Installation Manual
Add to My manuals186 Pages
The Twin Disc EC300 Marine Control System provides remote operation of engine throttle and transmission engagement. The system is designed for use with current Electronic Throttle and/or Electric Shift propulsion systems used within the pleasure and work-boat markets. The EC300 Control has many special features which provide flexibility and adaptability for use with the vast majority of engine/transmission combinations including options such as Engine Sync, Trolling, Shaft Brake, Mechanical Actuator Output, Transmission Oil Pressure and Oil Temperature Monitoring, and Helm Display.
advertisement
Twin Disc, Incorporated
Electrical Installation
Multi-Station Dual Lever Control Head Wiring Installation Using Station Doublers
This section is applicable to multiple engine applications with more than three
(3) Dual Lever Control Heads per EC300 Control. Each EC300 Control can directly accept up to three Control Head inputs. Using Station Doublers, a total of five Control Head inputs can be supported. Each Station Doubler combines the signals from two separate Control Heads and routes the combined signals to each of the EC300 Controls at J2 or J3. See Figures 33 and 34.
Figure 33 shows five Control Heads and two Station Doublers. The control head not connected to a station doubler must be connected to J1.
PORT STBD
CONTROL STATION 1
PORT STBD
CONTROL STATION 2
PORT STBD
CONTROL STATION 3
PORT STBD
CONTROL STATION 4
PORT STBD
CONTROL STATION 5
STARBOARD
STATION
A
STBD
STATION
B
PORT
STARBOARD
1020617
PORT
STATION
A
PORT
STATION
B
HARNESS, WIRING
DUAL LEVER
7 PLACES
STARBOARD
PORT
STATION
A
STBD
STATION
B
CIRCULAR
CONNECTOR
7 PLACES
BOX, JUNCTION
STATION DOUBLER
2 PLACES
STARBOARD
1020617
PORT
STATION
A
PORT
STATION
B
PORT CONTROL STARBOARD CONTROL
TWIN DISC
INCORPORATED
MODEL EC300
P/N 1020676
BOM
S/N
VOLTAGE 12-24VDC
6
J1
7 6
J2
7 6
J3
7
J4 J5 J6 J7
1 12 1 12 1 12
J8 J9
2
1
J10
3
4
J11 J12 J13
TWIN DISC
INCORPORATED
MODEL EC300
P/N 1020676
BOM
S/N
VOLTAGE 12-24VDC
6
J1
7 6
J2
7 6
J3
7
J4 J5 J6 J7
1 12 1 12 1 12
J8 J9
2
1
J10
3
4
J11 J12 J13
1020614
RECEPTACLE
T CONNECTOR (J1939)
2 PLACES
CONNECTOR
TERMINATING RESISTOR
2 PLACES
HARNESS, WIRING
COMMUNICATION
1020615
1020614
HARNESS, WIRING
CONTROLLER COMMS
2 PLACES
Figure 33. Typical Five Station Dual Lever Control Head Wiring
EC300 Marine Control System Installation Manual #1024168
73
Electrical Installation
Twin Disc, Incorporated
Note: Station Doublers may also be used on single-engine
Single Lever Control Head applications if more than three
Control Heads are required. Single Lever Control Head
Station-to-Doubler harnesses are used in place of the dual lever station-to-doubler harnesses. A port station-todoubler harness is used with a Port Control Head. A starboard station-to-doubler harness is used with a
Starboard Control Head.
PORT STBD
CONTROL STATION 1
PORT STBD
CONTROL STATION 2
74
TO STBD
CONTROL
TO PORT
CONTROL
BOND WIRE
WITH RING LUG
BOX, JUNCTION
STATION DOUBLER
STATION
A
STBD
STATION
B
STARBOARD STARBOARD
1020617
PORT PORT
HARNESS, WIRING
DUAL LEVER
3 PLACES
STATION
A
PORT
STATION
B
Figure 34. Station Doubler Connection Using Dual Lever Control Heads
Install the Control Head harnesses as follows:
Note: The Doubler-to-Station Harness routes between the
Control Head and the Station Doubler. The Doubler-to-
Control Harness routes between the Station Doubler and the EC300 Control (J2 or J3).
Note: The Control Head may be removed from the dash if this facilitates making the connection. If it is removed, then reinstall it after the connections have been made.
EC300 Marine Control System Installation Manual #1024168
Twin Disc, Incorporated
Electrical Installation
Note: Provide enough length in the harness to allow removal of the Control Head in the future.
Refer to General Electrical Installation Guidelines for harness routing criteria.
Control Station 1
1.
Connect the circular connector end of a Doubler-to-Station harness to the Dual Lever Control Head.
Note: For each Control Head connector, align the large connector key with the large keyway and push the connector into place. Then, turn the connector’s collar until the engagement snap is felt.
Ensure that the Dual Lever Control Head is firmly mounted.
2.
3.
4.
5.
Route the Doubler-to-Station harness to the Station Doubler.
Connect the Doubler-to-Station harness plug marked “PORT” into the receptacle marked “STATION A” on the “PORT” end of the Station
Doubler.
Connect the Doubler-to-Station harness plug marked “STARBOARD” into the receptacle marked “STATION A” on the “STBD” end of the Station
Doubler.
Control Station 2
6.
Connect the circular connector end of a Doubler-to-Station harness to the Dual Lever Control Head.
7.
8.
Ensure that the Dual Lever Control Head is firmly mounted.
Route the Doubler-to-Station harness to the Station Doubler.
9.
Connect the Doubler-to-Station harness plug marked “PORT” into the receptacle marked “STATION B” on the “PORT” end of the Station
Doubler.
10.
Connect the Doubler-to-Station harness plug marked “STARBOARD” into the receptacle marked “STATION B” on the “STBD” end of the Station
Doubler.
EC300 Marine Control System Installation Manual #1024168
75
Electrical Installation
Twin Disc, Incorporated
Doublers to EC300 Control
11.
Connect the circular connector end of a Doubler-to-Control harness to the receptacle on the Station Doubler marked “CONTROL”.
12.
Route the harness marked “PORT” to the EC300 Port Control.
Note: It is desirable, especially on single station vessels, to route the port and starboard harnesses as far apart as possible.
This minimizes the odds of both harnesses being accidently damaged at the same time allowing continued, but reduced, control of the vessel.
13.
Connect the Doubler-to-Control Harness plug to the J2 receptacle of the Port EC300 Control.
14.
Route the harness marked “STARBOARD” to the EC300 Starboard
Control.
15.
Connect the Doubler-to-Control Harness plug to the J2 receptacle of the Starboard EC300 Control.
16.
If applicable, repeat steps 1 through 15 to connect two additional Dual
Lever Control Heads through a second Station Doubler to the J3 receptacles of the EC300 Port and Starboard Controls.
17.
If J2 and/or J3 are not used, install a connector kit into these receptacles to seal the connector. See System Drawing for Connector Plug Kit p/n.
18.
Secure all harnesses to a supporting structure with clamps or cable ties at 406 mm (16 in.) intervals.
76 EC300 Marine Control System Installation Manual #1024168
Twin Disc, Incorporated
Electrical Installation
Bonding Wire
19.
Route a bond wire from the vessel bonding system to the selected mounting pad on each Station Doubler. See Figure 33.
Note: The bonding conductor must be 14 AWG stranded copper wire. It must be colored green with a yellow stripe
(preferred) or green in order to comply with ABYC standards.
20.
Install a ring lug on the doubler end of the wire.
Note: The ring lug must be properly sized for both the wire and the mounting fastener.
21.
Remove the mounting fastener at the bonding connection.
22.
Remove any paint at the mounting connection in order to ensure electrical contact.
23.
Insert the bonding wire’s ring lug on the Station Doubler.
24.
Reinstall and tighten fasteners up to 1.13 Nm (10 lb-in.) maximum.
EC300 Marine Control System Installation Manual #1024168
77
advertisement
Key Features
- Remote throttle control
- Transmission engagement control
- Engine Sync
- Trolling
- Shaft Brake
- Mechanical Actuator Output
- Transmission Oil Pressure and Oil Temperature Monitoring
- Helm Display
Related manuals
Frequently Answers and Questions
What types of vessels is the EC300 Marine Control System suitable for?
What types of engine/transmission combinations is the EC300 Marine Control System compatible with?
What are some of the special features of the EC300 Marine Control System?
advertisement
Table of contents
- 13 Introduction
- 13 Preface
- 15 General Information
- 16 Replacement Parts
- 17 Safety
- 17 Source of Service Information
- 18 Required Tools
- 19 Basic System Components
- 23 Additional Materials
- 25 Component Installation
- 25 General Component Installation Guidelines
- 27 EC300 Control Installation
- 28 Control Head Installation
- 29 Single/Dual Lever Control Head Assembly
- 35 Control Head Lever Drag Adjustment
- 36 Twin Disc Display Installation
- 38 Speed Sensor Installation
- 40 Installation - Magnetic Pick-Up Engine Speed Sensor
- 42 Installation - Hall Effect Pick-Up Output Speed Sensor
- 43 Installation - Tachometer Signal Generator
- 44 Station Doubler Installation
- 46 Servo Actuator Installation
- 47 Servo Actuator Mounting
- 48 Push-Pull Cable Installation Guidelines
- 49 Push-Pull Cable Installation Kits for Conductive Vessels
- 50 Push-Pull Cable Installation Kits for Nonconductive Vessels
- 52 Push-Pull Cable Mounting Bracket and Cable Installation
- 55 Throttle
- 57 Push-Pull Cable Final Adjustment
- 59 Electrical Installation
- 59 General Electrical Harness Information
- 60 General Electrical Installation Guidelines
- 66 Control Head Harness (J1, J2, or J3) Installation
- 67 Multi-Station Single Lever Control Head Wiring Installation
- 69 Multi-Station Dual Lever Control Head Wiring Installation
- 71 tions
- 73 Station Doublers
- 78 Service Connector (J4)
- 78 Transmission Harness (J5, J6, J7 J8, and J12) Installation
- 79 Control to Bracket Wiring Installation
- 81 Bracket to Transmission Wiring Installation
- 82 Neutral Start Interlock Wiring Installation
- 85 Engine Throttle Wiring Installation
- 88 Prewired Connection Inspection
- 89 Engine Control Harness (J5) Installation
- 91 Neutral Start Interlock Wiring Installtion
- 95 Electronic Control Module Throttle Wiring
- 99 Engine Speed Sensor Harness Installation
- 101 Engine Room Analog Harness (J6) Installation
- 103 Transmission Oil Temperature Sensor Wiring Installation
- 104 PWM Driver Harness (J7) Installation
- 108 Shaft Brake Wiring Installation
- 109 Stabilizer Disable Wiring Installation
- 110 Troll Enable Wiring Installation
- 111 Bridge Signals Harness (J8) Installation
- 112 Ignition Switch Wiring
- 114 Manual Override Switch Wiring
- 116 Tachometer Output Wiring Installation
- 118 Twin Disc Display Harness (J9) Installation
- 120 Twin Disc Display Harness Wiring
- 122 Communication Harness (J10) Installation
- 123 Dual Engine Communication Harness Installation
- 125 Multiple Engine Communication Harness Installation
- 127 Servo Actuator Harness (J11) Installation
- 129 Servo Actuator Harness Wiring
- 133 Engine Room Switch Harness (J12) Installation
- 135 lation
- 136 Transmission Oil Pressure Switch Wiring Installation
- 138 EC300 Control Power Wiring
- 147 EC300 Control Bonding Installation
- 151 Engineering Drawings
- 151 List of Engineering Drawings
- 153 Morse 33 Series Cable Mounting Dimensions
- 154 Servo Actuator Mounting Dimensions
- 155 Twin Disc Display Mounting Dimensions (1018791)
- 156 Control Head Mounting Template
- 157 Side Mount Lever Mounting Template
- 158 Side Mount Selector Assembly Mounting Template
- 159 EC300 Control Mounting Dimensions
- 160 EC300 Control Pin Assignments
- 161 System 1 - Single Engine, 1 Station
- 162 System 2 - Twin Engine, 2 Stations Sheet 1 - Port Control
- 164 Sheet 1 - Port Control
- 165 Sheet 2 - Starboard Control
- 168 Wiring Diagram Sheet 1 - Port Control
- 169 Wiring Diagram Sheet 2 - Starboard Control