PRIMERGY RX300 S7 Server Upgrade and Maintenance Manual

Add to My manuals
546 Pages

advertisement

PRIMERGY RX300 S7 Server Upgrade and Maintenance Manual | Manualzz

Expansion cards and backup units

Figure 104: Disconnecting the BBU cable from the BBU

Ê

Carefully disconnect the BBU cable from the BBU.

9.5.3.5

Installing a new BBU

Ê

Install the new BBU into the BBU holder as described in section "Preparing the BBU" on page 221 .

Ê

"Installing the BBU holder onto the air duct" on page 222

Ê

Connect the BBU to the controller.

9.5.3.6

Concluding steps

Perform the following procedures:

Ê

"Mounting the server cover" on page 73

Ê

"Sliding the server into the rack" on page 77

If the server has been completely removed from the rack for maintenance purposes, reinstall and secure it in the rack as described in section

"Mounting the server in the rack" on page 74

.

Ê

"Connecting the server to the mains" on page 78

Ê

If applicable, update the firmware of the RAID controller that has been connected to the BBU as described in section

"Updating RAID controller firmware" on page 95

.

Ê

"Enabling SVOM boot watchdog functionality" on page 100

RX300 S7

Upgrade and Maintenance Manual 231

Expansion cards and backup units

Ê

"Closing the rack door" on page 81

Note on BBU charging and calibration

The BBU may be deeply discharged due to extended storage time and wrongly show as bad or defective in the ServerView RAID Manager.

In this case, the BBU will automatically enter a trickle charge cycle for recovery.

This initial charge may take up to 8 hours before the BBU will initiate a recalibration cycle.

Ê

Enter the ServerView RAID Manager and check the current BBU status.

I

For further information, please refer to the "ServerView Suite RAID

Management" user guide, available online at

http://manuals.ts.fujitsu.com

or from the ServerView Suite DVD 2 supplied with your PRIMERGY server.

Ê

If the BBU is shown as bad or defective, do not power off the server for at least 8 hours to allow the charge and calibration cycles to finish.

Ê

If the BBU status does not change after 8 hours, please try to initiate the recalibration process manually using the ServerView RAID Manager.

I

If this procedure still does not fix the BBU status, please contact your local Fujitsu customer service partner.

232 Upgrade and Maintenance Manual

RX300

advertisement

Key Features

  • Rack mount server
  • Multiple hard disk drives
  • High-speed processors
  • Large amounts of RAM

Related manuals

Frequently Answers and Questions

What are the classifications for procedures in the manual?
The manual classifies procedures into three categories: Customer Replaceable Units (CRU), Upgrade and Repair Units (URU), and Field Replaceable Units (FRU). These classifications help you quickly identify the type of procedure required for a particular task.
What are the safety instructions I need to be aware of before working on the server?
Read the manual "Safety Notes and Regulations" carefully before performing any maintenance or upgrade procedures. This manual contains crucial safety information to ensure your safety and the proper functioning of the server.
What are the average task durations I should expect for common maintenance procedures?
The manual provides estimated task durations for common maintenance procedures, helping you plan your work efficiently. You can get an idea of the time required for tasks like replacing a power supply or a hard drive.

advertisement

Table of contents