (J9) Installation
- 120 Twin Disc Display Harness Wiring
- 122 Communication Harness (J10) Installation
- 123 Dual Engine Communication Harness Installation
- 125 Multiple Engine Communication Harness Installation
- 127 Servo Actuator Harness (J11) Installation
- 129 Servo Actuator Harness Wiring
- 133 Engine Room Switch Harness (J12) Installation
- 135 lation
- 136 Transmission Oil Pressure Switch Wiring Installation
- 138 EC300 Control Power Wiring
- 147 EC300 Control Bonding Installation
- 151 Engineering Drawings
- 151 List of Engineering Drawings
- 153 Morse 33 Series Cable Mounting Dimensions
- 154 Servo Actuator Mounting Dimensions
- 155 Twin Disc Display Mounting Dimensions (1018791)
- 156 Control Head Mounting Template
- 157 Side Mount Lever Mounting Template
- 158 Side Mount Selector Assembly Mounting Template
- 159 EC300 Control Mounting Dimensions
- 160 EC300 Control Pin Assignments
- 161 System 1 - Single Engine, 1 Station
- 162 System 2 - Twin Engine, 2 Stations Sheet 1 - Port Control
- 164 Sheet 1 - Port Control
- 165 Sheet 2 - Starboard Control
- 168 Wiring Diagram Sheet 1 - Port Control
- 169 Wiring Diagram Sheet 2 - Starboard Control