广告
广告
6. Maintenance and Inspection
6.1 Daily Inspection
Daily inspection items
No.
1
2
3
Inspection Item
GOT mounting status
Inspection
Method
Check for loose mounting screws.
Criterion
Securely mounted
Action
Retighten screws within the specified torque range.
Retighten terminal screws
Connection status
Loose terminal screws
Proximate solderless terminals
Usage status
Retighten screws with screwdriver
Visual check
Loose connectors
Visual check
Dirt on protection sheet
Foreign material attachment
Visual check
Visual check
Not loose
Proper intervals
Not loose
Not outstanding
Correct
Retighten connector fixing screws
Replace with new one
No foreign matter sticking
Remove, clean
For applicable protective sheet model or replacement procedure, refer to
GT15 User’s Manual.
28
/
广告